Summary
Overview
Work History
Education
Skills
Timeline
Generic

Todd Straub

Mishawaka,IN

Summary

Dedicated construction professional with extensive experience at K&L Construction, excelling in project management and structural installation. Proven ability to complete projects on time while ensuring worksite safety and maintaining high-quality standards. Strong team player with a focus on problem-solving and equipment operation, consistently adapting to meet dynamic project requirements.

Overview

12
12
years of professional experience

Work History

Construction Worker

K&L Construction
Mishawaka
06.2012 - 09.2024
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Operated power equipment to move materials and promote job efficiency.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Utilized advanced tools and machinery to expedite construction processes, meeting tight deadlines.

Education

GED - General Studies

Mishawaka High School
Mishawaka, IN
05.2016

Skills

  • Project management
  • Equipment maintenance
  • Structural installation
  • Power tool operation
  • Material handling
  • Team collaboration
  • Waste disposal
  • Problem solving
  • Attention to detail
  • Problem-solving
  • Heavy lifting
  • Construction
  • Worksite safety
  • Painting and finishing
  • Equipment operation
  • Basic carpentry
  • Truck loading
  • Framing
  • Flooring installation
  • Carpentry
  • Materials loading
  • Worksite preparation
  • Site preparation
  • Demolition experience
  • Drywall hanging
  • Demolition
  • Framing construction
  • Heavy equipment operation
  • Material transport
  • Scaffolding setup
  • Rebar placement
  • Asphalt paving
  • Construction safety
  • Electrical installation
  • Machinery operation
  • Physical stamina
  • Concrete laying
  • Roofing installation
  • Scaffold erection
  • Dependability and reliability
  • Safety and compliance
  • Measuring and leveling
  • Team player
  • Hand and power tool operation
  • Physical strength and stamina
  • Punctual and dependable
  • Material loading and unloading

Timeline

Construction Worker

K&L Construction
06.2012 - 09.2024

GED - General Studies

Mishawaka High School
Todd Straub