Summary

Highly accomplished Architectural Professional with over 30years of experience delivering hundreds of private and public sector projects, valued up to $650 million. His extensive Design/Build background, combining expertise as both a Designer and Master Builder, forms the foundation of his ability to achieve outstanding design and construction outcomes.

· Review and interpret plans and specifications, ensuring precise execution while maintaining a strong understanding of building codes and safety regulations.

· Effectively manage and collaborate with consultants, stakeholders, contractors, and vendors to drive project success.

· Lead regular site meetings to track progress and address issues promptly.

· Coordinate closely with project managers, architects, contractors, and stakeholders to align project goals and expectations.

· Partner with the design team using Revit, providing expertise in construction management, quality assurance, scheduling, risk management, and claims avoidance on major construction projects.

· Supervise all on-site construction activities, ensuring projects are delivered on time, within budget, and to the highest standards of quality.

Overview

23
23
years of professional experience
1
1
Certification

Work History

Project Manager/Measure LA Liaison-West LA College

BuildLACCD, Los Angeles Community College District
Culver City, CA
06.2024 - Current
  • Refurbish Aviation Technology Buildings (3)- Developing the Scope of Work (SOW), Rough Order of Magnitude (ROM), Project Estimate Worksheets (PEWs’), preparing the documents leading to the White Paper before the review at DSA, working closely with the scheduler to establish the time being for the completion of the project, the same with the office estimator, numerous meetings at the site and in the office with the AOR and EOR to define the deficiencies and re-scope the work. Working closely with the leadership of the campus facilities and the district. The project is designed to be executed as design-bid-build, with taxpayers’ money of $11.2M.
  • De-carbonization of the College Campus- Studying and evaluating the GLUMAC’s, Engineers for a Sustainable Future, report how to change gas appliances and equipment with electrical, for the entire campus, and make the proposal efficient. There is total seven (7) buildings to be de-carbonized whose equipment uses gas. The SOW is developed as one for all of them and is combined with the Central Plant’s SOW. The PEWs’ are done for each individual building on the bases of the budget’s estimate from PMO (Program Management Office). It goes to DSA for approval to be able to do the procurement for the architect and the contractor. All the buildings included are going to be design-build with total budget $9.5MIL
  • Central Plant Cooling Tower with Thirty (30) Ice Tanks- There are two (2) existing and one (1) new cooling towers- they supply the entire campus with hot and cold water. The two (2) existing ones are going to be replaced with only one (1) with the same characteristics as the existing new tower. The structure of the new tower is going to be the same as the one left. The problem is with the water pressure to be equalized for both. The structure for the new one has to be rebuilt to be at the same level as the existing one. There will be thirty (30) now ice tanks which are going to be built across the street and connected with the existing seventy (70) ice tanks. A SOW, ROM, and PEW were developed, and they are bundled with the Central plant together to create one White Paper for all to go to PMO for approval. The project is going to be design-build with total budget for the Central Plant and the de-carbonization of the campus $20.2MIL.
  • Baseball Athletics Field- the TLC building stays in the direction where the batter hits the ball. The building is painted very bright and the batter does not see the ball to hit it. A previous decision was made to rotate the direction of the field 10 degrees. This did not work and we made a decision to screen the TLC building. I was coordinating the project between the PMO and us to get the project as soon as possible to come to our office and do the construction. The project is design-build with budget $3.6MIL.

PM- Structural Engineer/Architectural Project Manager

US Department of Veterans Affairs
Long Beach, California
06.2022 - 05.2024

Provided leadership in selecting A/E firms for the owner, led design efforts along with construction management of projects, valued $85M.

• Led efforts in developing RFP for A/E selection

• Conduct constructability reviews and provide recommendations for resolution

· Build rapport and coordinate issues with designers and stakeholders

· Reviewed issues and provided recommendations for cost

· General oversight of Designers and General Contractor Construction management

  • · How to question the qualities of the AOR to be able to choose the right one for the project to fit the already established architectural vocabulary at the campus
  • · According to the acquisition of materials, where to look and find the one that fits the purpose and the requirements of the doctors
  • · With quality control to navigate through the blueprints and question the work of the superintendent on the site, with the execution of the project

Project Architect/Senior Designer

ARYA Group (designed/built)
Los Angeles, California
02.2019 - 06.2022

Bel-Air/Pacific Palisades residential homes:

Redesign and construction management of (2) residential homes, construction value totaling $37M.

· Led redesign efforts of existing documents

· Procured unique finish material suppliers

· Provided general construction management services

Implemented high detail levels of QC for finishes
Both, visualization and construction documents, I did on REVIT.

  • These are different types of clients with distinct requirements. They have lots of money, and they love spending it on unusual visual effects and out-of-the-box shape grammar decisions. Just listen and follow them.
  • Sometimes these types of clients are asking for things that blow your mind. You have to be open to the world market and find the vendor who is capable of executing the client’s wishes. The client will pay wherever in the world the vendor is and bring him to Los Angeles to execute his ideas.
  • The quality control is in a very high level, and I had to check every detail if it is precisely executed on the site because the client will.

Project Architect/Senior Designer

Jenkins/Gales & Martinez Inc.
City of Los Angeles, California
04.2013 - 01.2019

1. LAWA

Terminals #2 & #3 at LAX- $40MIL Design guideway alignment for Baggage Handling System (BHS)

· Implemented REVIT system to aid design.

· Coordinated with special design consultants for code issues.

· Coordinated meetings with Delta, Contractors, and Vendors.

2. The world-famous singer John Legend

Silicon South, an IT high-tech learning facility- $5OMIL

· Coordinated constructability issues with design disciplines.

· Reviewed design for code compliance.

