Dynamic Journeyman Lineman with extensive experience at Energy Erectors, skilled in overhead line construction and troubleshooting. Proven ability to enhance system reliability through effective equipment inspection and strong teamwork. Committed to safety and customer satisfaction, consistently delivering high-quality results in challenging environments.
Overview
8
8
years of professional experience
1
1
Certification
Work History
Journeyman Lineman
Energy Erectors
01.2025 - 04.2025
Installed and maintained overhead and Transmission powerlines.
Assisted in troubleshooting electrical issues to ensure reliable service delivery.
Operated specialized tools for line construction and maintenance tasks efficiently.
Followed safety protocols rigorously to minimize hazards on job sites.
Collaborated with team members to complete projects within established timelines.
Conducted inspections of electrical equipment to identify potential failures early.
Participated in training programs to enhance technical skills and knowledge of industry standards.
Documented work activities and progress reports for project tracking purposes.
Constructed new power lines, contributing to the expansion and improvement of the electrical grid.
Collaborated with other linemen to complete complex projects efficiently and within specified timeframes.
Assisted in the training of apprentice linemen, sharing knowledge and expertise to develop future industry professionals.
Repaired damaged equipment promptly with a focus on quality craftsmanship and long-lasting results for increased durability.
Performed skilled aerial work using bucket trucks and climbing gear for efficient access to high-voltage equipment.
Contributed to positive team dynamics through clear communication, collaboration, and mutual support among fellow linemen.
Improved safety measures by conducting regular inspections of transmission and distribution systems.
Set ground anchors and guying systems for utility poles.
Prioritized safety by participating in regular team meetings, addressing potential hazards, and adhering to established procedures.
Managed multiple tasks simultaneously under challenging conditions while maintaining accuracy and attention to detail in all work performed.
Maintained up-to-date knowledge of industry standards, regulations, and safety protocols, ensuring compliance at all times.
Ensured timely completion of assigned tasks through effective time management skills.
Analyzed preparation documents to correctly set up installations at job sites.
Enhanced system reliability by performing routine maintenance on electrical equipment and power lines.
Strung cables between structures and lines from poles, towers, or trenches and pulled lines to proper tension.
Complied with legal regulations and company procedures to achieve high-quality performance in safe working environment.
Streamlined workflow processes by organizing tools and materials effectively before commencing each project or task.
Demonstrated commitment to customer satisfaction by addressing and resolving service-related issues promptly and professionally.
Measured pole attachments and completed proper fitting and construction according to NESC guidelines.
Accessed specific service areas to string lines and install terminal boxes, auxiliary equipment, or metering appliances.
Journeyman Lineman
Brink Contructors
08.2024 - 01.2025
Supervised team operations to ensure compliance with safety regulations and industry standards.
Coordinated daily work schedules for crew members, optimizing productivity and resource allocation.
Trained junior linemen on equipment handling, safety protocols, and best practices in fieldwork.
Conducted inspections of power lines and equipment to identify maintenance needs and prevent outages.
Implemented efficient work methods that reduced downtime during installation and repair tasks.
Collaborated with project managers to align crew efforts with project timelines and objectives.
Monitored job site activities to maintain high-quality standards in line installation and repairs.
Spearheaded training initiatives to improve overall crew competence in areas such as safety protocols, equipment usage, and problem-solving techniques.
Promoted a culture of continuous improvement within the crew by encouraging open feedback regarding work processes and procedures.
Built strong relationships with clients through consistent professionalism and transparent communication practices throughout project durations.
Troubleshot complex electrical systems, identifying root causes of issues and implementing appropriate solutions.
Developed comprehensive job briefings to clearly communicate expectations, resulting in fewer errors on the job site.
Demonstrated strong leadership by setting high expectations for performance, fostering collaboration among team members, and providing constructive feedback for continuous improvement.
Increased project completion rates through effective delegation of tasks and close monitoring of progress.
Maintained high-quality workmanship standards by enforcing strict adherence to company policies and industry best practices.
Collaborated with other departments to ensure smooth coordination between planning, execution, and maintenance phases of projects.
Improved client satisfaction by ensuring timely repairs during outages and maintaining clear communication with stakeholders.
