Overview
Work History
Timeline
Generic

Tim Tree

Dennehotso,AZ

Overview

25
25
years of professional experience

Work History

Construction Worker & Cleaner

Labor Systems
Phoenix, AZ
10.2017 - Current
  • Cleaned job sites daily removing debris, dirt and hazardous materials safely.
  • Provided assistance to supervisors when needed completing additional duties as assigned.

Solar Panel Installer

DKD-Electric ; @ 505 881-6100
Albuquerque, NM
07.2013 - 12.2015
  • Laid out and installed mounting hardware, such as brackets, bolts, and screws.
  • Assembled solar modules, panels and support structures to maintain efficient installation, electrical configuration and system maintenance.

Ironworker

Klinger Constructors LLC @ 505-822-9990
Albuquerque, NM
06.2003 - 06.2013
  • Installed structural steel frames and columns for high-rise buildings.
  • Fabricated metal components with cutting torches, arc welders, and other tools.
  • Utilized cranes, rigging equipment, and hoists to move materials safely.
  • Welded components together using gas welding or arc welding processes.
  • Cut material with shears, hand torches, plasma cutters, or power saws.
  • Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.
  • Determined safety risks associated with projects and implemented precautions to address risks.
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Performed mod assembly, erected and connected structural steel and leveled and torqued connections after steel placement.

Ironworker

Allsteel INC. ; @ 505-283-0381
Albuquerque, NM
01.2003 - 04.2003
  • Installed structural steel frames and columns for high-rise buildings.
  • Welded components together using gas welding or arc welding processes.
  • Worked onsite outdoors in all weather conditions including extreme heat and cold.
  • Encouraged workers to take precautions to prevent mishaps and injuries on job sites.

Ironworker

Luther Construction Co.
Albuquerque, NM
08.2002 - 11.2002
  • Installed structural steel frames and columns for high-rise buildings.
  • Worked onsite outdoors in all weather conditions including extreme heat and cold.
  • Determined safety risks associated with projects and implemented precautions to address risks.
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Performed mod assembly, erected and connected structural steel and leveled and torqued connections after steel placement.

Ironworker

Bedouin Industries Inc.;@303-286-1900
Denver, CO
07.2001 - 08.2002
  • Installed structural steel frames and columns for high-rise buildings.
  • Worked onsite outdoors in all weather conditions including extreme heat and cold.
  • Ensured that all workers adhered to safety regulations while on the job site.
  • Performed mod assembly, erected and connected structural steel and leveled and torqued connections after steel placement.

Ironworker

CDK -Constructors Inc.
Farmington, NM
02.2001 - 06.2001
  • Installed structural steel frames and columns for high-rise buildings.
  • Utilized cranes, rigging equipment, and hoists to move materials safely.
  • Welded components together using gas welding or arc welding processes.
  • Worked onsite outdoors in all weather conditions including extreme heat and cold.

Ironworker

Flagstaff Design & Construction (retired)
Flagstaff, AZ
06.2000 - 02.2001
  • Installed structural steel frames and columns for high-rise buildings.
  • Worked onsite outdoors in all weather conditions including extreme heat and cold.
  • Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.

Ironworker

Top-Flite Construction
Phoenix, AZ
01.2000 - 04.2000
  • Installed structural steel frames and columns for high-rise buildings.
  • Worked onsite outdoors in all weather conditions including extreme heat and cold.
  • Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.
  • Encouraged workers to take precautions to prevent mishaps and injuries on job sites.

Ironworker

Flagstaff Design @Construction
Flagstaff, AZ
09.1999 - 01.2000
  • Installed structural steel frames and columns for high-rise buildings.
  • Utilized cranes, rigging equipment, and hoists to move materials safely.
  • Worked onsite outdoors in all weather conditions including extreme heat and cold.
  • Encouraged workers to take precautions to prevent mishaps and injuries on job sites.

Timeline

Construction Worker & Cleaner

Labor Systems
10.2017 - Current

Solar Panel Installer

DKD-Electric ; @ 505 881-6100
07.2013 - 12.2015

Ironworker

Klinger Constructors LLC @ 505-822-9990
06.2003 - 06.2013

Ironworker

Allsteel INC. ; @ 505-283-0381
01.2003 - 04.2003

Ironworker

Luther Construction Co.
08.2002 - 11.2002

Ironworker

Bedouin Industries Inc.;@303-286-1900
07.2001 - 08.2002

Ironworker

CDK -Constructors Inc.
02.2001 - 06.2001

Ironworker

Flagstaff Design & Construction (retired)
06.2000 - 02.2001

Ironworker

Top-Flite Construction
01.2000 - 04.2000

Ironworker

Flagstaff Design @Construction
09.1999 - 01.2000
Tim Tree