Dynamic electrician with extensive experience in various commercial and industrial settings, specializing in terminating PLCs and installing VFDs. Proven ability to execute complex electrical systems with precision and safety. Adept at conduit installation and troubleshooting, demonstrating strong problem-solving skills and a commitment to excellence in high-voltage environments.

Overview

9
9
years of professional experience

Work History

Electrician

Great Basin Industrial
Williston, North Dakota
06.2025 - Current
  • Put together Allen Bradley cabinet and install VFD into the conveyors
  • Grounded light poles, cable trays, and MCC buildings
  • Set and terminated lights and set up panels
  • Worked from ladders, scaffolds, and lifts to install, maintain, or repair electrical wiring, equipment, and lighting fixtures in ceilings, on roofs, and on towers
  • Worked with various types of cable trays, conduits, and other electrical raceways
  • Installed conduit 3/4" - 4"
  • Conduit bending, 90 degree bends and 30 degree offsets

Electrician

MMR Constructors
Las Vegas, NV
05.2024 - 06.2025
  • Terminating PLCs, junction boxes, and other electrical components
  • Pulling wire to and from
  • Bending 3-point, 4-point, box offset, 90-degree angle, 30-degree kicks

Electrician

Duro Electric
Denver, Colorado
01.2022 - 04.2024
  • Assisted with layout and planning of electrical systems on job sites
  • Terminating PLCs and junction boxes
  • Electrical conduit 90 degree bends
  • 3 point Saddle bends
  • 4 point Saddle bends
  • 30 degree offset

Electrician

Dalkia Energy Solutions
Las Vegas, NV
02.2021 - 12.2021
  • Changing lighting system to LED, all phases of VA hospital
  • Replaced one of the old VFD in the workshop conveyors with a new one
  • In one of the mechanical rooms, I replace one of the PLC with new terminal blocks

Electrician

Westcon INC
Ft. Lupton, CO
01.2020 - 01.2021
  • Duct bank work; running PVC conduit
  • Ran conduit, pulled wire, terminating heat trace panels, and terminating in the MCC panels
  • Worked from ladders, scaffolds, and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings, on roofs and on towers
  • Worked with various types of cableways, conduits, and other electrical raceways

Electrician

Saulsbury industries
Greeley, CO
01.2019 - 12.2019
  • Put together Allen Bradley cabinet and installed VFD into the conveyors
  • