Experienced Construction Superintendent with a proven track record of successfully leading teams and managing multiple contractors on projects ranging from $46 million to $50 thousand. Skilled in blueprint interpretation, design comprehension, communication, documentation, computer programs, budgeting, and project management. Possesses extensive knowledge of all construction sub-trades, materials, and supplies, including cold storage and freezer applications spanning from 150 to 60 thousand square feet. Highly motivated with a strong work ethic, adaptability, and exceptional interpersonal skills. Demonstrates the ability to work effectively unsupervised and quickly acquire new skills.
Overview
28
28
years of professional experience
1
1
Certification
Work History
Traveling Construction Superintendent
Cornerstone Industrial Inc.
08.2024 - 11.2024
Collaborated with architects and engineers to resolve design issues, maintaining the integrity of project specifications.
Implemented quality control processes for materials and workmanship, resulting in higher overall project standards.
Monitored construction progress meticulously to ensure compliance with local building codes and regulations.
Maintained strict adherence to safety regulations, resulting in a significant reduction of onsite accidents and injuries.
Conducted thorough site inspections to identify potential risks and implement appropriate mitigation measures.
Optimized resource allocation by strategically scheduling personnel, equipment, and materials for each project phase.
Established effective lines of communication between onsite teams and offsite stakeholders to facilitate seamless coordination throughout the duration of projects.
Fostered a positive working environment that encouraged collaboration and open communication among team members.
Delivered exceptional customer service by addressing client concerns promptly and providing regular updates on project status.
Monitored construction sites for compliance with safety regulations and adherence to standards.
Developed and implemented construction plans according to client specifications and expectations.
Prepared detailed daily project reports for management to review
Scheduled utility service providers according to project timelines.
Used computer software to design construction plans.
Obtained building and specialty permits from local jurisdictional agencies.
Traveling Construction Superintendent
Place Services Inc.
02.2024 - 08.2024
Collaborated with architects and engineers to resolve design issues, maintaining the integrity of project specifications.
Implemented quality control processes for materials and workmanship, resulting in higher overall project standards.
Coordinated logistics efficiently, minimizing downtime associated with material deliveries or equipment availability.
Improved team performance through regular training sessions and constructive feedback on individual progress.
Monitored construction progress meticulously to ensure compliance with local building codes and regulations.
Maintained strict adherence to safety regulations, resulting in a significant reduction of onsite accidents and injuries.
Conducted thorough site inspections to identify potential risks and implement appropriate mitigation measures.
Enhanced project efficiency by implementing innovative construction methods and coordinating with subcontractors.
Ensured timely completion of projects by closely monitoring schedules and proactively addressing potential delays.
Managed budgetary constraints effectively, ensuring all projects were completed within allocated financial resources.
Optimized resource allocation by strategically scheduling personnel, equipment, and materials for each project phase.
Demonstrated strong leadership skills in managing diverse teams of subcontractors, tradesmen, and laborers to achieve collective project goals.
Fostered a positive working environment that encouraged collaboration and open communication among team members.
Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
Monitored construction sites for compliance with safety regulations and adherence to standards.
Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.
Developed contingency plans for unforeseen obstacles, allowing for swift resolution of issues while minimizing impact on overall project timelines.
Prepared detailed project reports for management to review.
Created weekly schedule look ahead and completion updates.
Photo document pre-construction conditions and daily progress.
Traveling Retail Construction Superintendent
Prough's Masonry & Commercial General Contracting
08.2015 - 12.2023
Supervised field crews to maximize quality and work efficiency.
Scheduled subcontractors, consultants and vendors to coordinate completion of jobs and tasks.
Stayed up to date on OSHA and local safety guidelines for construction work, and correctly reported incidents to supervisors.
Evaluated team member strengths and assigned tasks based upon expertise and background.
Aided with obtaining permits or approval of revisions.
Enhanced company development initiatives by solving complex issues and suggesting corrective action.
Delegated assignments based on plans, project needs and knowledge of individual team members.
Drove project objectives on day-to-day operational level by working closely with clients, decision-makers and vendors.