Reduced safety incidents by conducting thorough equipment inspections and adhering to OSHA guidelines.
Led a diverse team of skilled professionals through various stages of powerline installation and maintenance projects, ensuring timely completion.
Expedited outage restoration times by quickly diagnosing issues and coordinating repair efforts among crew members.
Mentored junior linemen in the development of advanced technical skills, promoting professional growth within the team.
Read and interpreted project plans, prepared supplies and developed effective plan of action before beginning work.
Scheduled and oversaw maintenance, repair and installation activities.
Utilized proper tools and materials to adhere to safety guidelines.
Supervised team of installers and mechanics to complete work on time and to company standards.
Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
Managed efficient teams of up to 12 employees.
Evaluated final results to determine quality levels and isolate root causes of any identified faults.
Optimized supply levels to keep stock within ideal parameters for expected needs.
Reviewed and studied blueprints to double-check installation and implementation project requirements.
Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
Set ground anchors and guying systems for utility poles.
Analyzed preparation documents to correctly set up installations at job sites.
Strung cables between structures and lines from poles, towers, or trenches and pulled lines to proper tension.
Measured pole attachments and completed proper fitting and construction according to NESC guidelines.
Accessed specific service areas to string lines and install terminal boxes, auxiliary equipment, or metering appliances.
Complied with legal regulations and company procedures to achieve high-quality performance in safe working environment.
Installed and maintained overhead and underground electrical distribution systems.
Operated tools such as bucket trucks, wire pullers, and cable splicers safely and efficiently.
Collaborated with team members to complete projects while adhering to safety protocols and regulations.
Conducted routine inspections of power lines and infrastructure for maintenance needs.
Implemented safety measures during rigging, lifting, and working at heights to minimize risks.
Documented work completed on job sites to maintain accurate records for project tracking.
Proved successful working within tight deadlines and a fast-paced environment.
Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
Enforced adherence to industry best practices, safety protocols and proper installation techniques.
Collaborated with other linemen to complete complex projects efficiently and within specified timeframes.
Repaired damaged equipment promptly with a focus on quality craftsmanship and long-lasting results for increased durability.
Contributed to positive team dynamics through clear communication, collaboration, and mutual support among fellow linemen.
Improved safety measures by conducting regular inspections of transmission and distribution systems.
Deadended 1590 conductor
Deadended OBGW fiber
Apprentice Lineman
Expanse
12.2023 - 03.2024
Assisted in installation and maintenance of power distribution systems.
Operated various tools and equipment for electrical line work.
Followed safety protocols to ensure compliance with industry standards.
Collaborated with team members to troubleshoot electrical issues efficiently.
Conducted routine inspections of lines and equipment for optimal performance.
Supported experienced linemen during high-voltage service restoration tasks.
Positioned boom trucks and man lifts to reach lines, transformers, and existing connections.
Assisted Journeyman Lineman with work to learn trade and practice techniques.
Expanded skill set through hands-on experience with various tools, machinery, and techniques used in the field of power line work.
Promoted safe working practices within the crew by adhering to established safety protocols at all times.
Gained proficiency in climbing poles, towers, and structures to perform required tasks at varying heights.
Responded to emergency repair calls to conduct line switching or sectionalizing to reroute current and speed service restoration.
Worked to string, splice, and transfer wire in both energized and de-energized circuits.
Traveled to Terrel Tx as part of disaster recovery response following widespread destruction resulting from storms and wildfires.
Used climbers, bucket lifts and safety equipment for work at heights reaching as much as 30 feet above ground.
Played an integral role in maintaining reliable electrical service for customers by participating in regular system upgrades and maintenance procedures.
Participated in ongoing professional development opportunities, including industry-related workshops, training sessions, and certification programs.
Worked on both dead and energized lines.
Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
Performed maintenance and reconducting work in varied weather conditions.
Removed old poles and hardware and replaced with new equipment.
Followed all safety protocols and regulations while working at height and with live electricity.
Inspected power lines for any damage or irregularities and replaced components.
Responded to emergencies and outages that required additional labor and assistance for repairs.
Assisted with constructing new power lines by using appropriate tools and equipment.
Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.
Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
Recorded accurate measurements for installed new power lines and poles.
