Summary
Overview
Work History
Education
Skills
Affiliations
Timeline
Generic

Timothy Gutierrez, Jr.

Covina,CA

Summary

Charter Oak High School alumni class of 2009. Have always been around the construction industry since 2007. Spent 12th grade year working as an assistant custodian at the Tri Community Welding Center in Covina, Ca. Started the Steamfitter/Welder apprenticeship with Local 398 (Pomona, Ca) 2 years after completing High School.

Very well-rounded Pipefitter/Steamfitter. Very confident with installing any type of various mechanical piping systems. Very ambitious, self-discipline, and goal orientated. Considers myself a natural born leader.

Strategic Foreman with expertise prioritizing projects, planning workflow and managing employees to achieve operational goals. Resourceful individual with 13 years of active experience managing efforts within deadline-driven environments. Diplomatic individual with strong leadership and decision-making skills.

Overview

13
13
years of professional experience

Work History

Steamfitter Foreman

Kinetic Systems, Inc.
05.2023 - Current
  • Installed piping for various systems such as Chilled water supply/return, Heating hot water supply/return, Process Chilled water supply/return, Tempered process chilled water supply/return, Low pressure steam, Low pressure condensate, Pumped condensate return, Clean dry air, Nitrogen, and Plant air.
  • Collaborated with other skilled trades professionals, ensuring seamless integration of mechanical piping systems within building infrastructure.
  • Streamlined projects by efficiently organizing equipment, tools, and materials needed for each task at hand.
  • Expedited project timelines through meticulous coordination with other team members, working within tight deadlines to achieve goals.
  • Maintained clean work environment, minimizing disruptions while fostering safe atmosphere for colleagues and clients alike.
  • Minimized delays in project schedules by effectively communicating progress updates with clients, vendors, and team members.
  • Reduced risk of costly repairs or replacements through diligent attention to detail during all phases of mechanical piping system installations and maintenance work.
  • Prepared budgets and estimated costs for potential work on piping systems.
  • Conducted weekly meetings with colleagues to discuss safety issues, status and development.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Developed and maintained positive relationships with clients and other stakeholders.

Steamfitter Foreman

Desert Mechanical Inc. (Tutor Perini)
05.2022 - 05.2023
  • Review job specifications & submittals to verify that high pressure steam/pumped condensate return system was being installed in compliance with owner.
  • Install 2,000 feet of new (10") high pressure steam & (6") pumped condensate return piping system for the VA Hospital in West Los Angeles (Wilshire Blvd.) to re-route old steam system to make way for Metro Purple Line subway train station. This project includes (2) existing steam vaults, (2) new steam vaults, (4) new underground steam tunnels, (4) new steam traps and new underground steam/condensate piping for by-pass and expansion.
  • Made sure that qualifying pipe welders were able to pass 100 percent X-ray which was required in job specifications.
  • Coordinate with crane operator (Becho Inc.) to assure that everyone who was involved with crane picks were qualified, so that piping was installed in safe and productive manner.
  • Follow safe work practices, which included fall protection and personal protective equipment.
  • Perform tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Threaded pipes using piping machines.
  • Fabricate and install screw pipe, socket weld pipe and stainless-steel tubing.
  • Coordinate movement of materials and equipment to job sites.
  • Utilize welding equipment and fit-up tools to safely complete predetermined operations.
  • Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
  • Manage efficient teams of up to (9) steamfitters, varying from journeyman and apprentices, order material, coordinate job schedule with general contractor (GC)/facility maintenance, coordinate inspection with Inspector (IOR) to inspect quality of work and make sure piping system is up to code.
  • Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
  • Review and studied blueprints to double-check installation and implementation project requirements.
  • Assist in start up of high pressure steam/pumped condensate return piping system.

Steamfitter Foreman

Meadows Mechanical
05.2021 - 05.2022
  • Reviewed job specifications and submittals to verify that refrigeration piping system was being installed in compliance with owner.
  • Read and understood contract 'scope of work' to make sure that additional work was not being performed with out proper approval.
  • Installed (12) Daikin Condenser Units and (21) 1.5/2.0 wall mount Fan Coil Units in (6) story hospital building ( UCLA Olive View Medical Center).
  • Oversaw crew of pipefitters, ordered material, coordinated schedules with general contractor/facility maintenance, coordinated inspection with IOR(Inspector) to inspect quality of work and make sure piping system is up to code.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Supervised journeyman and apprentices in installation of refrigeration piping system.
  • Fabricated and installed refrigeration piping for Daikin VRV refrigeration systems at Olive View Medical Center (UCLA).
  • Coordinated movement of materials and equipment to job sites (vendors/fabrication shop).
  • Coordinated with general contractor/facility maintenance to assure that (12) Condenser units were set on various roof tops in safe and professional manner according to approved crane pick plan.
  • Assisted in process of start up with refrigeration piping system.
  • Evaluated final results to determine quality levels and isolate root causes of any identified faults.
  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
  • Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.

