Summary
Overview
Work History
Education
Skills
Timeline
Generic

Terry Williams

Houston,TX

Summary

I can perform in different types of weather conditions to complete accurate and efficient field surveys. Competent in using different equipment and complying with local regulations. Hardworking, responsible and punctual team player.

I have the ability to read and interpret drawings/specifications and understand all aspects of the land survey project specifications and tolerances. They perform regular field QA/QC checks to ensure the data collected is accurate.

Overview

10
10
years of professional experience

Work History

Survey Party Chief

Zachry Construction Corporation
Port Sulphur, Lousiana
09.2023 - 01.2024
  • Determined methods and procedures for best establishing or reestablishing survey control
    • Coordinated findings with engineering and architectural personnel
    • Identify safety risks and the precautions required to eliminate those risks.
    • Manage Crew in regards to processes, scheduling, costs, employee relations issues, and employment needs (Instrument man & Rodman)
  • Organized survey crew and equipment for field operations.
  • Developed survey plans, established project benchmarks, and prepared detailed reports.
  • Maintained daily records of work performed and materials used during survey projects.
  • Performed calculations necessary for determining positions, shapes, areas and contours of features being surveyed.

Survey Party Chief

Weisser Engineering & Surveying
Houston, TX
09.2013 - 09.2023
  • As a Land Surveying Field Crew Chief, I would oversee the daily field operations of a Land Survey Crew to determine the most efficient plan of action for field surveys through all field project phases.
  • Organized survey crew and equipment for field operations.
  • Communicating daily with the Chief of Crews, the associated Project Manager and technician regarding the project schedule and progress of work. They periodically interact professionally with client representative and landowners.
  • Ensured accuracy of survey data by performing quality control checks on all surveys.
  • Analyzed collected data to determine the position of points, lines, boundaries, elevations.

Education

GED -

Reagan High School
Houston, TX
05-2008

Skills

  • proficient with modern surveying equipment including GPS, Total Stations, Robotic Stations, Data Collectors and software
  • Data Collection
  • Manage Crew in regards to processes, scheduling, costs, employee relations issues, and employment needs (Instrument man & Rodman)
  • Land surveying
  • Boundary determination

Timeline

Survey Party Chief

Zachry Construction Corporation
09.2023 - 01.2024

Survey Party Chief

Weisser Engineering & Surveying
09.2013 - 09.2023

GED -

Reagan High School
Terry Williams