Accomplished Senior Construction Project Inspector with the City of Bellevue Transportation Department, adept at enforcing quality control and ensuring compliance with regulations. Expert in interpreting complex construction plans and fostering strong relationships with contractors. Proven ability to manage project risks and negotiate effectively, driving successful outcomes in large-scale public works projects.
Directed inspection operations and contractor management for large-scale construction projects.
Contract Value. $23,145,830.00
Position. Lead Inspector
Scope.
Contractor Designed Buried Structure/Culvert, Drainage system, Runoff Treatment system, Water system, 10" DCVA/Fire, Sewer, Multiple Signal systems, Illumination system, Soldier pile walls, Structural Earth Wall, Temp Geosynthetic retaining wall, SEW traffic barrier w/ moment slab, Reinforced Concrete walls, Pedestrian barrier w/ moment slab, Joint Utility Trench, Curbs, Sidewalk, Ramps, Urban design features, Fencing, Hand Rails, Concrete Pavement, Planing Bituminous pavement, Paving, Channelization, Irrigation and Landscape.
Contract Value. $8,701,145.81
Position. Lead Inspector
Scope.
Drainage system, Runoff Treatment system, Water system, 8" DCVA/Fire, Multiple Signal systems, Illumination system, Structural earth walls, Structural earth wall w/ moment slab, Joint utility trench, Curbs, Sidewalk, Ramps, Urban design features, Fencing, Hand Rails, Concrete Pavement, Planing Bituminous pavement, Paving, Channelization, Irrigation and Landscape.
Contract Value. $13,124,195.33
Position. Lead Inspector
Scope.
Drainage system, Water system/ 10,000 LF Earthquake resistant Iron Pipe (ERDIP) 1,700 LF Restrained joint, Sewer system, Gravity block walls, Soldier pile walls, Curbs, Sidewalk, Ramps, Urban design features, Fencing, Hand Rails, Planing Bituminous pavement, Concrete Pavement, Paving, Channelization, Irrigation and Landscape.
Contract Value. $12,500,018.08
Position. Lead Inspector
Scope.
Drainage system, Runoff Treatment system, Water system, Sewer system, Multiple Signal systems, Illumination system, Fencing, Hand Rails, Planing Bituminous pavement, Paving, Concrete Pavement, Curbs, Sidewalk, Ramps, Urban design features, Channelization, Irrigation, Structural soil, Bioretention soil mix, Soil cell module, and Landscape.
Contract Value. $5,880,918.50
Position. Lead Inspector
Scope.
Drainage system/Detention vault, Runoff Treatment system, Water system, Structural earth walls, SEW Pedestrian barrier, Reinforced soil fill, Multiple Signal systems, Illumination system, Fencing, Hand Rails, Concrete Pavement, Curbs, Sidewalk, Ramps, Urban design features, Planing Bituminous pavement, Paving, Channelization, Irrigation and Landscape.
Contract Value. $14,020,727.61
Position. Lead Inspector
Scope.
Two Superstructures, West Bridge and East Bridge. 6' Diameter drilled shafts, abutments, Prestressed Conc. Girders.
Structural earth walls, Reinforced soil fill, Soldier pile walls, Drainage system, Runoff treatment system, Bioretention planter boxes, Water system, Fencing, Hand Rails, Concrete Pavement, Curbs, Sidewalk, Ramps, Urban design features, Planing Bituminous pavement, Paving, Channelization, Irrigation and Landscape.
Contract Value. $989,687.31
Position. Inspector
Scope.
Upgrade 53 existing ramp locations, Drainage system, Illumination modifications, PS poles, PPB poles, Paving, Temp Channelization and Property restoration.
2015 Contract Value. $4,046,306.95
2014 Contract Value. $3,699,917.44
2013 Contract Value. $3,023,004.10
Position. Inspector/Lead Inspector
Scope.Pavement repair excavation, Planing Bituminous pavement. Paving, Drainage improvements, Illumination modifications, Curb, Sidewalk, ADA Ramps 350 Combined, PS poles, PPB poles, Channelization, Property restoration.
Prior Employment/Summary.
Responsibilities. On site management of Projects, all scheduling pertaining to material deliveries, personal, equipment and trucking. schedule and oversee subcontractors, Track quantities and project costs.
Road Construction Northwest. 2003 - 2013
Position. Superintendent/Foreman
Strider Construction. 2002 - 2003
Position. Foreman
Dennis Craig Construction. 2000 - 2002
Position. Foreman
Tydico Construction. 1995 - 2000
Position. Foreman
Contracts/Projects completed for the following agency's or municipalities.
City of Bellevue
City of Redmond
City of Kirkland
City of Woodinville
City of Seattle
City of Renton
City of Puyallup
City of Auburn
City of SeaTac
City of Lake Stevens
King County
Snohomish County
City of Lynnwood
City of Everett
City of Bellingham
City of Bothell
Concrete.
1989 - 1995
Cement Masons Union/Baugh Construction.
Mr Concrete. High end Decorative Concrete.
David Cieri. (425) 864-8399
Carl Haslam. (425) 770-8395
Teresa Becker. (425) 770-8404
Kyle Thieme. (509) 947-6736