Plant Superintendent
Managed the operation and plant equipment maintenance for the Gurnee activated sludge wastewater treatment facility (23.9 mgd design, 14 mgd average) capable of processing 47 mg of municipal/industrial wastewater per day. Responsible for budget control and annual expenditures of $5.2 million. Planned, scheduled and directed work activities including plant operation, laboratory testing, equipment corrective/preventive maintenance and grounds keeping. Monitored plant odor control equipment and responded to odor complaints, preparing and submitted odor complaint paperwork as required. Prepared, reviewed and submitted weekly operations report and annual staff performance appraisals.
Supervised Assistant Superintendent, three bargaining unit operators, two base shop mechanics, two plant mechanics, one preventive maintenance mechanic and three laborers. Coordinated maintenance schedules to keep plant running at optimal levels. Managed 2017-2018 facility upgrade for biological phosphorous removal reducing facility aeration requirements resulting in an average of 16.5% energy savings/year. Collaborated with vendors to keep adequate air scrubber chemicals and supplies for proper operations. Monitored plant equipment remotely 24/7 as needed to ensure proper operation.
- 2019 NACWA Peak Performance Gold Award.
- 2018 NACWA Peak Performance Silver Award.
- 2017 NACWA Peak Performance Gold Award.
- 2016 NACWA Peak Performance Gold Award.
- 2015 NACWA Peak Performance Gold Award.
- 2014 NACWA Peak Performance Silver Award.
- 2013 NACWA Peak Performance Platinum Award.
- 2012 NACWA Peak Performance Platinum Award.
- 2011 NACWA Peak Performance Gold Award.
- 2010 NACWA Peak Performance Gold Award.
- 2009 NACWA Peak Performance Gold Award.
- 2008 NACWA Peak Performance Gold Award.
- 2007 NACWA Peak Performance Silver Award.
- 2006 NACWA Peak Performance Gold Award.