Senior-level construction and project manager with extensive experience in civil, electrical, mechanical, and SCADA systems specializing in communication for security and protection. Demonstrated expertise in corporate management encompassing finance, scheduling, pre-development, and construction within the renewable energy, power, transportation, and water sectors. Proven track record of overseeing full construction installation and conducting quality inspections across various engineering design projects involving wired and rotating turbine components. Seeking a challenging opportunity to leverage skills and experience within a company that prioritizes training, growth, and advancement. Forward-thinking technology professional with a diverse background in enhancing systems to align with business objectives. Skilled in leading projects from inception to completion, contributing significantly to organizational growth and success.

Overview

25
25
years of professional experience

Work History

Sr. Project Construction Manager

National Grid Renewable
08.2020 - Current
  • Nobel Solar and Battery Storage 400MW project in Texas. *Copperhead Solar and Battery Storage 250MW in Texas. *Blevins Solar and Battery Storage 450 MW in Texas. Bingham and Temperance 200 MW Solar project in Michigan.
  • Communicated daily with vendors to keep project fully operational.
  • Assist preconstruction with estimates and detailed project plans
  • Ability to manage Safe Work Environment and Program which includes but is not limited to Job Site Safety Analysis, Rigging Plans, Environmental Risk Planning, Job Audits, Confined Space Programs and Lock and Tag Procedures
  • Analyze, manage, and mitigate risks
  • Perform project reviews to ensure that projects are proceeding according to scope, schedule, budget, and quality standards
  • Experience in driving accountability for financial and operational effectiveness, integrating and aligning efforts within teams, monitoring results, and tackling problems directly
  • Provide consultative guidance on constructability, scheduling, phasing, and staffing
  • Identify differentiating factors concerning approach, design, and constructability
  • Review contractual requirements to determine contractual scope of work and potential conflicts; communicate potential pitfalls and risk management strategies with assigned estimating team members
  • Develop parameters for these studies to stay within project scope and budget
  • Supervise and develop staff by establishing expectations, providing positive and constructive feedback, determining training and development needs, and conducting on-the-job training
  • Track project leads: maintain open communication with the client throughout the project life cycle and deliver a consistent message
  • Actively review and exchange information with operations for all current projects
  • Build and manage subcontractor relationships; facilitate bids and presentations
  • Develop and maintain relationships with the principals at key subcontractors, architectural, and engineering firms for business development purposes
  • Work with Director of Construction & Engineering to develop the project schedule in critical path steps and budget time required to meet deadlines with RTOs and off takers
  • Managed completion of utility scale renewable energy projects (wind, solar, natural gas, battery storage) valued more than $100 million.

