Summary
Overview
Work History
Education
Skills
Timeline
Generic

Toby Tompkins

Independence,MO

Summary

Developed wide range of practical skills with hand and power tools, construction-based environment, focusing on precision and quality. Seeking to transition into new field by leveraging expertise in problem-solving and project management. Aiming to contribute to dynamic team with strong work ethic and adaptable skill set.

Overview

14
14
years of professional experience

Work History

Carpenter/Handyman

KM Construction
06.2021 - 11.2024
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
  • Specialized in specific carpentry tasks such as framing, finish work, or restoration projects to provide clients with tailored services and high-quality results.
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Read and interpreted blueprints to follow specifications of projects.
  • Optimized workspace organization by maintaining a clean, safe, and efficient work environment throughout each project''s duration.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Contributed to successful completion of residential projects by skillfully installing cabinetry, doors, windows, and flooring materials.
  • Contributed to successful completion of residential and commercial projects by skillfully installing cabinetry, doors, windows, and flooring materials.
  • Repaired existing structures such as staircases, decks, or door frames with precision to extend their lifespan without compromising structural integrity or aesthetics.
  • Measured materials to determine sizes and quantity required for construction project.
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Measured, drilled and sawed materials to perform successful home improvements.
  • Assisted in site preparation and cleanup activities to ensure efficient project workflow and minimize disruptions for clients or other construction teams.
  • Strengthened team collaboration through effective communication and problem-solving skills during complex carpentry projects.
  • Discarded debris and disposed waste to maintain cleanliness and quality standards.
  • Streamlined project timelines by quickly adapting to changing client needs or design specifications while maintaining quality standards.
  • Enhanced structural integrity of buildings by installing frameworks, including joists and studs.
  • Achieved high level of client satisfaction by providing customized solutions for unique carpentry challenges.
  • Strengthened client relationships, provided insightful recommendations on materials and design based on their specific needs.
  • Increased workplace safety, conducted regular tool and equipment maintenance checks to prevent accidents.
  • Improved efficiency on construction sites by maintaining and organizing tools and materials, ensuring projects were completed ahead of schedule.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Repaired damaged doors, windows and other structures.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Measured, cut and installed drywall, paneling and other materials.
  • Installed insulation, trim and other finishing touches.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Built and hung custom doors and frames.
  • Assembled and installed furniture and cabinetry.
  • Managed inventory of tools, supplies and equipment.
  • Removed and repaired carpet and wood flooring.
  • Built and repaired decks, fences and sheds to improve overall appearance of homes.
  • Demonstrated versatility by successfully tackling a wide range of tasks, from plumbing and electrical work to carpentry and general home repairs, showcasing adaptability and expertise within the field.
  • Assisted homeowners in maintaining their properties by performing routine maintenance tasks such as painting, plumbing, and electrical work.
  • Installed lighting fixtures to improve lighting and increase energy efficiency.
  • Implemented creative problem-solving strategies when faced with unique repair challenges that resulted in effective solutions tailored to specific situations.
  • Completed repair jobs to restore functionality to electric and plumbing systems.
  • Meticulously maintained tools and equipment, ensuring optimal performance during each task undertaken.
  • Kept up-to-date with industry trends and advancements in technology to ensure the use of cutting-edge techniques when executing handyman projects.
  • Troubleshot and diagnosed problems with mechanical and electrical systems and equipment.
  • Positively engaged with customers and maintained professional appearance as company representative.
  • Rewired and replaced faulty electrical components in equipment.
  • Installed and maintained plumbing and HVAC systems.
  • Repaired and replaced pumps, valves and motors.