Proved successful working within tight deadlines and a fast-paced environment.
Enforced adherence to industry best practices, safety protocols and proper installation techniques.
Journeyman Transmission Lineman
Northstar
03.2023 - 03.2024
Performed installation and maintenance of overhead and underground power lines.
Conducted routine safety inspections on tools and equipment to ensure compliance.
Assisted in troubleshooting electrical issues to minimize downtime for customers.
Collaborated with team members to set up job sites and adhere to safety protocols.
Operated heavy machinery, including diggers and lifts, during installation projects.
Documented work completed daily to maintain accurate records for project tracking.
Communicated effectively with customers regarding service interruptions and repairs.
Participated in training sessions to enhance knowledge of electrical systems and safety practices.
Performed maintenance and reconducting work in varied weather conditions.
Removed old poles and hardware and replaced with new equipment.
Trained new team members in proper procedures, fostering a safe and efficient work environment.
Followed all safety protocols and regulations while working at height and with live electricity.
Participated in ongoing training programs to stay current on industry trends and best practices.
Improved workplace safety by conducting regular equipment inspections and maintenance.
Inspected power lines for any damage or irregularities and replaced components.
Installed and maintained overhead and underground power lines according to safety standards.
Conducted routine inspections of electrical equipment to identify potential issues.
Collaborated with team members to troubleshoot and resolve outages efficiently.
Operated specialized tools and equipment for line construction and repair tasks.
Monitored weather conditions to ensure safe working environments during installations.
Assisted in training new linemen on safety protocols and operational procedures.
Implemented best practices for electrical line maintenance to enhance reliability.
Documented work performed and reported findings to supervisors for review.
Responded to emergencies and outages that required additional labor and assistance for repairs.
Worked on both dead and energized lines. (Hotstick jumper removal) in a energized substation
Assisted in emergency storm restoration efforts, restoring power to affected communities as quickly as possible.
Assisted with constructing new power lines by using appropriate tools and equipment.
Utilized advanced diagnostic tools to identify issues in power lines, ensuring timely repairs and minimal downtime.
Maintained a strong safety record by diligently adhering to OSHA regulations and company policies, ensuring the well-being of both team members and the public.
Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
Effectively managed multiple projects simultaneously, prioritizing tasks based on urgency and impact on overall operations.
Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
Contributed to positive teamwork dynamics by effectively communicating with colleagues and supervisors throughout project lifecycles.
Collaborated with cross-functional teams to complete large-scale projects on time and within budget.
Conducted thorough pre-construction assessments to identify potential challenges before beginning work on-site, preventing delays during project execution stages.
Completed complex installations for major power distribution projects, ensuring adherence to industry standards.
Recorded accurate measurements for installed new power lines and poles.
Maintained accurate records of completed tasks, contributing to streamlined operations.
Adhered to strict safety protocols while working at heights or near energized equipment, minimizing accidents on the job site.
Elevated customer satisfaction by restoring power quickly after storm-related disruptions.
Expedited power restoration efforts after natural disasters, mobilizing and directing emergency response teams.
Minimized environmental impact with careful planning and execution of line installations in sensitive areas.
Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.
Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
Proved successful working within tight deadlines and a fast-paced environment.
Enforced adherence to industry best practices, safety protocols and proper installation techniques.
Helicopter Lineman
Source Helios
04.2022 - 12.2022
Fueled aircraft
Clipped conductor off of ladder
Installed marker balls off long line and long line chairs
Replaced conductor insulators
Fiber inspections off long line and climbing gear
Transported fuel tooling and equipment to work sit
Assisted in training new team members on industry standards and practices.
Adhered strictly to regulatory compliance in all operational procedures.
Provided excellent customer service during service calls, addressing concerns promptly and professionally.
Coordinated with utility partners during joint infrastructure projects, facilitating smooth communication channels between teams resulting in successful outcomes.
Supported the development of new processes for increased efficiency in line construction and maintenance activities.
Enhanced public safety by promptly responding to emergency outages and hazardous situations.
Maintained strict compliance with industry regulations and standards, ensuring all work met quality and safety benchmarks.
Performed maintenance and reconducting work in varied weather conditions.