Site Project Construction Manager

Mas-Tec Construction Company
06.2018 - 08.2020
  • Project Layout: Xcel Energy Service Company, constructed Hale Wind Farm a 478 MW with Vesta Turbines and a new build on a 14.2-mile 230KV Bundle Transmission Line and Substation
  • OSHA 30 NFPA 70E Electrical Safety -Arc Flash Safety (Required to enter an energized substation.)
  • Directing, planning, and managing Substation and Transmission construction project(s) on jobsites with projects completed ahead of schedule, within budget and in compliance with Company safety and procedural policies
  • The duties of an Electrical Construction Manager will vary by client and project size with varying degrees of responsibility and authority
  • Oversee all Electrical Construction contracts within the area of responsibility, supported by Site Teams at each geographic location or system-based area of responsibility
  • Monitor and oversee construction activities and Subcontractors within the delivery timelines, including development plans, training requirements, and understanding the exact Scope of Work
  • Keep Site manager informed of overall construction activity progress & performance along with monitoring and review of construction key performance indicators
  • Provide input to constructability reviews and manages the optimum contractor involvement activities!
  • Take reasonable care of yourself and others' health and safety and of those who may be affected in the day-to-day delivery of this role by taking personal responsibility for working to the Mas-Tec Zero Injury principles!
  • Cooperate with all matters relating to health and safety, including following safe working procedures always
  • Take an active role in the quality aspect of Substation/Transmission
  • Teach/Coach employees that are assigned to assist you with the scope of work
  • Function as a role model for Mas-Tec vision and values, behaving in ways that are aligned with Mas-Tec ways of working while encouraging others to do so as well
  • Take necessary care to properly protect confidentiality, integrity, and availability of corporate information from unauthorized disclosure, modification, or destruction
  • Supervise & lead teams!
  • Forecast 3-day and 3-week outlooks on activities to mitigate any material delays to the subcontractor
  • Monitor contract performance against project milestones, budget, and other established metrics!
  • Oversee Business Development, Estimating, and Construction as well as follow through with existing clients and sustain business relationships with multiple clients
  • Maintain the high safety standards set by the Program team and the client
  • Review and understand all provisions of contract documents and drawings
  • Manage the processing, logging, and tracking of submittals, Contract and Subcontracts NCR's and RFI
  • Manage and record information related to progress meetings, schedule reviews, document review
  • Manage all elements of change order management, cost estimates, and negotiations
  • Attendance and managing all monthly/weekly/daily contractor and client meetings.
  • Foxtail Wind Farm 100 MW Vesta Turbines with a new build on a 5-mile 230KV Transmission Line and Substation
  • Engie US Renewable Jumbo Hill Wind Farm 200 MW 2.8 GE Turbines with a new build on a 3-mile 115KV Transmission Line and Substation.
  • Freeborn Wind Farm 200 MW Vesta Turbines with a new build on a 7-mile 161KV Transmission Line and Substation

Site Project Construction Manager

Avangrid Renewable
03.2017 - 04.2018

Project layout: Deerfield Wind Site, Green Mountain Power Company. New Substation and Transmission Line build out.

  • 30MW Wind Farm 10-mile Aerial Collector Line
  • Completed inspections on major components: 15 Siemens-Gamesa Wind Turbines (G87 & G97; 2.0 MW)
  • Documented potential discrepancies
  • Conducted audits in the field
  • Completed Mechanical Completion walk-downs
  • Completed wind turbine quality assurance assessments: work offload inspections, retrofits, installation support, punch lists, MCC etc
  • Job Book turnover and Equipment Field Testing Report Equipment Manuals turnover
  • Populated electronic quality documentation to include photos and observations
  • Reported daily progress in compliance with quality documentation to Site Construction Manager
  • Installation and QA/QC Inspection Documentation of 34.5 Collector Aerial Design
  • 44 Wood Poles Install for a 24kv-46kv Collector Line
  • 10 Mile Hendricks Messenger Cable Line install to Poles
  • Hendricks Pole Framing Bracket and Hendricks Aerial Cable Conductor System
  • 12 Pair Fiber Optical OPGW Cut over
  • Installation and QA/QC Inspection Documentation of Substation and Switch Yard Design 34.5 Collector Substation – 69KV Interconnect Switch Yard Duties
  • Oversaw successful completion of multiple projects simultaneously, prioritizing tasks based on urgency and importance.
  • Identified and resolved construction issues promptly to prevent delays.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.
  • Completed projects within time constraints by effectively managing schedules and allocating resources.
  • Obtained building and specialty permits from local jurisdictional agencies.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.
  • Negotiated labor contracts with general contractors and subcontractors.
  • Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Drove completion of projects ahead of schedule, maintaining high standards of workmanship and client satisfaction.

Site Project Construction Manager

AvanGrid Renewable Amazon Wind
03.2016 - 02.2017

Project Layout: New Build of a Substation and Transmission Line for a 208 MW Wind Farm.

