Timothy Friscia

Timothy Friscia

Corpus Christi,USA

Summary

Commissioning and Construction Professional with 30 years in heavy industrial projects, including LNG, Oil & Gas, and power generation. NCCER-certified welder and pipefitter by trade, skilled in construction, pre-commissioning, commissioning, system turnover, and start-up coordination. Proven leader in multi-discipline supervision, safety management, and delivering projects on schedule with safety and quality as top priorities.

Overview

1
1
Certification
20
20
years of professional experience

Work History

Operations Advisor

Brunel Energy | Golden Pass LNG
Sabine Pass, TX
01.2026 - Current
  • Executed Mechanical Completion Walks to confirm readiness for turnover and pre-startup safety walks.
  • Conducted thorough inspections during Ready for Turnover and PSSR Walks to confirm system readiness.
  • Assisted in generating and clearing punch lists to streamline final inspections.
  • Conducted Lock-out/Tagout Verification to guarantee safe startup and operation procedures.
  • Verified valve lineup and manipulated sequence in accordance with startup procedures.
  • Witnessed and signed off on system line blows and steam blows to validate operational integrity.
  • Conducted regular inspections in process areas to verify systems are operating properly.

Piping Superintendent

Colonial Staffing | Arnold Airforce Base (TOS) II
Tullahoma, Tennessee
11.2025 - 01.2026
  • Pipe Superintendent (Contract) on JV project between Astrion and Fluor for capital improvements and modernization of Arnold Engineering Development Complex
  • Managed all fabrication activities in fabrication shop.
  • Coordinated with engineering teams to ensure compliance with project specifications.
  • Managed daily workflow and resource allocation for piping projects.
  • Ensured that all welding operations were conducted according to industry standards and regulations.
  • Prepared weekly reports detailing progress on piping installation projects.
  • Monitored, evaluated and reported daily progress of piping activities to the Project Manager.
  • Reviewed shop drawings for accuracy prior to fabrication.
  • Created Pipe Spool Count Spreadsheet and updated daily as IFC drawing became available.
  • Analyzed material take-off data for accuracy before ordering supplies and equipment.
  • Implemented corrective action plans when nonconformities were discovered during inspection processes.
  • Monitored project progress to enforce adherence to deadlines and quality standards.

PC/CSU Supervisor

KRB, Inc | Venture Global Plaqumines LNG
Port Sulphur, Louisiana
09.2024 - 11.2025
  • Led pre-commissioning and commissioning activities for LNG liquefaction trains, including system checkout, equipment inspection, and verification of design compliance under temporary start-up conditions.
  • Conducted system blowdowns, tightness testing, nitrogen dry-out procedures, and ensured proper installation prior to energization.
  • Reviewed and signed B-ITR check sheets, submitted Notices of Energization (NOEs), and coordinated start-up operations with client personnel.
  • Managed isolation and LOTO procedures, red blind installation/removal, and boundary isolation verifications.
  • Planned and scheduled daily commissioning activities, prioritizing critical-path tasks to meet deadlines, while maintaining safety and quality standards.
  • Worked closely with operations to ensure a smooth handover.
  • Facilitated Plan of the Day meetings and provided proactive solutions to potential field issues.

Construction Project Superintendent

Fluor Federal Petroleum Operations (DOE)
Strategic Petroleum Reserve, (LE-2 Project), Plaqumine, Louisiana
02.2023 - 09.2024
  • Directed construction, pre-commissioning, commissioning, and start-up activities for assigned scopes, ensuring safe and compliant system turnovers.
  • Oversaw multi-discipline subcontractor teams, aligning work plans with engineering deliverables, material availability, construction and commissioning milestones.
  • Executed LOTO activities, prepared and implemented work permits/JSAs, and verified system readiness through pre-hydro walkdowns, hydrostatic testing, dewatering, flushing, and restoration.
  • Reviewed and signed off on A and B Check Sheets.
  • Represented company leadership onsite as senior authority for construction and commissioning scopes, ensuring safety, quality, and schedule adherence.
  • Championed project safety culture by integrating construction and commissioning risk controls into daily operations.

Piping General Foreman

Bilfinger Westcon | ND Paper Mill
Biron, Wisconsin
06.2022 - 02.2023
  • Managed the installation of process piping systems, pipe supports, and hangers.
  • Maintained comprehensive records of construction activities to support project tracking and compliance.
  • Directed pre-commissioning activities such as hydrostatic, pneumatic testing, flushing, and purging procedures to support system turnover.
  • Coordinated with other crafts to align mechanical completion with commissioning schedules.
  • Maintained 3-week lookaheads to ensure readiness for pre-commissioning activities.
  • Verified work against P&IDs, ISOs, PFD's and specifications to ensure commissioning compliance.