Trained new team members in proper procedures, fostering a safe and efficient work environment.
Followed all safety protocols and regulations while working at height and with live electricity.
Apprentice Lineman-Journeyman Lineman
Primoris T&D
03.2019 - 11.2021
Assisted in troubleshooting electrical issues to ensure optimal system performance.
Operated specialized tools for line construction and repair tasks efficiently.
Conducted routine inspections of equipment to identify potential hazards or maintenance needs.
Collaborated with team members to adhere to safety protocols during field operations.
Mentored junior apprentices on proper techniques and safety practices in lineman work.
Improved workflow processes by implementing best practices for equipment usage and maintenance.
Led training sessions focused on safety standards and operational procedures for new hires.
Developed proficiency in operating heavy machinery such as bucket trucks, digger derricks, and boom lifts to complete various tasks on the job site.
Worked with construction crews to route and re-route power lines around new builds either via above-ground lines or below-ground utilities.
Supported successful project completions by collaborating closely with experienced linemen and supervisors to execute assigned tasks effectively.
Established positive relationships with coworkers, supervisors, and clients by displaying professionalism, strong work ethic, and a commitment to providing high-quality service.
Increased overall productivity by efficiently completing assigned tasks with minimal supervision from senior crew members.
Demonstrated adaptability when faced with unexpected challenges or changes in project scope during daily work activities.
Used climbers, bucket lifts and safety equipment for work at heights reaching as much as 210 feet above ground.
Strengthened communication skills while coordinating with team members during emergency response situations to quickly restore power after outages.
Promoted a culture of safety within the apprenticeship program by consistently adhering to established guidelines for personal protective equipment use and safe work practices.
Assisted in the completion of complex projects, such as high-voltage transmission line installations and maintenance operations.
Shortened and lengthened wires and lines to connect transformers, lighting units, or signals.
Installed and maintained high-voltage transmission lines to ensure reliable electrical service.
Collaborated with team members to troubleshoot and resolve complex electrical issues efficiently.
Conducted safety inspections and implemented best practices to uphold workplace safety standards.
Operated specialized equipment, such as bucket trucks and digger derricks, for line installation and repair tasks.
Trained junior linemen on safety protocols, tools usage, and effective work techniques to enhance team performance.
Developed strategies to optimize work processes, resulting in reduced downtime during installation projects.
Supported ongoing infrastructure upgrades by replacing outdated poles, wires, insulators, transformers as part of planned initiatives.
Inspected and tested lines or cables, recording and analyzing test results to assess transmission characteristics and locate faults or malfunctions.
Constructed new power lines, contributing to the expansion and improvement of the electrical grid.
Assisted in the training of apprentice linemen, sharing knowledge and expertise to develop future industry professionals.
Performed skilled aerial work using bucket trucks and climbing gear for efficient access to high-voltage equipment.
Prioritized safety by participating in regular team meetings, addressing potential hazards, and adhering to established procedures.
Managed multiple tasks simultaneously under challenging conditions while maintaining accuracy and attention to detail in all work performed.
Maintained up-to-date knowledge of industry standards, regulations, and safety protocols, ensuring compliance at all times.
Ensured timely completion of assigned tasks through effective time management skills.
Streamlined workflow processes by organizing tools and materials effectively before commencing each project or task.
Demonstrated commitment to customer satisfaction by addressing and resolving service-related issues promptly and professionally.
Restored power to thousands of customers following severe weather events, ensuring minimal downtime for affected areas.
Set ground anchors and guying systems for utility poles.
Analyzed preparation documents to correctly set up installations at job sites.
Strung cables between structures and lines from poles, towers, or trenches and pulled lines to proper tension.
Measured pole attachments and completed proper fitting and construction according to NESC guidelines.
Complied with legal regulations and company procedures to achieve high-quality performance in safe working environment.
Collaborated with other linemen to complete complex projects efficiently and within specified timeframes.
Repaired damaged equipment promptly with a focus on quality craftsmanship and long-lasting results for increased durability.
Contributed to positive team dynamics through clear communication, collaboration, and mutual support among fellow linemen.
Positioned boom trucks and man lifts to reach lines, transformers, and existing connections.