  • Installation and QA/QC Inspection Documentation of Underground Collector System Design 34.5 Underground Collector System Duties
  • Civil Trenching and Excavation with Dirt Work Inspection
  • Depth Measurement and Cable Placement Marker Tape
  • Culvert Layout
  • Conduit Layout
  • Prysmian Triplex Insulation Cable Placement with Partial Discharge Testing for Collector System
  • 34.5kv-1250 KCMIL Double Seal
  • 34.5kv-750 KCMIL Double Seal
  • 34.5kv-4/0 AMG Double Seal
  • 4/0 Grounding Wire
  • Cooper T-body Connector use for Down Tower Termination at Switch Gear and JB Location
  • Fiber Patch Panels and Junction Boxes Placement- Verified Splicing and Testing
  • Verified Equipment Testing and Phase Labeling throughout the Site
  • Sectional Cabinet-Junction Box Placement (2-way, 3-way, 4-way)
  • Performed inspections on major electrical components and documented discrepancies: 30-mile Circuit Collector Line, 104 Siemens-Gamesa wind turbines (G-114; 2.1 MW)
  • Performed Mechanical Completion walk-downs
  • Instilled Quality Assurance- work offload inspections, retrofits, installation support, punch lists, MCC
  • Job Book turnover and Equipment Field Testing Report Equipment Manuals turnover
  • Provided electric quality documentation
  • Reported process and documentation to Site Construction Manager Installation and QA/QC Inspection Documentation of 34.5 Collector Aerial Design
  • 98 mixtures of steel and wood Valmont poles
  • 4 circuits of aerial overhead transmission line
  • Installation and QA/QC Inspection Documentation of 34.5 Collector Substation 5 Collector Substation – 230kv Interconnect Switch Yard Duties
  • 2 Collector Riser Pole with a Total of 4 Circuit
  • Oversee offload and installation of the Schweitzer Engineering Laboratories - Control House
  • Enclosure
  • Oversee offload and installation of MPT (2 ILJIN -Main Power Transformer) and the dress out process
  • Install Multiple Circuit Breakers High and Low side
  • Disconnect Switches Motor Operator and Fuse and manual
  • Station Power Service Cut Over
  • Junction Boxes
  • Multiple Insulator throughout substation and switch yard
  • Steel Erection for HV/LV Buss Install / Cut and attach Buss Conductor Jumper
  • Civil Foundation and Gravel backfill Concrete Inspection
  • Grounding Grid
  • Fencing and labeling and Signs
  • 72 Pair Fiber Cut over from substation to O&M SCADA Room
  • Great Deal of Commissioning on the Distribution 34.5kv side and the Interconnect Utilities side.
  • Established a reputation for excellent crisis management skills when unexpected issues arose during construction, quickly developing solutions to minimize project delays.
  • Kept sites compliant with OSHA, state, and local regulations to prevent unnecessary risks.
  • Assisted in organizing and overseeing assignments to drive operational excellence.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Oversaw successful completion of multiple projects simultaneously, prioritizing tasks based on urgency and importance.
  • Developed strong relationships with subcontractors, leading to efficient collaboration on complex construction projects.
  • Adapted project plans in response to unexpected challenges, maintaining project momentum and minimizing delays.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.
  • Developed and implemented construction plans according to client specifications and expectations.
  • Scheduled utility service providers according to project timelines.
  • Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.

Site Project Construction Manager

NextEra Energy Resources
01.2016 - 03.2016
  • Xcel Energy- 140 MW Solar Energy Center: PV total panel installed over 600,000 with Next-Tracker mounting system 6 series module
  • Worked closely with the, Coordinated and monitored essential production costs and schedule
  • Verified all Mechanical installation with Tracker System and Array Block layout
  • Verified DC Cable Layout and termination
  • Implemented LOTO program with the Electrical Superintendent for the project and communication necessary LOTO to field personnel and ensure that LOTO is in place
  • Supported Subcontractor with leadership on resolving resource and project problem areas with design and material.
  • Monitored daily progress on-site to maintain a clear understanding of challenges faced by the team members or any required adjustments in plans or schedules.
  • Adapted project plans in response to unexpected challenges, maintaining project momentum and minimizing delays.
  • Collaborated with structural engineers to evaluate structural integrity of projects.
  • Kept sites compliant with OSHA, state, and local regulations to prevent unnecessary risks.
  • Assisted in organizing and overseeing assignments to drive operational excellence.

