Professional Summary
Overview
Work History
Education
Skills
Timeline

Thomas Crosby

Duval Concrete Services
Pensacola ,Fl
2
years of professional experience

Dedicated concrete laborer with strengths in power tools and safety compliance. Proven ability to efficiently manage concrete mixing and pouring while ensuring quality workmanship and promoting teamwork. For what I lack in knowledge being I only have around 6 months experience, I'll make up in work ethnic and dependability, until I learn all the ends and outs, quick learner not lazy, if something needs doing I'll do it, not wait on the next guy, you want be sorry you hired me

Work History

Concrete Construction Laborer

7 Months
Duval Concrete Services | 03.2019 - 10.2019
  • Assisted in mixing and pouring concrete for various construction projects.
  • Operated hand tools and machinery to shape and finish concrete surfaces.
  • Followed safety protocols to maintain a secure work environment.
  • Collaborated with team members to ensure timely project completion.
  • Prepared job sites by clearing debris and organizing materials efficiently.
  • Monitored weather conditions to determine optimal working conditions for concrete setting.
  • Maintained tools and equipment, ensuring they were in good working order.
  • Promoted a clean worksite environment by consistently collecting trash, excess materials, and discarded equipment during all phases of construction.
  • Ensured quality workmanship with precise leveling and aligning of concrete during the curing process.
  • Contributed to a positive work environment by cooperating with team members, sharing knowledge and best practices for efficient task completion.
  • Collaborated with team members to complete tasks on time while adhering to construction plans and specifications.
  • Supported project completion by setting up and dismantling concrete forms, framework, and scaffolding.
  • Enhanced project efficiency by assisting in the preparation of construction sites, including cleaning and removing debris.
  • Improved crew productivity by effectively mixing, pouring, and spreading concrete for various construction projects.
  • Assisted in minimizing project delays by promptly addressing equipment malfunctions and coordinating repairs or replacements as needed.
  • Expedited job progress with efficient transportation of materials such as gravel or sand to designated areas within the worksite using wheelbarrows or other vehicles when needed.
  • Increased safety measures by identifying potential hazards and notifying supervisors or taking corrective action when necessary.
  • Optimized project outcomes by effectively communicating with supervisors and team members regarding progress updates and any challenges encountered during construction.
  • Reduced material waste with accurate measuring and cutting of wooden or metal formwork components for use in forming concrete shapes.
  • Aided in the reduction of project costs through diligent maintenance of tools and equipment used throughout the construction process.
  • Supported the longevity of structures by applying appropriate sealants to protect finished concrete surfaces from weather damage.
  • Ensured high-quality results by performing necessary repairs to concrete surfaces, including patching cracks or filling voids.
  • Set wood and other forming materials to prepare for concrete pours.
  • Assisted with concrete mixing, following instructions for proper ratios of cement, sand and water.
  • Utilized wheelbarrows, shovels and other tools to move, spread and level concrete.
  • Demolished and repaired old concrete surfaces.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Safely operated concrete-cutting and finishing drills, power saws and trowels to complete assigned tasks.
  • Routinely lifted and moved items weighing up to Number pounds.
  • Operated diverse manual and power tools to cut and shape concrete to required specifications.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Cut, chipped, or sawed concrete to create desired shapes.
  • Adhered to safety and reporting procedures.
  • Wore correct clothing and protective equipment for jobs.
  • Applied sealers or waterproofing to concrete as required by project.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.
  • Completed physically demanding tasks such as lifting up to Number pounds to move job materials.
  • Inspected concrete structures for complete fills, defects, or damage.
  • Repaired damaged items using different chemicals and tools.
  • Installed forms for shaping, insulating, or creating decorative effects in concrete.

Forman/Labor

1 Year 6 Months
K&K Builder's | 08.2017 - 02.2019

I work for the superintendent we were building a five-story Hyatt motel the concrete guys we had subcontracted to do work were so we were sent to help them a lot with building forms tearing down forms and miscellaneous things in between for several months

Education

GED

Okefenokee Technical College | Waycross, GA

Skills

Power tools
mixing
understanding what needs to be done and what needs to be done in order to get that done and then doing those things
that is a skill these days

Timeline

Concrete Construction Laborer

Duval Concrete Services
03.2019 - 10.2019Read More

Forman/Labor

K&K Builder's
08.2017 - 02.2019Read More

Okefenokee Technical College

GED
Read More
Thomas Crosby