Assisted Journeyman Lineman with work to learn trade and practice techniques.
Expanded skill set through hands-on experience with various tools, machinery, and techniques used in the field of power line work.
Promoted safe working practices within the crew by adhering to established safety protocols at all times.
Gained proficiency in climbing poles, towers, and structures to perform required tasks at varying heights.
Removed old poles and hardware and replaced with new equipment.
Inspected power lines for any damage or irregularities and replaced components.
Responded to emergencies and outages that required additional labor and assistance for repairs.
Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.
Recorded accurate measurements for installed new power lines and poles.
Proved successful working within tight deadlines and a fast-paced environment.
Followed all safety protocols and regulations while working at height and with live electricity.
Assisted with constructing new power lines by using appropriate tools and equipment.
Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
Performed maintenance and reconducting work in varied weather conditions.
Ground Hand-Apprentice Lineman
Maslonka Powerline Services
03.2017 - 03.2019
Operated heavy machinery to assist in the installation and maintenance of powerline infrastructure.
Monitored safety protocols to ensure compliance during all operational activities on-site.
Collaborated with team members to execute daily tasks efficiently and effectively.
Conducted regular equipment inspections to maintain operational integrity and prevent downtime.
Trained new staff on safety procedures and equipment operation, enhancing team performance.
Coordinated with supervisors to assess project needs and allocate resources appropriately.
Ensured proper use of tools and equipment, reducing the likelihood of accidents or injuries on the job site.
Maintained clean work areas, promoting productivity and minimizing potential hazards for crew members.
Implemented best practices for material handling, improving workflow efficiency within the crew.
Assisted in troubleshooting electrical issues, providing timely solutions to minimize service interruptions.
Increased job site organization by maintaining an accurate record of materials used throughout each project phase.
Improved worksite safety by conducting thorough equipment inspections and maintenance tasks.
Demonstrated adaptability while working under varying weather conditions and adjusting schedules accordingly for maximum productivity.
Contributed to a culture of continuous improvement by providing constructive feedback on job site operations and suggestions for enhancing current processes.
Aided in damage prevention efforts by carefully identifying potential threats before beginning excavation processes.
Supported the completion of projects on schedule by assisting in trenching, digging, and cable installation tasks.
Contributed to a positive team environment through effective communication and collaboration with colleagues.
Performed general housekeeping and cleaning tasks.
Loaded, unloaded, and moved material to and from storage and production areas.
Used variety of hand and power tools to complete tasks.
Maintained work areas by cleaning and straightening for maximum productivity and safety.
Performed necessary repairs on equipment when needed, ensuring minimal downtime for crew operations.
Moved and cleared debris from work sites to dispose of in designated areas.
Followed instructions and safety protocols to prevent accidents and injuries.
Cleaned and maintained tools, equipment and worksites.
Loaded and unloaded materials and equipment onto and off construction sites.
Managed safe and efficient use of tools and equipment on construction sites.
Dug trenches, backfilled holes and compacted earth to prepare for new construction.
Operated forklifts and boom lifts to complete various tasks.
Mixed and poured concrete for variety of projects.
Helped with erecting scaffolding and ladders.
Loaded and unloaded materials onto trucks and trailers.
Worked on sites, installing roofs and other exterior components.
Assisted in digging, trenching and backfilling trenches and foundations.
Operated specialized tools, including diggers and pole trailers, ensuring safe handling and usage.
Conducted routine inspections of powerline infrastructure to identify potential issues or hazards.
Collaborated with team members to execute project plans efficiently and safely under supervision.
Developed strong technical knowledge of electrical systems, transformers, circuit breakers, switches, insulators, and other power distribution components.
Used climbers, bucket lifts and safety equipment for work at heights reaching as much as [Number] feet above ground.
Contributed to a reduction in power outages by promptly identifying and repairing damaged lines and equipment.
Worked to string, splice, and transfer wire in both energized and de-energized circuits.
Worked with construction crews to route and re-route power lines around new builds either via above-ground lines or below-ground utilities.
Assisted in the completion of complex projects, such as high-voltage transmission line installations and maintenance operations.
Positioned boom trucks and man lifts to reach lines, transformers, and existing connections.