Complied with safety protocols in plan coordination, eliminating potential risks.
Coordinated required inspections with local jurisdictions to identify and quickly resolve any code concerns.
Maintained tight construction standards while instructing sub contractors on quality control.
Initiated onsite safety program and properly trained team members to decrease injuries.
Analyzed project blueprints and specifications to identify exact number of laborers needed to complete job.
Identified and reviewed proposed change order requests.
Delivered reports to project managers each day to detail project updates and likely completion dates, noting delays and causes.
Developed and monitored construction schedules to ensure projects were completed on time and within budget.
Reviewed project plans, specifications, and change orders to ensure accuracy and completeness.
Directed the activities of subcontractors, vendors, and other personnel as required to meet project goals.
Inspected job sites daily for conformance with building codes, ordinances, and other regulations.
Coordinated material deliveries with suppliers to maintain an uninterrupted flow of materials to the job site.
Provided guidance and direction to workers regarding proper installation techniques for various types of construction materials.
Resolved conflicts between general contractors, subcontractors, vendors, inspectors, or owners in a timely manner.
Managed subcontractors effectively, ensuring timely completion of tasks and high-quality workmanship.
Delivered projects ahead of schedule by developing efficient construction processes and coordinating teams effectively.
Coordinated pre-construction activities such as site assessments, permitting procedures, and material procurement to expedite the start of new projects effectively.
Carpenter Foreman
Cmmonwealth Of Pennsylvania - Dept. Of Health
07.2010 - 02.2015
Inspected work performed by carpentry crews to check completion of job specifications.
Supervised teams of up to 4 employees, answering questions and providing feedback on work progress.
Addressed employee issues and conflicts, applying listening and communication skills to promote quick resolution.
Oversaw schedules and assignments for 4 personnel.
Assessed project size to prepare work orders and determine resources needed to complete jobs.
Reviewed and approved time and attendance records of carpentry crews.
Maintained contact with lumber companies and hardware dealers for material pricing.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Trained workers in proper methods, equipment operation and safety procedures.
Inspected sights to evaluate safety, operations and crew performance against objectives.
Sourced suppliers and purchased necessary materials for work.
Managed safety and security of location to prevent intrusion, criminal activity, vandalism and injuries to workers.
Coordinated movement of materials and equipment to job sites, verifying supply readiness prior to project start.
Observed all OSHA and corporate safety regulations and procedures to prevent mishaps and injuries on job sites.
Carpenter
S. Misner Construction
04.2008 - 06.2010
Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
Completed installations of building structures, trim, flooring and cabinetry.
Planned and executed work with proper tools and materials to maximize productivity.
Followed established job site safety regulations and maintained safe and clean work area.
Organized project work by reading blueprints and assessing job specifications to determine optimal plans.
Planned projects by identifying necessary equipment, tools, and required assistance.
Completed precise joining and high-quality finish work by properly anchoring and bracing structures.
Monitored tool and equipment condition and arranged repairs.
Led garages, residential homes and addition projects to completion.
Installed paneling on walls to deaden sound, complete decorations or absorb shock based on individual customer requirements.
Placed building paper over subflooring to protect final flooring material from water damage.
Shaped or cut materials to specified measurements using hand tools, machines and power saws.
Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
Built and hung custom doors and frames.
Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
Specialized in foundations, framing and finish carpentry.
Safely operated electric cordless and hammer drills and cutting torches.
Installed interior doors and hardware, accessories, cubicle curtain tracks and TV brackets.
Completed tasks according to technical document requirements and specifications to work with accuracy.
Followed protocols and stayed organized to provide personal and teammate safety.
Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
Assembled durable, high-quality structures by working with forming systems, hand tools and range of equipment.
Aligned and squared frames and forms for installation.
Properly poured, set and cured concrete.
Repaired roofs and flooring and remodeled bathrooms and kitchens to complete numerous projects in a timely fashion.
Cut and installed insulation for residential and commercial buildings.
Facilitated harmonious working relationships with crew members to prevent problems and conflicts.
