Summary
Overview
Work History
Education
Skills
Timeline
Generic

Terry Cannon

Sanderson,FL

Summary

Accomplished Steel Fabricator at New Millennium Systems Installations, skilled in precision cutting and quality control. Enhanced productivity through lean manufacturing principles and effective teamwork, achieving timely project completions. Demonstrated strong problem-solving abilities and adaptability across diverse industries, ensuring high standards and client satisfaction while mentoring junior fabricators.

Overview

2004
2004
years of professional experience

Work History

Steel Fabricator

New Millennium Systems Installations
  • Fabricated steel components using precision tools and techniques to meet project specifications.
  • Interpreted blueprints and technical drawings to execute detailed fabrication tasks.
  • Collaborated with team members to optimize workflow and ensure timely project completion.
  • Conducted quality control inspections on finished products to maintain industry standards.
  • Assisted in training new hires on safe handling of materials and equipment operation.
  • Oversaw junior fabricators, providing mentorship and guidance on complex fabrication challenges.
  • Completed projects in a timely manner with efficient use of time management skills and prioritization of tasks.
  • Maintained equipment functionality with regular inspections and preventative maintenance practices, reducing repair costs and downtime.
  • Streamlined processes by implementing lean manufacturing principles in daily operations to minimize downtime and maximize productivity.
  • Ensured accurate measurements using calipers, micrometers, height gauges, protractors, squares, rulers, layout tools for precision steel fabrication work.
  • Demonstrated adaptability in working across diverse industries such as construction, automotive manufacturing, aerospace engineering for various steel fabrication projects.
  • Optimized resource allocation by effectively managing inventory of raw materials needed for ongoing projects to prevent delays due to shortages.
  • Increased workshop organization by maintaining clean work areas free from hazards while consistently adhering to safety protocols.
  • Contributed to cost savings efforts by recommending alternative materials or design modifications when appropriate without compromising structural integrity or client needs.
  • Reduced production costs by optimizing material usage and minimizing waste during the fabrication process.
  • Supported quality control initiatives by conducting visual inspection of completed welds and verifying adherence to industry standards or client requirements.
  • Mentored junior fabricators, sharing expertise in steel cutting, bending, shaping, and assembly techniques for professional development.
  • Collaborated effectively with engineers, architects, and designers to ensure successful completion of projects that met or exceeded client expectations.
  • Enhanced workplace safety with thorough knowledge of welding techniques, material handling, and machine operation.
  • Collaborated with team members to ensure smooth workflow and maintain high-quality standards during the fabrication process.
  • Consistently met project deadlines through diligent work ethic and effective communication with supervisors on progress updates.
  • Exhibited strong problem-solving abilities during the fabrication process, quickly identifying and addressing issues to avoid costly mistakes or delays.
  • Operated welding equipment to assemble and repair metal structures and elements.
  • Complied with safety regulations while operating machinery and tools to protect against injury.
  • Worked with presses, saws and drills to manipulate metal components for structural fabrication.
  • Altered and trimmed existing metal fabrications to meet size and position requirements.
  • Maintained machinery and tools to keep fabrication processes running smoothly.
  • Followed Operational Safety and Health Administration (OSHA) regulations to promote safe equipment operation and workplace safety.
  • Lifted or moved materials and finished products using large cranes.

Plumber

W.W. Gay
Jacksonville, FL
2006 - 2007

I worked at the Mayo Clinic as a plumber

Insulation Installer

Builders First Source
Jacksonville, FL
2002 - 12.2003

I learned a lot about framing insulating there

Forklift Operator

Sanderson Pipe
Sanderson, FL
06.1997 - 12.1999

I was the shipping foreman for this company 2 years after I graduated

Underground Utility Technician

T.B Landmark
Jacksonville, FL
08.1999 - 08.2000

Education

High School Diploma -

Baker County High School
Glen St. Mary,FL
1997

Skills

  • Hand tool proficiency
  • Plasma cutting
  • Structural steel fabrication
  • Gas metal arc welding
  • Shielded metal arc welding
  • Grinding techniques
  • Blueprint interpretation
  • Technical communication
  • Precision cutting
  • Power tool proficiency
  • Teamwork
  • Teamwork and collaboration
  • Problem-solving
  • Time management
  • Hand and power tools
  • Attention to detail
  • Problem-solving abilities
  • Torch cutting
  • Multitasking
  • Stick welding
  • Multitasking Abilities
  • Reliability
  • Excellent communication
  • Organizational skills
  • Team collaboration
  • Active listening
  • Installation and maintenance
  • Effective communication
  • Adaptability and flexibility
  • Repair work
  • Material handling
  • Decision-making
  • Industrial safety
  • Heavy lifting
  • Metal fabrication
  • Relationship building
  • Safety procedures
  • Machine maintenance
  • Material prepping
  • Machine setup
  • Welding and fabrication
  • Team building
  • Forklift operation
  • Hand-eye coordination
  • Welding
  • Task prioritization
  • Soldering skills
  • Equipment operation
  • Self motivation
  • Interpersonal skills
  • Analytical thinking
  • Goal setting
  • Professionalism
  • Blueprint reading

Timeline

Underground Utility Technician

T.B Landmark
08.1999 - 08.2000

Forklift Operator

Sanderson Pipe
06.1997 - 12.1999

Steel Fabricator

New Millennium Systems Installations

Plumber

W.W. Gay
2006 - 2007

Insulation Installer

Builders First Source
2002 - 12.2003

High School Diploma -

Baker County High School
Terry Cannon