Journeyman Steamfitter/Welder

Xcel Mechanicals Systems
08.2019 - 04.2021
  • USC Los Angeles (2019) Medium pressure steam, steam condensate return, steam boiler re-pipe.
  • Lakewood High School (2019) Heating hot water system, chilled water system, chillers, boilers, AHU's, refrigeration system, condenser units.
  • Northrup Grumman Manhattan Beach (2019) Chilled water system, condenser water system, central plant re-pipe, cooling tower replacement.
  • Paramount Studios Hollywood (2020) Heating hot water system, chilled water system, chillers, boilers, central plant re-pipe, cooling tower replacement.
  • Anaheim Community Hospital (2020) Heating hot water system, chilled water system, chillers, boilers, AHU's, CAV's, refrigeration system, condenser units.
  • HRL Science Labs Malibu (2021) Heating hot water system, chilled water system, process cooling water system, liquid nitrogen, gaseous nitrogen, helium, AHU's.
  • UCI Medical Center Orange (2021) Steam condensate return, Low pressure steam, chilled water system, soft water system, natural gas system.

Journeyman Steamfitter/Welder

ACCO Engineered Systems
08.2017 - 08.2019
  • The Hoxton Hotel DTLA (2017) Heating Hot water system, chilled water system, condenser water system.
  • Cal Tech Student Living Dorms Pasadena (2018) Medium pressure steam supply, condensate steam return, chilled water system, heat exchangers.
  • Antelope Valley Hospital (2018) Low pressure steam return piping to steam humidifiers for surgical rooms.
  • Oprah Winfrey Studios West Hollywood (2018) Refrigeration System, VRF system, FCU's, Condenser Units.
  • Wilshire Grand 73 Story High Rise DTLA (2018) Heating hot water, chilled water, VAV's, FCU's, AHU's.
  • ACCO Fab Shop Commerce (2019) Steel fabrication for various projects.
  • 1133 S Hope Street 32 Story High Rise DTLA (2019) Diesel Fuel supply and return system, generator exhaust piping, condenser water system, cooling towers.
  • Bellflower Court House Bellflower (2019) condenser water supply and return Re-pipe, cooling tower replacement.
  • Alexandria Building Pasadena (2019) refrigeration system, VRF system, FCU's, Condenser Units.

Pipefitter Lead Man

ACCO Engineered Systems
03.2018 - 12.2018
  • Installed (2) chillers, (3) boilers, & (5) condenser units at San Antonio Hospital (Upland) for their new (2) story cancer research center(City of Hope).
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Supervised layout, assembly and installation of various sizes and types of mechanical piping systems.
  • Inspected work sites to determine presence of obstructions and determined where to cut pipes for structural integrity.
  • Reviewed and approved employee time reporting.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Inspected and tested pipe systems to verify safety and reliability.
  • Employed skills in soldering, brazing, & welding to finalize high-quality piping systems.
  • Drilled holed into parts of existing structures to complete piping meeting applicable to building codes.
  • Laid out full-scale drawings of pipe systems, supports and related equipment according to blueprints.
  • Secured rising mains and boiler/chiller piping to structural supports in new construction and remodeling projects.
  • Filled pipe systems with water and air to determine location of leaks.
  • Oversaw crew of pipefitters, ordered material, coordinated schedules with general contractor, coordinated inspection with Inspector(IOR) to inspect quality of work and make sure piping system is up to code.