Developed proficiency in stain-grade trim work, hanging doors and drilling and setting door hardware.
Carefully read blueprints, sketches and technical drawings to inform comprehensive understanding of project scope and specifications.
Read and interpreted blueprints and construction documents to determine project directives.
Read and effectively used truss-roof prints to cut and set roofs accordingly.
Offered valuable suggestions to clients' remodel needs.
Owner
J & T Construction
04.2000 - 04.2008
Managed day-to-day business operations.
Consulted with customers to assess needs and propose optimal solutions.
Trained and motivated employees to perform daily business functions.
Enhanced operational efficiency and productivity by managing budgets, accounts and costs.
Reconciled daily sales, returns and financial reports in QuickBooks.
Remained up-to-date on current trends and attended industry trade shows and markets to view and order inventory.
Maintained up-to-date administrative records to monitor operational conditions.
Monitored market conditions to set accurate product pricing and take advantage of emerging trends.
Discovered areas of improvement by generating quarterly operational and sales reports.
Improved records management systems for leases and contracts to boost renewals timeliness.
Assessed supplier quality to maintain tight cost controls and maximize business operational performance.
Used knowledge of market trends to create value-added solutions resulting in significant increase in revenues.
Managed daily operations of business, including hiring and training staff.
Identified new opportunities for growth, expansion, and diversification.
Negotiated contracts with vendors and suppliers.
Oversaw budgeting and financial management.
Maintained relationships with existing clients by providing superior customer service.
Implemented quality assurance processes to ensure product excellence.
Ensured compliance with local, state, and federal regulations.
Conducted performance reviews for employees on a regular basis.
Laborer
TSI Titanium
09.2003 - 09.2005
Worked alongside team to accomplish work goals according to schedule.
Loaded, unloaded and moved material to and from storage and production areas.
Prepared job sites by removing debris and setting up materials and tools.
Performed general housekeeping and cleaning tasks.
Utilized construction tools and machinery to effectively complete job site projects.
Observed site safety rules to maximize protections for team members and equipment.
Read and understood orders to accurately measure, cut and lay out needed materials.
Operated equipment such as fork trucks and skidders.
Maintained and repaired facilities, equipment and tools.
Used measuring tools such as gauges and tape measure to identify conforming parts during production.
Used radios and hand signals to coordinate communication between equipment operators and ground workers.
Interpreted job site supervisor's orders and technical documentation to complete accurate work.
Collected measurements and marked locations as part of project preparations.
Recognized and reported potential project challenges and assisted with solutions.
Operated power equipment to move materials and promote job efficiency.
Measured dimensions of finished pieces for conformance to specifications.
Monitored machines during operation to detect sounds of malfunction or excessive vibration and adjusted machines to eliminate problems.
Updated logs and reported on job progress.
Carpenter
S. Misner Construction
07.2001 - 09.2003
Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
Completed installations of building structures, trim, flooring and cabinetry.
Planned and executed work with proper tools and materials to maximize productivity.
Followed established job site safety regulations and maintained safe and clean work area.
Organized project work by reading blueprints and assessing job specifications to determine optimal plans.
Planned projects by identifying necessary equipment, tools, and required assistance.
Completed precise joining and high-quality finish work by properly anchoring and bracing structures.
Monitored tool and equipment condition and arranged repairs.
Placed building paper over subflooring to protect final flooring material from water damage.
Shaped or cut materials to specified measurements using hand tools, machines and power saws.
Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
Built and hung custom doors and frames.
Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
Specialized in foundations, framing and finish carpentry.
Safely operated electric cordless and hammer drills and cutting torches.
Installed interior doors and hardware, accessories, cubicle curtain tracks and TV brackets.
Completed tasks according to technical document requirements and specifications to work with accuracy.
Followed protocols and stayed organized to provide personal and teammate safety.
Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
Assembled durable, high-quality structures by working with forming systems, hand tools and range of equipment.
Aligned and squared frames and forms for installation.
Properly poured, set and cured concrete.
