Summary
Overview
Work History
Education
Skills
Timeline
Custom Vinyl Installation Technician

Thomas Adler

Prism Floors LLC
LAS CRUCES,NM
8
years of professional experience

Skilled technician with experience in welding, fabrication, and custom vinyl installation. Known for accurate measuring, clean installation work, and consistent productivity in fast-paced jobsite environments. Brings strong teamwork, customer service, and safety focus to every project.

Work History

Custom Vinyl Installation Technician

2 Years 3 Months
Prism Floors LLC | 08.2024 - Current
  • Installed vinyl wrap materials to specifications and site measurements.
  • Completed installations on schedule while following company policies and safety guidelines.
  • Measured, cut, and fitted materials for clean, seamless finishes.
  • Supported fast-paced work demands with consistent productivity.
  • Worked well in a team setting, providing support and guidance.
  • Demonstrated respect, friendliness, and willingness to help wherever needed.

Welder Fabricator

1 Year 4 Months
Alaska Structures | 03.2023 - 07.2024
  • Supported fabrication of structural components from blueprints, weld symbols, and exact measurements.
  • Assisted with MIG welding on aluminum assemblies for modular structures.
  • Checked welds and finished joints for defects, code compliance, and structural strength.
  • Used grinders, saws, drills, and fabrication equipment to prepare materials efficiently.

Welder

2 Years 2 Months
Zipp Construction | 01.2021 - 03.2023
  • Read blueprints and welding symbols to help fabricate structural components accurately.
  • Carried out MIG welding on steel frameworks and assemblies.
  • Checked welds for quality, alignment, and project-spec compliance.
  • Set up welding equipment, torches, and power tools for daily construction work.
  • Measured, cut, and fitted metal materials to support precise field installation.

Welder/General Labor Worker

2 Years 8 Months
Denney Construction | 03.2019 - 11.2021
  • Performed MIG welding on steel frames and assemblies.
  • Read blueprints and welding symbols to build structural components accurately.
  • Prepared welding equipment, torches, and power tools for daily construction work.
  • Measured, cut, and fit metal materials to support precise field installation.
  • Removed old roofing materials and prepared surfaces for installation
  • Helped with erecting scaffolding and ladders.
  • Installed shingles, underlayment, and flashing according to job specifications
  • Loaded, moved, and organized lumber, tools, and materials for efficient jobsite access.
  • Operated hand and power tools safely while completing demolition and construction duties.
  • Measured and cut materials accurately to meet blueprints and project specifications.

Education

Associate of Science - Welding Technologies

Dona Ana Community College | Las Cruces, NM | 05-2020

Skills

Equipment installation
Outdoor installations
Installation planning
Repair services
Maintenance and repair
Power tools operation
Specialty tools
Worksite safety
Work inspection
Quality assurance
Repair services management
Problem analysis
Project management
Basic carpentry
Client communication

Timeline

Custom Vinyl Installation Technician

Prism Floors LLC
08.2024 - CurrentRead More

Welder Fabricator

Alaska Structures
03.2023 - 07.2024Read More

Welder

Zipp Construction
01.2021 - 03.2023Read More

Welder/General Labor Worker

Denney Construction
03.2019 - 11.2021Read More

Dona Ana Community College

Associate of Science from Welding Technologies
Read More
Thomas Adler