Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Thomas Gregorich II

Sacramento,CA

Summary

Construction professional prepared to oversee site operations and drive project success. Known for maintaining high standards and effective team collaboration. Reliable in adapting to changing site conditions and ensuring safety compliance. Skilled in project management, problem-solving, and team leadership.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Assistant Superintendent

TRI Pointe Homes
10.2023 - 01.2026
  • Assisted in managing subcontractors, fostering clear communication and collaboration on-site.
  • Developed and maintained project schedules, identifying potential delays and implementing corrective actions.
  • Ensured compliance with local building codes and regulations through diligent attention to detail during inspections and adherence to permit requirements.
  • Participated in pre-construction meetings to review design documents, identify potential issues, and establish expectations for all parties involved.
  • Contributed to successful project completion by preparing daily reports, monitoring progress, and updating schedules as needed.

Project Manager

KGPCo.
08.2022 - 10.2023
  • Led cross-functional teams to deliver projects on time and within budget.
  • Developed project plans outlining scope, timelines, and resource allocation.
  • Cultivated relationships with vendors to enhance collaboration and service delivery.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Monitored project progress and adjusted plans as needed to meet evolving requirements.

Construction Manager

Synergy
03.2021 - 04.2022
  • Built and managed towers, rooftops, and small cell projects from start to finish.
  • Performed Scoping walks, and bid walks with General Contractors, vendors, city employees, and utility companies. I also completed Redlines, construction, and assisted COPs.
  • Held construction progress and regular status meetings with project team.
  • Implemented cost control measures, improving budget adherence across multiple projects.

Construction Manager

Advanced Wireless And Logistics
01.2017 - 03.2021
  • Led project planning and execution for multiple large-scale construction projects, ensuring timely completion within budget.
  • Oversaw and onboarded subcontractor for all project's while also managing our internal crews, fostering strong relationships to enhance project efficiency.
  • Implemented safety protocols and compliance measures, significantly reducing on-site incidents and improving worker safety.
  • Developed project schedules using industry-standard software, optimizing resource allocation and task sequencing.
  • Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline limitations and budget constraints.
  • Kept sites compliant with OSHA, federal, state and local regulations to prevent unnecessary delays.
  • Constructed cell sites on rooftops, towers, and small cell projects from start to finish.
  • Performed Scop walks, bid walks with vendors, city employees, utility companies, and school districts.

Site Foreman

Advanced Wireless And Logistics
03.2016 - 04.2017
  • Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Review blueprints, specifications, and drawings to fully understand project scope before starting.
  • I identified issues with antenna system components and applied troubleshooting to rectify the issues.
  • Rigged and hoisted equipment and materials into position using cranes, rigging tools, and gin poles.
  • Determined required installation methods and assembled proper tools and equipment to complete projects to specifications
  • Rigged towers, monopoles and rooftops to build new tower or collocate antenna on existing structure under FCC guidelines.
  • Analyzed user-generated trouble tickets on cell site's to determine between Fiber loss, power loss, or faulty equipment.
  • Promoted a positive work environment by fostering teamwork and addressing conflicts in a timely manner.

Education

High School Diploma -

Woodcreek High School
Roseville, CA
06.2007

Skills

  • Effective communication
  • Residential construction
  • Construction management
  • Blueprints and schematics
  • Project Management
  • Safety policies and procedures
  • Staff Management
  • Commercial construction
  • Troubleshooting
  • Technical communication skills
  • OSHA 30
  • Team Leadership
  • Build Pro Certified
  • Time management
  • Teamwork

Certification

  • PIM Master Certified , through ANRITSU
  • Site Master Certification, through ANRITSU
  • OSHA 30 Certificate
  • Competent Climber and Rescue certificate, through COMTRAIN USA
  • Competent Rigger Certificate , through SPECIFIC SAFETY SOLUTIONS
  • CPR and First Aid Certified, through LIFE SUPPORT NETWORK
  • Certified TT1, through NWSA
  • Areal Lift Certification

Timeline

Assistant Superintendent

TRI Pointe Homes
10.2023 - 01.2026

Project Manager

KGPCo.
08.2022 - 10.2023

Construction Manager

Synergy
03.2021 - 04.2022

Construction Manager

Advanced Wireless And Logistics
01.2017 - 03.2021

Site Foreman

Advanced Wireless And Logistics
03.2016 - 04.2017

High School Diploma -

Woodcreek High School