Apprentice Steamfitter/Welder

ACCO Engineered Systems
09.2015 - 08.2017
  • Cal State Los Angeles (2015) Boiler change out and Re-pipe of heating hot water system.
  • Gilead Pharmaceutical Plant La Verne (2016) Heating hot water system, chilled water system, boilers, and chillers install (Central plant). Heating hot water system, chilled water system, AHU's, VAV's, FCU's (Building 10) Heating hot water system, chilled water system, AHU's, VAV's, FCU's, pump room (Building 30) Heating Hot water system, chilled water system, AHU's, VAV's, FCU's (Building 50).
  • Cal Poly Pomona (2016) 9 Air Handler Unit change outs and Re-pipe of heating hot water system, chilled water system.
  • The Waldorf Astoria Beverly Hills (2016) Heating hot water system, chilled water system, refrigeration system, condenser units, boilers, AHU's, VAV's, FCU's.
  • Pepperdine Library Malibu (2016) Heating hot water system, chilled water system, boilers, chillers, AHU's, VAV's, FCU's.
  • AVEN Luxury Apartments 38 Story High Rise DTLA (2017) Condenser Water system piping to heat pump units.
  • AMGEN Pharmaceutical Plants Thousand Oaks (2017) Glycol chilled water system, glycol chiller install for lab units.
  • Burbank Studios (2017) Heating hot water system, chilled water system, VAV's, CAV's, FCU's.
  • The Long Beach Arena Long Beach (2017) Heating hot water system, chilled water system, AHU's.
  • Beverly Hospital Montebello (2017) Heating hot water system, chilled water system, condenser water system, Central plant re- pipe.

Apprentice Steamfitter/Welder

Pro Mechanical Corporation
06.2011 - 08.2015
  • VA Hospital Wilshire Los Angeles (2011-2012) Heating hot water system, chilled water system, boilers, chillers, VAV's, FCU's.
  • East Los Angeles College Monterey Park (2013) Heating hot water system, chilled water system, mechanical pump room, AHU's, VAV's, Chilled Beams.
  • General Hospital County USC Los Angeles (2014) Medium pressure steam, Steam condensate return.
  • Paseo Drive Pasadena (2015) Chilled water system re-pipe
  • Fremont High School Renovation Los Angeles (2015) Heating hot water system, chilled water system, chillers, boilers, AHU's. This was my first actual project that I started welding on pipe in the field.

Education

High School Diploma -

United Association (P.I.P.E.)
Gardena, CA
05.2017

High School Diploma -

Tri Community Welding School
Covina, CA
07.2009

High School Diploma -

Charter Oak High School
Covina, CA
06.2009

Skills

Certified Pipe Welder

  • UA21 (Uphill process)
  • UA1 (Downhill process)
  • UA18 (Orbital process)

Certified Structural Welder

  • Los Angeles City Manuel
  • Los Angeles City Semi- Automatic
  • OSHA 30

Building Trade Journeyman Steamfitter (cardholder)

  • Experience with understanding job specifications and what materials have been submitted for and approved for use on jobsite
  • Experience with creating material request(MR)
  • Experience with requesting Purchase Order # from accounting department, to have material delivered to jobsite
  • Experience with documenting and recording daily logs
  • Experience with job coordination(Foreman meetings)
  • Experience with PROCORE
  • Experience with Bluebeam
  • Experience with coordinating inspections(OSHPD)
  • Experience with Time & Material
  • Experience with creating work plans
  • Experience with understanding job cost
  • Experience with Time Entry for piping crew
  • Experience with RFI's
  • Experience with performing job hazard analysis
  • Experience with understanding contract scope of work
  • Experience with verifying before work is put into place
  • Experience with understanding how many hours are allotted for a task, and how many hours have been spent
  • Experience with managing rental equipment and time on-site
  • Experience with verifying deliveries upon arrival and check for correctness or order
  • Experience making on-time deliveries in designated locations
  • Experience with reading contract/shop drawings for proper routing and installation
  • Experience with pre planning and managing manpower
  • Tube Bending Experience
  • Pipe Grooving Experience
  • Soldering Experience
  • Brazing Experience
  • Welding Experience
  • Interpreting Blue Prints Experience
  • Pipe Fitting/ Steel Fabrication Experience
  • Field Detailing Experience

Affiliations

  • Local 398 United Association of Steamfitters & Welders

Timeline

Steamfitter Foreman

Kinetic Systems, Inc.
05.2023 - Current

Steamfitter Foreman

Desert Mechanical Inc. (Tutor Perini)
05.2022 - 05.2023

Steamfitter Foreman

Meadows Mechanical
05.2021 - 05.2022

Journeyman Steamfitter/Welder

Xcel Mechanicals Systems
08.2019 - 04.2021

Pipefitter Lead Man

ACCO Engineered Systems
03.2018 - 12.2018

Journeyman Steamfitter/Welder

ACCO Engineered Systems
08.2017 - 08.2019

Apprentice Steamfitter/Welder

ACCO Engineered Systems
09.2015 - 08.2017

Apprentice Steamfitter/Welder

Pro Mechanical Corporation
06.2011 - 08.2015

High School Diploma -

United Association (P.I.P.E.)

High School Diploma -

Tri Community Welding School

High School Diploma -

Charter Oak High School