Summary
Overview
Work History
Education
Skills
Certification
OSHA 30
Timeline
89
Tony Glenn Conner

Tony Glenn Conner

Construction
Tennessee Colony,TX

Summary

With a proven track record at Vantage Construction, I excel in heavy equipment operation and team leadership, significantly enhancing project efficiency. At Big Creek Construction I led teams to complete projects with utmost precision, demonstrating exceptional problem-solving abilities, effective communication, as well as skills in safe equipment practices and upkeep.

I have gained experience as a professional heavy equipment operator with strong expertise in operating and maintaining a variety of machinery. Known for adaptability in dynamic work environments, I excel in safety protocols, precision operations, and problem-solving, which ensures efficiency and high-quality results. I am a reliable team player focused on achieving operational goals and contributing to project success.

Having developed skills in high-pressure environments, I focus on precision and safety when operating any piece of equipment. Seeking to transition into new field, utilizing transferable skills to contribute effectively in dynamic setting.

Overview

12
12
years of professional experience

Work History

Heavy Eqiupment Operator

Vantage Construction
08.2022 - 09.2023
  • Operated range of heavy equipment on regular basis with advanced skill.
  • Operated excavators, bulldozers and dump trucks to transport heavy materials, practicing safety measures.
  • Adapted quickly to changing project requirements or unexpected obstacles encountered during the course of work assignments.
  • Demonstrated versatility in skillset by operating multiple types of heavy machinery to accommodate project needs.
  • Ensured timely project completion with efficient execution of meticulous operations, and site preparation tasks.
  • Adhered to heavy equipment safety and operation protocols, resulting in zero complaints or incidents.
  • Trained in diverse pieces of equipment and useful attachments to handle team needs.
  • Optimized machine performance with regular cleaning, lubrication, and maintenance checks in accordance with manufacturer guidelines.
  • Increased productivity by operating heavy machinery such as skid-steers, backhoes, bulldozers, forklifts, dump trucks, and excavators for various construction projects.
  • Performed thorough pre-shift and post-shift inspections and accurately completed equipment logs and reports.
  • Played a key role in successful project completions by maintaining open lines of communication with supervisors and team members, ensuring timely adjustments to work strategies when needed.
  • Operated machining equipment safely with team of operators and ground personnel.
  • Strictly adhered to company safety procedures, noticeably decreasing job site accidents.
  • Boosted overall project efficiency by effectively planning machine movements and coordinating with other operators onsite.
  • Demonstrated commitment to safety by consistently wearing appropriate personal protective equipment and following all established protocols.
  • Mitigated potential hazards by promptly reporting unsafe conditions or damaged equipment to supervisors.
  • Upheld company reputation for quality workmanship through precise execution of tasks according to blueprints and specifications.
  • Assisted team in setting up and dismantling equipment and tools to use for construction.

Concrete Operations Supervisor

Big Creek Construction
08.2016 - 08.2022
  • Managed daily operations for optimal performance, ensuring smooth workflows and timely completion of tasks.
  • Maintained open lines of communication with upper management to provide regular updates on operational progress and challenges faced by the team.
  • Interpret job plans, and communicate project details with team members.
  • Coordinate weekly plans, in order the reach production goals, while maintaining safety standards.
  • Conducted regular performance evaluations for direct reports, identifying areas for improvement and setting development goals accordingly.
  • Enhanced team productivity by providing ongoing training, coaching, and mentoring to staff members.
  • Ensured compliance with company policies, industry regulations, safety standards, and local laws during daily operations.
  • Reduced employee turnover by fostering a positive work environment and addressing employee concerns promptly.
  • Enhanced team productivity by implementing dynamic scheduling system that matched tasks with expertise.
  • Improved safety standards by conducting regular audits and training sessions, resulting in fewer workplace accidents.
  • Hired, managed, developed and trained staff, established and monitored goals.
  • Kept high average of performance evaluations.
  • Proven ability to learn quickly and adapt to new situations.
  • Worked well in a team setting, providing support and guidance.
  • Operated range of heavy equipment on regular basis with advanced skill.
  • Operated excavators, bulldozers and dump trucks to transport heavy materials, practicing safety measures.
  • Ensured timely project completion with efficient execution of excavation, grading, and site preparation tasks.
  • Trained in diverse pieces of equipment and useful attachments to handle team needs.
  • Adhered to heavy equipment safety and operation protocols, resulting in zero complaints or incidents.

Concrete Finisher/Concrete Form Carpenter

Webber LLC
09.2013 - 08.2016
  • Set wood and other forming materials to prepare for concrete pours.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread, and patched concrete to specifications.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Created specific finishes on poured concrete.
  • Enhanced overall job site safety by ensuring proper usage of tools and equipment during concrete finishing processes.
  • Operated equipment such as forklifts safely to efficiently complete site work.
  • Reduced material wastage through effective use of leveling, screeding, and concrete smoothing techniques.
  • Interpret job plans to ensure correct project results.

Concrete Finisher/Concrete Form Carpenter

CH2MHill
04.2011 - 09.2013
  • Set wood and other forming materials to prepare for concrete pours.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread, and patched concrete to specifications.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Safely loaded and unloaded trucks using appropriate forklift attachments, reducing the risk of accidents or injuries.
  • Operated forklift in compliance with OSHA guidelines and organizational policies.
  • Maneuvered forklift safely using appropriate load rates and maintaining clear visibility of work areas.
  • Ensured accurate load positioning through precise hand signals and radio communication with crane operators.
  • Ensured precise load placement by accurately calculating load weights and determining proper rigging configurations.

Education

GED -

TVCC
Athens, TX
04-2011

Skills

  • Heavy equipment operation
  • Valid CDL A
  • Safe equipment operation
  • Loader operation
  • Goal oriented
  • Decision-making
  • Problem-solving abilities
  • Team leadership
  • Adaptability
  • Effective communication
  • Good comprehension

Certification

  • Occupational Safety & Health Administration 30-hour Construction Safety Certification (OSHA-30) - Occupational Safety and Health Administration.
  • Commercial Driver's License (CDL) - Department of Motor Vehicles (DMV).

OSHA 30

Acquired the OSHA 10 while working with Big Creek Construction around 2017, and later acquired the OSHA 30 with Vantage Construction.

Timeline

Heavy Eqiupment Operator

Vantage Construction
08.2022 - 09.2023

Concrete Operations Supervisor

Big Creek Construction
08.2016 - 08.2022

Concrete Finisher/Concrete Form Carpenter

Webber LLC
09.2013 - 08.2016

Concrete Finisher/Concrete Form Carpenter

CH2MHill
04.2011 - 09.2013

GED -

TVCC
Tony Glenn ConnerConstruction