Construction Manager (Southern Calif. Edison)

NextEra Energy Resources
10.2015 - 01.2016

Project Layout: Southern Calif. Edison constructed a

280 MW Solar Project: 8 solar panel array blocks; total install 800,000+ single-axis trackers east to west.

  • Worked closely with Project Manager to oversee all reports of any non-conformances
  • Under general supervision of project owners, we oversaw total construction effort to ensure project completed within scope, budget, and schedule
  • Responsible for daily coordination and oversight of multiple subcontractors
  • Assisted the project team to obtain and organize daily reports, scheduling, safety training, materials inventory, and coordination
  • Worked with Project Manager in managing risks and assisted in establishing project recovery plans
  • Ensure a recovery plan is in place
  • Submitted regular progress updates for incorporation into primary plan/schedule to provide variance analysis reporting.
  • Developed strong relationships with subcontractors, leading to efficient collaboration on complex construction projects.
  • Drove completion of projects ahead of schedule, maintaining high standards of workmanship and client satisfaction.
  • Assisted in organizing and overseeing assignments to drive operational excellence.
  • Mentored junior staff members in various aspects of construction management, fostering professional growth within the team.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.

Site Electrical Construction Manager

NextEra Energy Resources
04.2015 - 10.2015
  • 198MW Wind Farm
  • Installation and QA/QC Inspection Documentation of 230KV Transmission Aerial Design Electrical Material and 230kv Transmission Line Duties
  • ESSENTIAL JOB FUNCTIONS:
  • 111 GE 1.7MW turbines
  • 40 miles Transmission Line
  • Performed all site offload of electrical system
  • Made sure Subcontractors are using site documentation, including engineered documents
  • Updated and recorded redline changes and requests for information
  • Set 300 Steel Structure (Valmont Poles)
  • Verified Subcontractor jacking procedure for each structure
  • Pre-Marked the depth of each pole according to the name plate and the design
  • Verified Framing hardware and torque location on steel poles
  • Verified civil excavation and backfill of pole structure
  • Worked with surveying crew on staking location
  • 114 Inspection of GE Per-Lock Pad Mount Transformer
  • GE Turbine Inspection
  • Installed DTE onto Turbine Foundation
  • Oversaw successful completion of multiple projects simultaneously, prioritizing tasks based on urgency and importance.
  • Completed projects within time constraints by effectively managing schedules and allocating resources.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.
  • Implemented systems to improve process efficiency and reduce project duration.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.
  • Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Mentored junior staff members in various aspects of construction management, fostering professional growth within the team.
  • Kept sites compliant with OSHA, state, and local regulations to prevent unnecessary risks.
  • Prepared and managed project budgets to accurately track costs and expenses.

Construction and Material Manager

Bill Finger Westcon Industrial Services
08.2014 - 02.2015

Job Location: Aux Sable Midstream Gas Plant, North Dakota

  • Supported the system management team during request for quotation and sourcing activity, organized supplier kickoff and monthly reviews, drove 100% sourcing on time on new parts, performed negotiation and provided resolution of open issues
  • Managed supplier readiness, drove continuous improvement of component savings opportunities, was responsible for the interface with cross functional organizations to deliver sound financials, and sourcing and delivery of parts to support required milestones
  • Managed and tracked the sourcing process to ensure quality parts are sourced on time and within program targets
  • Coordinated the activities of the company, third party inspectors, contractors, and field personnel
  • Monitored productivity, progress, tracked project costs and reported on project status, identified potential project problems and recommended solutions
  • Ensured compliance with applicable regulatory requirements, company safety, loss, and environmental policies, project scope and constraints, company quality standards and applicable industry codes
  • Maintained project records, procured project material, and maintained related QA/QC records
  • Worked closely with the safety department maintaining a safe work environment by enforcing safety policies and procedures in accordance with regulatory and company standards.
  • Established strong relationships with suppliers to negotiate better pricing and delivery terms.
  • Monitored inventory levels and avoided shortages with timely replenishment of stock.
  • Reviewed and approved purchase orders and invoices for accuracy and completeness.