Piping Superintendent

Bay, LTD | Formosa Plastics
Point Comfort, Texas
03.2018 - 06.2022
  • Provided guidance on best practices regarding installation techniques for various types of pipes or components.
  • Performed regular inspections of completed work areas to verify quality control measures had been followed correctly.
  • Participated in job site safety meetings and ensured that crew members adhered to safety protocols at all times.
  • Identified potential problems or delays in the process of installing pipes or associated components prior to them occurring.
  • Monitored, evaluated and reported daily progress of piping activities to the Project Manager.
  • Implemented corrective action plans when nonconformities were discovered during inspection processes.
  • Created detailed work schedules for pipefitting crews based on project timelines and budget constraints.
  • Conducted subsystem walkdowns, developed punch lists, and oversaw closeout to commissioning standards.
  • Coordinated with QA/QC, NDE, and other disciplines to expedite system readiness.

Piping Lead General Foreman

McDermott | LACC Ethane Cracker Project
Westlake, LA
02.2018 - 11.2018
  • Monitored progress against established goals throughout the duration of the project ensuring timely completion.
  • Performed periodic tests on newly installed piping systems to verify their functionality.
  • Provided technical guidance to workers regarding assembly processes for various types of piping systems.
  • Developed strategies for efficient resource use during project execution.
  • Identified potential hazards associated with pipe installation activities and took necessary measures to eliminate them.
  • Oversaw process piping installation through to pre-commissioning readiness, including hydrostatic/pneumatic testing and nitrogen purging.
  • Conducted subsystem walkdowns, punch list creation and clearance, LOTO, and PSSR activities to ensure safe turnover.
  • Coordinated daily with other trades to align construction completion with commissioning plans.

Piping General Foreman

Bilfinger Westcon | Voestalpine (HBI Project)
Portland, Texas
06.2015 - 07.2016
  • Supervised pipe fitting and welding operations to ensure installation met weld quality applicable codes and standards.
  • Monitored progress against established goals throughout the duration of the project ensuring timely completion.
  • Kept detailed progress records to hit strict deadlines and adjust plans.
  • Prepared RFIs, verified installation per P&IDs/ISOs, and aligned work progress to commissioning schedules.

Piping Foreman

CCC Group
San Antonio, Texas
05.2006 - 03.2016
  • Instructed crew members in proper techniques for cutting, welding, threading, assembling, measuring, bending and joining pipes or tubes.
  • Ordered materials necessary for successful completion of work scopes using BOM and Specifications.
  • Created detailed reports regarding each project's progress and any associated problems or delays encountered along the way.
  • Inspected and tested pipes for leaks or other defects and made necessary repairs.
  • Conducted regular maintenance checks on tools and equipment used by crews to identify any potential issues before they arise.
  • Developed daily job plans for pipefitting crew members, including materials needed, labor hours required, safety precautions.

Education

Some College - Welding and Fabrication

Coastal Bend College
Beeville, TX

Some College - Computer Aided Drafting

Palo Alto College
San Antonio, TX

Skills

  • Pre-commissioning and commissioning procedures
  • Construction Supervision
  • Safety Leadership
  • Technical proficiency
  • Project Execution
  • Quality Assurance
  • ISO's
  • P&ID's
  • PFD's
  • Ortho's
  • Spec Sheets
  • Punch list clearance
  • Communication & Leadership
  • Conflict resolution
  • Problem solving
  • Team leadership
  • Scheduling activities
  • Project coordination
  • RFI submittal
  • A-ITR & B-ITR signoff
  • Word processing
  • E-mail
  • Spreadsheets
  • Electronic presentation programs
  • SAP
  • Coreworx
  • McPlus
  • Enablon
  • Lucy Co-Console
  • Bluebeam
  • Modeling programs such as Navisworks and SmartPlant

Certification

• NCCER Industrial Pipefitter, 6137649
• NCCER Abnormal Operating Conditions- Field (AOCFG), 6137649
• OSHA 10-Hour Construction Safety and Health
• OSHA 30-Hour Construction Safety and Health
• MARSEC General Safety

References

  • Clint Goodeaux, Senior Commissioning Manager- KBR, 337-302-3525
  • Akam Hassan, Operation Assurance Supervisor/CSU- Venture Global, 214-718-2868
  • Ronnie Young, Project Manager - Clayco, 501-388-2635
  • Doug Twedell, Quality Manager-Clayco, 417-209-5786

Timeline

Operations Advisor

Brunel Energy | Golden Pass LNG
01.2026 - Current

Piping Superintendent

Colonial Staffing | Arnold Airforce Base (TOS) II
11.2025 - 01.2026

PC/CSU Supervisor

KRB, Inc | Venture Global Plaqumines LNG
09.2024 - 11.2025

Construction Project Superintendent

Fluor Federal Petroleum Operations (DOE)
02.2023 - 09.2024

Piping General Foreman

Bilfinger Westcon | ND Paper Mill
06.2022 - 02.2023

Piping Superintendent

Bay, LTD | Formosa Plastics
03.2018 - 06.2022

Piping Lead General Foreman

McDermott | LACC Ethane Cracker Project
02.2018 - 11.2018

Piping General Foreman

Bilfinger Westcon | Voestalpine (HBI Project)
06.2015 - 07.2016

Piping Foreman

CCC Group
05.2006 - 03.2016

Some College - Welding and Fabrication

Coastal Bend College

Some College - Computer Aided Drafting

Palo Alto College
Timothy Friscia