Summary
Overview
Work History
Skills
Certification
Timeline
Generic

Timothy Wallace

Waynesville,MO

Summary

Results-driven construction professional with 9 years of experience in electrical work, carpentry, and construction management. Skilled in construction estimating, blueprint reading, and OSHA 10 certification. Possesses a strong foundation in construction, with a focus on electrical experience and a current apprenticeship license.

Overview

7
7
years of professional experience
1
1
Certificate

Work History

Low Voltage Installation Tech

Howell Commercial Refrigeration
01.2025 - 03.2025
  • Actively participated in team meetings, contributing valuable input toward process improvements and increased productivity.
  • Used hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Diagnosed and troubleshot system faults, identifying equipment issues and resolutions.
  • Maintained high level of safety when using hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.

Low Voltage Technician

DWS ENERGY
08.2023 - 06.2024
  • Assembled and wired electrical control panels according to engineering drawings and specifications
  • Installed various components such as circuit breakers, relays, switches, and terminal blocks in control panels
  • Performed quality checks on finished control panels to ensure compliance with industry standards and customer requirements
  • Adhered to safety protocols while working with live circuits and high voltage equipment during panel assembly
  • Assisted in the development of standard operating procedures (SOPs) for panel assembly processes
  • Trained new team members on proper techniques for panel building, including wiring practices and component installation
  • Managed multiple projects simultaneously, prioritizing tasks to meet deadlines without compromising quality standards
  • Conducted regular maintenance on tools and equipment used in panel assembly to ensure optimal performance and longevity
  • Ensured compliance with relevant codes, regulations, and safety guidelines throughout the entire panel building process
  • Ensured compliance with company policies and procedures related to quality control and safety standards
  • Performed regular inspections of finished control panels to verify proper installation of components

Facilities Mechanic

Dallas Area Rapid Transit
03.2022 - 06.2023
  • Conducted comprehensive building inspections periodically to ensure adherence to codes and regulations.
  • Maintained electrical systems for increased reliability, conducting necessary installations and upgrades as needed.
  • Trained junior mechanics on company procedures and best practices, enhancing team cohesion and expertise levels.
  • Performed installation tasks such as lighting fixtures or shelving units to optimize workspace functionality.
  • Provided prompt response to emergency situations, minimizing damage to facilities and ensuring the safety of occupants.
  • Managed inventory of tools, parts, and supplies to maintain adequate stock levels for efficient maintenance operations.
  • Collaborated with other departments for effective space planning, resulting in improved facility usage.
  • Enhanced workplace safety through thorough identification and mitigation of potential hazards.
  • Maintained accurate records of all performed tasks, providing crucial data for future improvements and budgeting decisions.
  • Reduced equipment downtime by performing timely repairs and regular inspections.
  • Ensured optimal performance of HVAC systems with regular maintenance, troubleshooting, and repair tasks.
  • Completed painting projects according to specifications while adhering to strict deadlines.
  • Adhered to OSHA policies and procedures to minimize hazards and promote safe work environment.
  • Utilized power and hand tools to repair or replace defective parts and equipment to facilitate improved reliability.
  • Followed instructions from supervisor regarding daily job tasks and duties.
  • Proposed issues to property manager so effective resolutions could be put into place.
  • Utilized variety of tools and test equipment to troubleshoot and diagnose equipment malfunctions.
  • Conducted regular inspections of equipment to promptly identify issues that could cause machinery malfunctions.
  • Diagnosed and repaired complex mechanical and electrical systems.
  • Continuously adhered to strict regulations as well as detailed instructions, guidelines and specifications.

