Summary
Overview
Work History
Education
Skills
Timeline
Generic

Thomas Gainey

Ponchatoula,LA

Summary

Motivated Technician proficient in hands on work and critical thinking. Highly skilled in quickly interpreting blueprints, schematics and wiring diagrams. Confident individual with over 7 years of experience in the construction industry.

Overview

11
11
years of professional experience

Work History

Automotive Mechanic

TG Sales
01.2024 - Current
  • Replaced damaged, missing, or defective parts with new and refurbished components.
  • Test drove vehicles to determine problems and test repairs.
  • Completed full vehicle inspections to check for leaks, damage, or other issues of concern.
  • Inspected and tested equipment to locate worn and damaged parts.
  • Changed vehicle oil and replaced filter.
  • Inspected and tested vehicles and completed preventive maintenance such as engine tune-ups, oil changes, tire rotations, wheel balancing, and filter replacement.
  • Followed established safety procedures and techniques when working under lifted vehicles.

Electrical Technician

ISC Constructors
04.2023 - 12.2023
  • Installed electrical conduit and wiring for power, controls, and lighting.
  • Replaced faulty wiring, switches and circuit breakers to reduce fire risks, boost service capacity and increase versatility.
  • Tested wiring and other system parts for electrical flow and function.
  • Disconnected and removed motors and pumps.
  • Inspected equipment for defects and safety hazards and completed necessary repairs.
  • Collaborated with a team to successfully complete large-scale installation projects within strict deadlines.
  • Assisted in training new hires on proper installation techniques, boosting overall team performance and knowledge base.
  • Conducted thorough post-installation assessments to identify any potential issues early on before they became larger problems later down the line.

Maintenance Technician III

TLC Linen Services
06.2021 - 11.2022
  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Troubleshot equipment breakdowns and performed preventive maintenance.
  • Followed work orders and specifications for machine and equipment replacement, repair or maintenance.
  • Quickly responded to internal service calls regarding malfunctioning equipment and completed repairs.
  • Worked with building managers to assess ongoing needs and plan preventive maintenance and cleaning schedules.
  • Partnered with facility management to successfully complete projects within anticipated deadlines.
  • Worked frequently with mechanical and plumbing systems to complete knowledgeable inspections and skilled repairs.
  • Trained junior maintenance professionals on correct repair and cleaning procedures.
  • Calibrated temperature and equipment settings to optimize performance.
  • Determined new technique to streamline maintenance processes to increase workflow.
  • Studied system requirements to order components and parts and perform acceptance tests.
  • Removed dirt and lubricated machinery shafts, bearings and gears as part of regular maintenance.
  • Conduct blow-downs & keep detailed daily logs of boiler operations for a 300HP Cleaver Brooks boiler.
  • Start-up & shut-down boiler procedures according to state and manufacturer specifications.
  • Troubleshoot & replace componets on live steam lines.

Plant Maintenance Technician

CLARIANT Oil & Mining Services
11.2018 - 01.2020
  • Worked with building managers to assess ongoing needs and plan preventive maintenance and cleaning schedules.
  • Performed electrical and mechanical repairs of production equipment, minimizing downtime .
  • Calibrated temperature and level instrumentation to optimize performance.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Finalized work on building systems by completing basic carpentry and other finish work.
  • Reviewed blueprints and specifications to identify most effective ways to approach build and demo projects.
  • Troubleshot and diagnosed problems with mechanical and electrical systems and equipment.
  • Fabricated and modified unsafe piping and equipment through isolation and restoration.
  • Conducted repairs on 3phase motors and suction equipment, typically returning machines and tools to functionality within 1 day .

Journeyman Pipefitter

PCL Construction
10.2017 - 11.2018
  • Fabricated and installed screw pipe, socket weld pipe and stainless steel tubing.
  • Utilized welding equipment and torches to safely complete predetermined operations .
  • Coordinated movement of materials and equipment to job sites.
  • Threaded pipes using piping machines.
  • Cut and drilled holes in walls to permit passage of pipes.
  • Read and interpreted blueprints and schematics to determine locations, quantities and sizes of materials required.
  • Planned pipe system layout, installation and repair according to specifications.
  • Laid out full-scale drawings of pipe systems, supports and related equipment according to blueprints.
  • Identified equipment and production non-compliance issues and notified foreman to facilitate resolution.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Conducted thorough inspects and tests of previously installed systems to locate and correct faults.