Cut and installed insulation for residential and commercial buildings.
Facilitated harmonious working relationships with crew members to prevent problems and conflicts.
Developed proficiency in stain-grade trim work, hanging doors and drilling and setting door hardware.
Carefully read blueprints, sketches and technical drawings to inform comprehensive understanding of project scope and specifications.
Read and interpreted blueprints and construction documents to determine project directives.
Read and effectively used truss-roof prints to cut and set roofs accordingly.
Studied specifications in blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.
Offered valuable suggestions to clients' remodel needs.
Set and built form systems and set embeds.
Installation Technician
Audio Force
03.1999 - 07.2001
Evaluated equipment to determine if it needed to be repaired or replaced.
Followed all company guidelines regarding safety procedures when out in field.
Used hand and power equipment for hoisting, measuring, testing and drilling of various types of installations.
Maintained high level of safety when using hand and power equipment for hoisting, measuring, testing and drilling of various types of installations.
Maintained updated knowledge of all equipment, products and services to properly educate customers.
Collected customer signatures once installations and repairs were finished to complete fence process.
Completed extensive job report for each service call.
Enhanced performance and maintained work requests, orders, prices and documents.
Supported design and troubleshooting in stereo systems.
Educated and trained new hires on company processes, eliminating process gaps.
Supported design and troubleshooting in electrical systems.
Laborer
Shoenfelt Construction
05.1997 - 03.1999
Worked alongside team to accomplish work goals according to schedule.
Loaded, unloaded and moved material to and from storage and production areas.
Prepared job sites by removing debris and setting up materials and tools.
Performed general housekeeping and cleaning tasks.
Utilized construction tools and machinery to effectively complete job site projects.
Organized materials, tools and equipment to supply team members.
Observed site safety rules to maximize protections for team members and equipment.
Read and understood orders to accurately measure, cut and lay out needed materials.
Operated equipment such as fork trucks and skidders.
Determined materials needed for daily shift and loaded vehicles with equipment and supplies.
Learned basic carpentry, painting and plastering.
Completed paving roads, hauling materials and digging ditches.
Used measuring tools such as gauges and tape measure to identify conforming parts during production.
Prepared and cleaned surfaces for rebuilding purposes by removing damaged tiles, bricks and mortar.
Used radios and hand signals to coordinate communication between equipment operators and ground workers.
Managed loading and unloading of routine shipments, maintaining organized and secure materials to minimize damage.
Interpreted job site supervisor's orders and technical documentation to complete accurate work.
Collected measurements and marked locations as part of project preparations.
Operated power equipment to move materials and promote job efficiency.
Measured dimensions of finished pieces for conformance to specifications.
Constructed and broke down temporary retaining walls and scaffolding to support project needs.
Erected and removed temporary structures such as trench liners and scaffolding to meet team needs.
Monitored machines during operation to detect sounds of malfunction or excessive vibration and adjusted machines to eliminate problems.
Removed imperfections and applied chemical solutions to treat materials and achieve smooth finishes.
Education
High School Diploma -
Purchase Line High School
Commodore, PA
06.1996
Skills
Construction supervision
Change order management
Expertise in Blueprint Interpretation
Deadline-Oriented Planning
Compliance with Construction Regulations
Structured Reporting Practices
Subcontractor Coordination
Punch List Management
Customer relations
Meticulous Organizational skills
Meticulous Quality Assurance
Expense Management
Computer software proficient
Construction software proficient (Procore, Raken, Mondays)
Certification
Certified Superintendent and Project Manager, Walmart - 2015 to current
SWPPP certified, Walmart - 2015 to current
OSHA 10 certified
Forklift certified
scissor and boom lift certified
CPR, first aid, AED certified
Languages
English
Native/ Bilingual
Interests
Video Gaming
Enjoy hobbies that combine physical activity with outdoor exploration
Senior Renewal Specialist/Team lead at Cornerstone Licensing LLC/Cornerstone Support Inc.Senior Renewal Specialist/Team lead at Cornerstone Licensing LLC/Cornerstone Support Inc.