SR. Field Service Engineer

Ge Oil & Gas Nuovo Pignone Spa
10.2011 - 07.2014
  • Methane Gas Refinery
  • Process Application: Natural/Methane Gas
  • GE Machine Type: 4 MS 6001B Gas Turbine + Generator (GE Nouvo Pignone).
  • Provided oversight during the installation process and worked directly with the start-up engineer during the commissioning phase
  • Ensured proper and safe operation of the machine and equipment by evaluating the running parameters, troubleshoot controls system problems as they arise
  • Disassembled and reassembled complex machinery to repair or replace worn or malfunctioning components.
  • Updated and maintained assigned machines per manufacturer specifications.
  • Recommended design changes, upgrades and replacements to improve systems performance.
  • Delivered high-quality workmanship during installations, adhering to industry standards and best practices throughout each project lifecycle phase.
  • Managed inventory of spare parts, ensuring availability of components for efficient repair operations while minimizing costs.
  • Resolved escalated customer complaints efficiently by actively listening to their concerns and providing tailored solutions that exceeded expectations.
  • Spearheaded internal process improvements that enhanced the overall effectiveness of the field service team's response times and capabilities.
  • Performed onsite installation, modification and maintenance of systems and equipment.
  • Checked safety practices and integrity of PPE.
  • Facilitated communication between office personnel, subcontractors, and customers.
  • Managed administrative tasks such as maintaining customer service logs and internal service records.
  • Diagnosed and repaired problems with electrical and mechanical systems.
  • Tested systems, noting issues and completing preventive maintenance.
  • Worked with diverse types of weather and ground conditions.
  • Maintained strong focus on safety and efficiency to provide comprehensive support to personnel performing skilled repairs.
  • Translated main cable and equipment location blueprints to technicians while declaring system outages and rerouting staff for timely service completion.

Job Location: Energy Platform Project: Nobel Energy Platform Equatorial Guinea Offshore (AFRICA) Process Application: Oil and Natural/Gas

  • Served as primary point of contact for triaging technical issues.
  • Mentored junior team members, fostering professional development opportunities aimed at enhancing skill sets and knowledge base.
  • GE Machine Type: 2 PGT 25 / SAC + 2BCL 406/B
  • To GE Oil & Gas offices, prepare field services jobs and interventions with the project managers
  • Lead and execute foundation and soft foot check and adjustments
  • Lead and execute ST shaft alignment and be able to perform coupling installation
  • Lead and execute minor inspection of ST with journal/thrust bearing and seals inspection and clearance check
  • Assist Start-up Engineer during the commissioning phase ensuring proper and safe operation of the machine by evaluating the running parameters and troubleshooting control system problems as they arise
  • Draft accurate professional reports acting as single point of contact between Customers and GE-Oil & Gas Headquarter concerning technical issues and interfacing with all involved functions!
  • Use company e-tools to retrieve technical documents and management of packing list, bill of material and drawings
  • Ensure all field activities are conducted safely complying with company environmental health & Safety (EHS) guidelines and procedures!
  • Ensure reliability of Customers' assets and support GE O&G customers
  • Strong knowledge of Steam Turbine Equipment's and their auxiliaries (lube oil system, steam system
  • Ability to understand and implement mechanical drawings (ST section DWG, ST, and auxiliaries construction DWG; P&ID; alignment specification, flushing/steam blowing procedure; piping specification; computer skills
  • Strong analytic and critical thinking skills, Good interpersonal & organizational skills
  • Valuable experience in steam turbine major inspection and their auxiliaries (trip valve, servo cylinder)