Low Voltage Technician/ Foreman

CoolSys
02.2020 - 02.2022
  • Reviewed blueprints and project specifications ahead of time to fully understand all key details of job.
  • Mounted panels for motion detectors, keypads and controls.
  • Identified problematic components and wiring issues and applied troubleshooting techniques.
  • Successfully managed multiple projects and several work teams on consistent basis.
  • Completed and submitted job tracking to supervisors to cover expenses and labour hours.
  • Used information in technical diagrams, schematics, and manuals to understand operations and make successful repairs.
  • Updated hardware and software platforms by implementing automation and efficiency improvements.
  • Estimated numerical length of runs during new service installations.
  • Reduced downtime, diagnosing and repairing malfunctions in low voltage systems promptly.
  • Demonstrated system use, maintenance and care to customers.
  • Enhanced safety by troubleshooting electrical issues, identifying hazards, and implementing corrective measures.
  • Demonstrated reliability as a team member by consistently meeting deadlines without compromising quality standards.
  • Increased customer satisfaction with professional communication skills when explaining technical information clearly.
  • Collaborated closely with project managers to ensure timely completion of installations and repairs.
  • Supported team members in completing projects successfully through effective collaboration and knowledge sharing.
  • Minimized disruptions to client schedules by coordinating work activities efficiently onsite.
  • Reduced error rates by meticulously following schematics during installations.
  • Facilitated seamless technology integrations, connecting low voltage systems with existing infrastructure.
  • Maintained detailed records of installations and repairs to streamline future maintenance.
  • Interpreted scale drawings of new commissions to determine layout of materials and equipment.
  • Modified, maintained, or repaired electronics equipment or systems to achieve proper functioning

Medical Gas Technician/HVAC Low Voltage Controls

QUINTECH
01.2018 - 03.2020
  • Reviewed blueprints and project specifications ahead of time to fully understand all key details of job.
  • Mounted panels for motion detectors, keypads and controls.
  • Identified problematic components and wiring issues and applied troubleshooting techniques.
  • Successfully managed multiple projects and several work teams on consistent basis.
  • Completed and submitted job tracking to supervisors to cover expenses and labor hours.
  • Used information in technical diagrams, schematics, and manuals to understand operations and make successful repairs.
  • Updated hardware and software platforms by implementing automation and efficiency improvements.
  • Estimated numerical length of runs during new service installations.
  • Reduced downtime, diagnosing and repairing malfunctions in low voltage systems promptly.
  • Demonstrated system use, maintenance and care to customers.
  • Enhanced safety by troubleshooting electrical issues, identifying hazards, and implementing corrective measures.
  • Demonstrated reliability as a team member by consistently meeting deadlines without compromising quality standards.
  • Increased customer satisfaction with professional communication skills when explaining technical information clearly.
  • Collaborated closely with project managers to ensure timely completion of installations and repairs.
  • Supported team members in completing projects successfully through effective collaboration and knowledge sharing.
  • Minimized disruptions to client schedules by coordinating work activities efficiently onsite.
  • Reduced error rates by meticulously following schematics during installations.
  • Facilitated seamless technology integrations, connecting low voltage systems with existing infrastructure.
  • Maintained detailed records of installations and repairs to streamline future maintenance.
  • Interpreted scale drawings of new commissions to determine layout of materials and equipment.
  • Modified, maintained, or repaired electronics equipment or systems to achieve proper functioning

Skills

  • Construction Management
  • Construction Estimating
  • Construction
  • Drywall
  • Electrical Experience
  • Remodeling
  • Handyman
  • Carpentry
  • Blueprint Reading
  • Low Voltage
  • Schematics

Certification

  • OSHA 10 Present
  • TDLR November 2023 to November 2024
  • I have had my Apprenticeship license with the state of Texas since 2018
  • Driver's License

Timeline

Low Voltage Installation Tech

Howell Commercial Refrigeration
01.2025 - 03.2025

Low Voltage Technician

DWS ENERGY
08.2023 - 06.2024

Facilities Mechanic

Dallas Area Rapid Transit
03.2022 - 06.2023

Low Voltage Technician/ Foreman

CoolSys
02.2020 - 02.2022

Medical Gas Technician/HVAC Low Voltage Controls

QUINTECH
01.2018 - 03.2020
Timothy Wallace