Lead Powder Coater/Industrial Painter

A-1 Paint, Powder & Sandblast
01.2013 - 06.2021
  • Maintained detailed records of process parameters, ensuring accurate documentation for future reference.
  • Increased customer satisfaction by consistently meeting or exceeding expectations for product appearance and durability.
  • Actively participated in team meetings to discuss challenges, share best practices, and set goals for continuous improvement.
  • Streamlined workflow by effectively organizing workstations and maintaining clean environments.
  • Supported efforts to stay current with industry trends by attending trade shows, conferences, and training seminars as needed.
  • Reduced waste and material costs by implementing proper powder application techniques.
  • Monitored supply inventory levels regularly; ensured appropriate levels were maintained to minimize downtime due to stockouts.
  • Contributed to cost reduction initiatives by identifying areas for improvement in material usage and process efficiency.
  • Ensured consistent product quality by conducting regular inspections and adjusting processes accordingly.
  • Utilized various tools such as spray guns, ovens, booths effectively; ensured proper usage, cleaning and maintenance for optimal performance.
  • Maximized equipment performance by performing routine maintenance tasks and addressing issues promptly.
  • Trained new team members on powder coating procedures, contributing to a skilled workforce.
  • Conducted thorough pre-treatment processes for optimal adhesion and corrosion resistance in coated products.
  • Continuously improved safety standards by identifying potential hazards and implementing corrective actions.
  • Collaborated with other departments to ensure smooth project transitions and timely delivery of finished products.
  • Adhered to strict quality control guidelines, guaranteeing the highest level of product consistency across all projects.
  • Consistently met production deadlines through effective planning, task prioritization, and diligent work ethic.
  • Enhanced production efficiency by optimizing powder coating processes and equipment settings.
  • Established effective communication channels within the team, fostering a productive working environment.
  • Prepared parts for coating and followed all procedures regarding powder coating application.
  • Checked parts to verify attachment of correct identification.
  • Identified issues with paint viscosity and flow before projects were negatively affected.
  • Verified production workflow, quality parts and delivery met required timeframes.
  • Observed safety protocols set by company to avoid hazardous conditions.
  • Inspected completed work for adherence to very strict guidelines and highest quality standards.
  • Removed surface imperfections, applied special undercoats, and sealed seams to ready surfaces for paint application.
  • Provided supervisor with daily status report on all job tasks and workers' duties.
  • Held or positioned spray guns to direct spray onto articles.
  • Met exacting tolerances when sanding and sealing final finishes.
  • Determined paint flow, viscosity and coating quality using visual inspections and viscometers.
  • Custom mixed colors to match customers' desired color.
  • Filled hoppers, reservoirs and pans with material used to coat, paint or spray using conveyors or pails.
  • Prepared and applied stencils, computer-generated decals or other decorative items to finished products.
  • Turned dials, valves or switches to regulate conveyor speeds, machine temperature, air pressure and circulation.
  • Assisted in the training of new team members, sharing knowledge about best practices for industrial painting applications.
  • Prepared surfaces for painting by cleaning, sanding, and masking to achieve optimal results.
  • Demonstrated attention to detail in every aspect of the painting process, resulting in consistent high-quality workmanship.
  • Painted surfaces using brushes, spray guns, and paint rollers.
  • Selected appropriate coatings based on specific job requirements, maximizing performance and durability while minimizing environmental impact.
  • Worked holidays and weekends depending on shifting needs of project.
  • Maintained painting equipment in excellent condition, ensuring optimal performance and minimal downtime.
  • Operated power sprayers and hand tools to prepare and paint large areas.
  • Ensured a safe working environment through proper use of protective equipment and adherence to safety protocols.
  • Conducted thorough assessments of project specifications before beginning work to ensure all requirements were understood and achievable within given timelines.
  • Performed regular inspections of completed work to ensure quality standards were met or exceeded consistently throughout the project duration.
  • Managed multiple simultaneous projects, prioritizing tasks based on deadlines and resource availability.
  • Enhanced productivity by developing and implementing efficient painting techniques for industrial projects.
  • Increased customer satisfaction by delivering high-quality finishes within budget and on time.
  • Provided expert guidance on surface preparation procedures such as abrasive blasting or chemical treatments necessary for achieving desired finishes on different materials.
  • Contributed to team success by offering valuable input during planning sessions for new projects or improvements to existing processes.
  • Kept accurate records of paint supplies and other materials.
  • Calculated amount of paint and other materials needed for each job accurately.

Asphalt Seal Coater

Gann Asphalt/ Concrete
04.2011 - 01.2013
  • Achieved consistent sealing quality by following standard operating procedures and guidelines.
  • Participated actively in regular safety meetings, ensuring adherence to company policies regarding safe work practices around hazardous materials or machinery related to sealing operations.
  • Ensured compliance with regulatory requirements through proper storage and disposal of chemicals used during the sealer application process.
  • Performed regular preventive maintenance on sealer equipment, prolonging the lifespan of machinery and reducing repair costs.
  • Monitored machine operations to detect malfunctions and report or resolve problems.
  • Monitored gauges, meters, and control panels to obtain information about equipment temperatures and pressures
  • Maintained compliance with environmental regulations by adhering to proper disposal procedures for hazardous materials used in asphalt production and application processes.
  • Implemented innovative techniques in asphalt application to improve durability and lifespan of pavement surfaces.

Education

High School Diploma -

Liberty Senior High School
Liberty, MO.
05.1994

Skills

  • Problem-solving
  • Attention to detail
  • Framing construction
  • Worksite safety
  • Hand and power tools
  • Measuring and cutting
  • Heavy lifting
  • Residential construction
  • Demolition work
  • Tool maintenance
  • Valid Missouri driver's license
  • Window installation
  • Drywall hanging
  • Structural repairs
  • Painting and staining
  • Remodeling projects
  • Inspection and repair
  • Equipment management
  • Client communication
  • Concrete forming
  • Drywalling
  • Scaffolding setup
  • Custom woodworking
  • Insulation installation
  • Staircase construction
  • Critical thinking
  • Basic electrical
  • Door installation
  • Safety guidelines adherence
  • Cabinetry installation
  • Deck building
  • Drilling and framing
  • Roofing installation
  • Basic plumbing
  • Mathematic calculations
  • Project troubleshooting
  • Team collaboration
  • Flooring installation

Timeline

Carpenter/Handyman

KM Construction
06.2021 - 11.2024

Lead Powder Coater/Industrial Painter

A-1 Paint, Powder & Sandblast
01.2013 - 06.2021

Asphalt Seal Coater

Gann Asphalt/ Concrete
04.2011 - 01.2013

High School Diploma -

Liberty Senior High School
Toby Tompkins