Highly accomplished Architectural Professional with over 30years of experience delivering hundreds of private and public sector projects, valued up to $650 million. His extensive Design/Build background, combining expertise as both a Designer and Master Builder, forms the foundation of his ability to achieve outstanding design and construction outcomes.
· Review and interpret plans and specifications, ensuring precise execution while maintaining a strong understanding of building codes and safety regulations.
· Effectively manage and collaborate with consultants, stakeholders, contractors, and vendors to drive project success.
· Lead regular site meetings to track progress and address issues promptly.
· Coordinate closely with project managers, architects, contractors, and stakeholders to align project goals and expectations.
· Partner with the design team using Revit, providing expertise in construction management, quality assurance, scheduling, risk management, and claims avoidance on major construction projects.
· Supervise all on-site construction activities, ensuring projects are delivered on time, within budget, and to the highest standards of quality.
Provided leadership in selecting A/E firms for the owner, led design efforts along with construction management of projects, valued $85M.
• Led efforts in developing RFP for A/E selection
• Conduct constructability reviews and provide recommendations for resolution
· Build rapport and coordinate issues with designers and stakeholders
· Reviewed issues and provided recommendations for cost
· General oversight of Designers and General Contractor Construction management
Bel-Air/Pacific Palisades residential homes:
Redesign and construction management of (2) residential homes, construction value totaling $37M.
· Led redesign efforts of existing documents
· Procured unique finish material suppliers
· Provided general construction management services
Implemented high detail levels of QC for finishes
Both, visualization and construction documents, I did on REVIT.
1. LAWA
Terminals #2 & #3 at LAX- $40MIL Design guideway alignment for Baggage Handling System (BHS)
· Implemented REVIT system to aid design.
· Coordinated with special design consultants for code issues.
· Coordinated meetings with Delta, Contractors, and Vendors.
2. The world-famous singer John Legend
Silicon South, an IT high-tech learning facility- $5OMIL
· Coordinated constructability issues with design disciplines.
· Reviewed design for code compliance.
· Presented multiple design models for client selection.
· Incorporate design changes by owner.
· Provided general construction management services
· Maximum efficient coordination between all involved in the project to make it run smoothly and efficiently
· Very strict code issues, which we checked by top institutions, made me aware of any move I was making
· Being on the site almost every day and monitoring for any deficiencies during the process of construction process
St Finbar Catholic School-Archdiocese, Burbank
Design and renovation of a school, construction value $25m.
· Led design efforts on multiple projects.
· Develop a timeline for construction schedules
· Oversight of designers
· Provide recommendations to resolve design conflicts.
· Propose finish options for the owner’s selection
Provide general construction management services
Esteban Torres High School #2, $145MIL, LAUSD
Responsibilities included producing the entire design of the Master Plan and each individual building of the campus, which amounted to the largest school building project in Los Angeles; providing leadership to Clark Construction during construction; and leading the effort in whole project coordination among all consultants: architectural, structural, HVAC, MEP, landscape, food service, civil, educational consultant. I was also responsible for scrutinizing, studying, and implementing all building codes and regulations. Major campus constructions:
-Five different Learning Academies, 3 floors each with Classrooms and Labs, connected to the Elevated Walk - Way
-Administration, Library, Data Center, and Police on the first floor, a 3-floor high building, connected to the Elevated walkway as well
-4 levels free-standing Elevated Walk Way, connecting the 5 Academies, the Administration Building, and the Library. The last level is a Catwalk serving the HVAC on the roof of the building.
-Multipurpose center - 2 Story Theater and Sound Stage with an adjacent kitchen, serving the entire campus
Ground-level open Food Court to the main plaza
-Gymnasium- with 2 Gyms, main and practice, Fitness Weight RM, Aerobics, Boys & Girls Lockers. The main gym has stackable bleachers for people to watch the competitions.
-Amphitheater with rows of seats for outdoor performance located on N Eastern Ave next to Cesar Chavez Ave
-Two-level Parking Structure with 500 parking stalls
-Central Plant, along with major infrastructure improvements
-Two Entries with a bus loading area and 4-lane Roadways
-Outdoor Sports Facility with Football and Baseball field, 12 Tennis Courts, and Track & Field