SR. Field Service Manager

General Electric Power & Energy
06.2000 - 10.2011
  • GE Renewable (Wind)
  • Participated and supported daily Toolbox ideas, suggestions, and guidelines for a safer working environment
  • Conducted regular performance evaluations, identifying areas for improvement and implementing corrective actions as needed.
  • Managed a team of technicians, providing support and guidance for professional development.
  • Streamlined field operations for improved efficiency and reduced response times.
  • Established strong relationships with clients, fostering long-term loyalty and repeat business.
  • Maximized resource utilization by reallocating personnel based on workload demands and skillsets.
  • Assessed operational needs and equipment availability to develop personnel schedules and assignments.
  • Reduced time to complete service calls and expertly retained key customers.
  • Implemented quality control measures to maintain high standards of service delivery.
  • Improved safety records through rigorous enforcement of industry regulations and best practices.
  • Installed and provided technical support for equipment.
  • Translated main cable and equipment location blueprints to technicians while declaring system outages and rerouting staff for timely service completion.
  • Established performance goals for employees and provided feedback on methods for reaching those milestones.
  • Evaluated employee performance and conveyed constructive feedback to improve skills.
  • Maintained professional demeanor by staying calm when addressing unhappy or angry customers.
  • Established team priorities, maintained schedules and monitored performance.
  • Assisted in organizing and overseeing assignments to drive operational excellence.
  • Planned, created, tested and deployed system life cycle methodology to produce high quality systems to meet and exceed customer expectations.
  • Trained as a Generator Assembler/Electrician including WINERGY, VEM, and HITACHI Generators-multiple torque values on flex couplings, electrical bushings, air ducts, drilling, tapping, and grinding in accordance with Quality Control, and Wire prep-fiber optics, wiring schematics and sensors
  • Install RTU to provide communications between the substation and O&M, Utility, and other remote access information
  • SCADA panels are installed, terminated and evaluated (OTDR, providing testing before and after installation) Testing equipment must be calibrated by third party agency
  • Rotating Equipment Installed and performed with vibration and diagnostic testing
  • Computer Programs: Oracle, Maximo, Viewpoint, Procore
  • Planning and Scheduling software outline for Reliability and Conditioned-based Maintenance which is Predictive Maintenance

Education

Technical Trade - Gas and Steam Turbine Compressors

GE-Nouvo Pignone Mechanical Equipment Trade
GE Italy
06-2011

Pace High School Graduate - Engineering

Pace High School
Pace, Florida
05-1993

Skills

  • Project management
  • Construction management
  • Problem-solving
  • Site management
  • Team building and leadership
  • Decision-making
  • Excellent customer relations
  • Organized and detail oriented
  • Management
  • New construction
  • Project documentation
  • Contract negotiation
  • OSHA compliance
  • Change order management
  • Reading blueprints
  • Design experience
  • Operations oversight
  • Budget management
  • Specifications review
  • Best building practices
  • Quality inspection reports
  • Team collaboration
  • Risk assessment
  • Contract monitoring
  • Logistics coordination
  • Health and safety compliance
  • Effective communication
  • Critical thinking
  • Time management
  • Project budgeting

Certifications Skills

  • OSHA 30
  • NFPA 70E Electrical Safety -Arc Flash Safety
  • Strong critical thinking skills
  • Ability to understand and implement mechanical drawings
  • Computer Programs: Oracle, Maximo, Viewpoint, Procore

Personal Information

  • Remote
  • Direct
  • Travel
  • Visa Status: U.S. Citizen

Timeline

Sr. Project Construction Manager

National Grid Renewable
08.2020 - Current

Site Project Construction Manager

Mas-Tec Construction Company
06.2018 - 08.2020

Site Project Construction Manager

Avangrid Renewable
03.2017 - 04.2018

Site Project Construction Manager

AvanGrid Renewable Amazon Wind
03.2016 - 02.2017

Site Project Construction Manager

NextEra Energy Resources
01.2016 - 03.2016

Construction Manager (Southern Calif. Edison)

NextEra Energy Resources
10.2015 - 01.2016

Site Electrical Construction Manager

NextEra Energy Resources
04.2015 - 10.2015

Construction and Material Manager

Bill Finger Westcon Industrial Services
08.2014 - 02.2015

SR. Field Service Engineer

Ge Oil & Gas Nuovo Pignone Spa
10.2011 - 07.2014

SR. Field Service Manager

General Electric Power & Energy
06.2000 - 10.2011

Technical Trade - Gas and Steam Turbine Compressors

GE-Nouvo Pignone Mechanical Equipment Trade

Pace High School Graduate - Engineering