Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic

Terry Coker

Petal,MS

Summary

Meticulous and systematic Surveyor bringing top-notch skills in inspection, testing and quality assurance. Proven skills in meeting demanding standards, maintaining safety and strengthening company team work and materials production. Skilled at creating detailed reports, maintaining records and working with management to resolve concerns.

Overview

21
21
years of professional experience

Work History

Survey Party Chief

LW Survey
Duluth, MN
10.2020 - 09.2021
  • Used TSC7, TRIMBLE PIPELINE MODULE and GPS-R10 equipment to complete field surveys.
  • Performed boundary, topographic and traverse land surveys.
  • Compiled information necessary to stake projects for construction using engineering plans.
  • Trained, mentored and assigned work to subordinate crew members.
  • Compiled, captured and evaluated resource data from source maps using GIS applications.
  • Utilized established field surveying strategies to perform high-quality work.

Survey Party Chief

Universal Surveying And Mapping
Stillwater, OK
06.2017 - 02.2020
  • Used TSC 3, TSC 5 and TSC 7 DATA COLLECTORS and GPS-R8 & R10 and ROBOTIC CONVENTIONAL equipment to complete field surveys.
  • Performed boundary, topographic and traverse land surveys.
  • Compiled information necessary to stake projects for construction using engineering plans.
  • Trained, mentored and assigned work to subordinate crew members.
  • Investigated land details such as deed information at land office in county court house , zoning regulations and subdivision rules.
  • Prepared daily safety meetings with crew members and other employees for a safe work enviroment.
  • Prepared projects by setting control and sending to OPUS for point rotation, and adjustment.
  • Answered questions and provided information to land owners regarding any re-routes of pipeline ROW , and of new created boundaries for property and other concerns.
  • Compared computations from field surveys against historical data and other documentation to determine accuracy of data.
  • Took active role in departmental meetings, discussing geospatial needs and project updates to proactively identify and resolve concerns.
  • Compiled, organized and corrected data with TRIMBLE BUSINESS and OFFICE 365 ( WORD DOC, EXCELL, SHAREPOINT, OUTLOOK, ECT. ) software.
  • Input and updated technical data for use in project reports and sketches.
  • Updated archived information in database to match data provided by engineers on location.
  • Produced detailed maps showing locations of boundaries and topographical features.
  • Created separate grid systems for facilities in construction phase.
  • Used CSV, RXL, DXF files and ALIGNMENT SHEETS as well as PIPELINE MODULE for different survey requirements.
  • Delivered extensive training to new employees on GIS and GPS software to promote effective use and overall productivity.
  • Utilized established field surveying strategies in weld mapping, tie-ins, mainline, road and HDD bores as well as fabrication of valve sights to perform high-quality work.

Pipeline Laborer

Miller Pipeline
Pearl, MS
09.2015 - 05.2016
  • Followed correct reporting procedures for safety concerns and incidents.
  • Laid out materials for efficient project work.
  • Performed repairs on natural gas pipelines.
  • Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.
  • Measured stab depth and scraped HDPE PIPE to correct fitting size.
  • Cut HDPE PIPE after clamped for corrected circle for BUTT FUSION AN ELECTROFUSION to permit passage of the fitting on pipe.
  • Ensured BUTT FUSION was correct FOR HDPE PIPE and for ELECTROFUSION used reference to bar code each HDPE fitting.
  • Ensured that HEAT PLATE was at 400-450 degrees for proper fusion, as well as proper time for fusion.
  • Used clamps and brackets to hold pipe during fusion process.
  • Read and interpreted blueprints and schematics to determine locations, quantities and sizes of materials required.
  • Marked ELECTROFUSION time on PIPE FITTING after cables was removed.
  • Kept detailed job records us MICO SOFT EXCELL maintain up-to-date filing system an used files for daily emails.

Survey Party Chief

Babcock Eagleton Engineering
Houston, TX
02.2012 - 05.2015
  • Used [Type], [Type] and [Type] equipment to complete field surveys.
  • Performed boundary, topographic and traverse land surveys.
  • Compiled information necessary to stake projects for construction using engineering plans.
  • Trained, mentored and assigned work to subordinate crew members.
  • Completed daily data updates and submitted information to quality assurance for review and implementation.
  • Researched and monitored locations of utilities around project sites.
  • Compared computations from field surveys against historical data and other documentation to determine accuracy of data.
  • Input and updated technical data for use in project reports and sketches.
  • Reviewed maps used in company's GPS products and edited representations with GOOGLE EARTH.
  • Reviewed and checked surface models by comparing control points on ground with field equipment readings.
  • Utilized established field surveying strategies to perform high-quality work.

Land Survey Technician

Missouri County Surveyor
Marshfield, MO
01.2009 - 04.2014
  • Set up precise measurement and control equipment.
  • Performed field calculations to complete assessments.
  • Used [Type], [Type] and [Type] equipment to complete field surveys.
  • Performed boundary, topographic and traverse land surveys.
  • Followed all directions giving to me to run equipment such as TOPCON CONVENTIONAL, NIKON CONVENTIONAL, T49 SURVEY CALCULATOR.
  • Created land surveys by use of section corners and other monuments set previously.
  • Calculation of points, line creations, and point creations as well as Alignment building in the field.
  • Maintaining equipment daily, ensuring that batteries was charged.

Survey Technician

Hatch Mott MacDonald
Hattiesburg, MS
10.2008 - 01.2011
  • Used TDS RANGER DATA COLLECTER, RECON DATA COLLECTOR and TSC2 DATA COLLOECTOR as well as GPS R-8 equipment to complete field surveys.
  • Read alignment sheets and helped with weld mapping and shooting environmental boundaries, water bodies, and setting HDD exits and entries.
  • Performed boundary, topographic and traverse land surveys.
  • Compiled information necessary to stake projects for construction using engineering plans.
  • Operated all survey equipment

Machinist

US Army
Washington, DC
02.2001 - 02.2007
  • Manually set up machinery, lathes and grinders.
  • Used CNC and manual equipment to perform both initial and final machining.
  • Calibrated machines to maintain required productivity levels and adherence to quality standards.
  • Closely monitored equipment to detect and report malfunctions and prevent accidents.

Education

Machine Shop - Mechanical Engineering

Jones County Junior College
Ellisville, MS
05.2001

Skills

  • Mathematical Calculations
  • Field Operations
  • Client Support
  • Data Collections
  • Field Surveys
  • Team Communication
  • Construction Surveying
  • Safety Procedures
  • New Construction
  • Project Leadership
  • Service Quality
  • Client Relationships

Additional Information

I am a US ARMY veteran. I am a hard worker, and willing to travel. Dedication and being on time is one of my top qualities.

Timeline

Survey Party Chief

LW Survey
10.2020 - 09.2021

Survey Party Chief

Universal Surveying And Mapping
06.2017 - 02.2020

Pipeline Laborer

Miller Pipeline
09.2015 - 05.2016

Survey Party Chief

Babcock Eagleton Engineering
02.2012 - 05.2015

Land Survey Technician

Missouri County Surveyor
01.2009 - 04.2014

Survey Technician

Hatch Mott MacDonald
10.2008 - 01.2011

Machinist

US Army
02.2001 - 02.2007

Machine Shop - Mechanical Engineering

Jones County Junior College
Terry Coker