· Presented multiple design models for client selection.

· Incorporate design changes by owner.

· Provided general construction management services

· Maximum efficient coordination between all involved in the project to make it run smoothly and efficiently

· Very strict code issues, which we checked by top institutions, made me aware of any move I was making

· Being on the site almost every day and monitoring for any deficiencies during the process of construction process

Director of Design/Senior Project Architect

Kluger Architects
Signal Hill, California
10.2007 - 12.2012

St Finbar Catholic School-Archdiocese, Burbank

Design and renovation of a school, construction value $25m.

· Led design efforts on multiple projects.

· Develop a timeline for construction schedules

· Oversight of designers

· Provide recommendations to resolve design conflicts.

· Propose finish options for the owner’s selection

Provide general construction management services

  • My position was to lead the execution of multiple projects from concept through completion via design leadership, strong communication, and active independent and collaborative engagement with experience from Concept through Construction Administration. The position expected me to have the ability to establish critical path milestones and deliverable schedules. Develop, modify, and/or review drawings for the design, according to established standards and technical expertise. I had to develop solutions to technical problems, from the master planning and concept design phases through to construction document production. Present design material to clients and consultants- prepare material for and participate in project interviews and design presentations. Competitions- preparing large-scale boards in a presentable format and explaining the whole idea to the client in a critical manner. Frequent visits to the building site and monitoring the execution of the project- talking with the contractor and looking to support his work with all RFIs’, if any, he needs- coordinate the activities of architects, engineers, tenants, and construction contractors on projects.

Senior Associate, Project Designer, Planner

Langdon Wilson Architects
Los Angeles, CA
05.2004 - 10.2007

Esteban Torres High School #2, $145MIL, LAUSD

Responsibilities included producing the entire design of the Master Plan and each individual building of the campus, which amounted to the largest school building project in Los Angeles; providing leadership to Clark Construction during construction; and leading the effort in whole project coordination among all consultants: architectural, structural, HVAC, MEP, landscape, food service, civil, educational consultant. I was also responsible for scrutinizing, studying, and implementing all building codes and regulations. Major campus constructions:

-Five different Learning Academies, 3 floors each with Classrooms and Labs, connected to the Elevated Walk - Way

-Administration, Library, Data Center, and Police on the first floor, a 3-floor high building, connected to the Elevated walkway as well

-4 levels free-standing Elevated Walk Way, connecting the 5 Academies, the Administration Building, and the Library. The last level is a Catwalk serving the HVAC on the roof of the building.

-Multipurpose center - 2 Story Theater and Sound Stage with an adjacent kitchen, serving the entire campus

Ground-level open Food Court to the main plaza

-Gymnasium- with 2 Gyms, main and practice, Fitness Weight RM, Aerobics, Boys & Girls Lockers. The main gym has stackable bleachers for people to watch the competitions.

-Amphitheater with rows of seats for outdoor performance located on N Eastern Ave next to Cesar Chavez Ave

-Two-level Parking Structure with 500 parking stalls

-Central Plant, along with major infrastructure improvements

-Two Entries with a bus loading area and 4-lane Roadways

-Outdoor Sports Facility with Football and Baseball field, 12 Tennis Courts, and Track & Field

Associate, Senior Project Designer

JY-Design
Shanghai, China
02.2002 - 05.2004
  • The position required a great designer, and being highly motivated, well organized, thoughtful, and having experience working as part of a design team on large projects. I was required to have good communication skills, enjoyed working collaboratively with others, and was reliable, trustworthy, and detail-oriented. In office 65, I had my design studio of 6 people who were executing my architectural ideas and preparing PowerPoint presentations for my meetings with different clients. I was flying every week to different cities in China to meet the client and present the project in front of 40-50-60 people and address their questions at the end. After the presentation, Mr. Hu would meet the accountant of the client to wire the money to the office. When we were back, the money was in the office’s account..

Education

Master of Arts - Architecture + Urban Design

University of California, Los Angeles
Los Angeles, CA
06-1997

Master of Arts - Architecture

Clemson University
Clemson, SC
02-1995

Bachelor of Arts - Architecture

University of Architecture, Civil Engineering & Ge
Sofia, Bulgaria
09-1990

Master of Science - Structural Engineering

University of Architecture, Civil Engineering & Ge
Sofia, Bulgaria
07-1986

Skills

  • Construction management
  • Design-build procurement
  • Cost estimation
  • Scope development
  • Stakeholder coordination
  • Project management
  • Scope of work development
  • Quality control
  • Constructability reviews
  • Risk assessment
  • Effective communication
  • Problem solving
  • Leadership skills
  • Time management
  • Detail orientation
  • Team collaboration

Certification

  • LEED AP

Timeline

Project Manager/Measure LA Liaison-West LA College

BuildLACCD, Los Angeles Community College District
06.2024 - Current

PM- Structural Engineer/Architectural Project Manager

US Department of Veterans Affairs
06.2022 - 05.2024

Project Architect/Senior Designer

ARYA Group (designed/built)
02.2019 - 06.2022

Project Architect/Senior Designer

Jenkins/Gales & Martinez Inc.
04.2013 - 01.2019

Director of Design/Senior Project Architect

Kluger Architects
10.2007 - 12.2012

Senior Associate, Project Designer, Planner

Langdon Wilson Architects
05.2004 - 10.2007

Associate, Senior Project Designer

JY-Design
02.2002 - 05.2004

Master of Arts - Architecture + Urban Design

University of California, Los Angeles

Master of Arts - Architecture

Clemson University

Bachelor of Arts - Architecture

University of Architecture, Civil Engineering & Ge

Master of Science - Structural Engineering

University of Architecture, Civil Engineering & Ge