Pipefitter B Class & Welder Helper

STRIKE Construction
06.2015 - 10.2017
  • Fetched materials, equipment and tools for welding professionals.
  • Removed trash and excess materials to clean up work areas.
  • Bolted, clamped and tack-welded parts to secure components prior to welding.
  • Supported machine operators in setup and operation of production equipment resulting in efficient runs.
  • Operated equipment such as angle grinders and pipe threaders on daily basis to achieve completion.
  • Maintained equipment in good working order.
  • Documented production information via daily system logs and discussed issues with management.
  • Examined structure and texture of parts to detect imperfections.
  • Operated hoists, cranes and power tools to dismantle equipment to find and remove defective parts.
  • Salvaged and rebuilt parts to achieve cost savings and reduce waste.
  • Assembled structural forms such as boiler parts and pressure vessels.
  • Minimized warping by using good fitting, burning and welding techniques.
  • Blew out machines, checked welding leads and wiring and changed filters for preventive maintenance.
  • Observed hydrostatic and dimension tolerance tests to evaluate weld quality and conformance to specifications.
  • Interpreted verbal and written instructions from work orders and welding blueprints.
  • Clamped, held, tack-welded, heat-bent, ground and bolted component parts to achieve required configurations and positions.
  • Removed and repaired unacceptable welds with air arc and grinder to meet quality guidelines.

General Laborer & Instrumentation Helper

Ardent Services LLC
01.2014 - 06.2015
  • Collaborated with team members to carry out efficient work with optimal safety and achieve timetables.
  • Performed general housekeeping and cleaning tasks, including, sweeping, pulling weeds, painting and power washing.
  • Measured dimensions of finished workpieces for conformance to specifications, using precision measuring instruments, templates and fixtures.
  • Used measuring tools such as gauges and tape measure to identify conforming parts during production.
  • Read work orders or received oral instructions to determine work assignments and equipment and materials needed.
  • Multi-tasked on heavy equipment, including forklifts, skid-steers, & front-end loaders and improved project completion times.
  • Accurately read blueprints and job specifications to plan completion of each job.
  • Produced parts and assemblies quickly and efficiently within tolerances.
  • Operated forklift to load and unload materials and equipment on trucks.
  • Participated in safety seminars.
  • Assisted team members with tasks that require group effort.
  • Worked alongside staff to discuss and implement best practices and exceed team objectives.
  • Carefully cut PVC and steel according to specifications, which in turn reduced wasteful spending.
  • Expanded revenue by effectively prioritizing jobs and processing work orders.
  • Calibrated and trouble shot instrumentation with Hart communicator.
  • Stroked valves and wired series circuits to test equipment.

Education

Instrumentation

ABC Technical School
St. Rose, La

Licensed - Louisiana Second Class Stationary Boiler

Peasrson Vue
New Orleans, LA
06.2022

High School Diploma -

Springfield Prep
Springfield, La
01.2013

Skills

  • Electrical Component Replacement
  • Machinery Maintenance
  • Blueprint and Schematic Understanding
  • Problem Detection and Resolut
  • Problem-Solving Ability

Timeline

Automotive Mechanic

TG Sales
01.2024 - Current

Electrical Technician

ISC Constructors
04.2023 - 12.2023

Maintenance Technician III

TLC Linen Services
06.2021 - 11.2022

Plant Maintenance Technician

CLARIANT Oil & Mining Services
11.2018 - 01.2020

Journeyman Pipefitter

PCL Construction
10.2017 - 11.2018

Pipefitter B Class & Welder Helper

STRIKE Construction
06.2015 - 10.2017

General Laborer & Instrumentation Helper

Ardent Services LLC
01.2014 - 06.2015

Instrumentation

ABC Technical School

Licensed - Louisiana Second Class Stationary Boiler

Peasrson Vue

High School Diploma -

Springfield Prep
Thomas Gainey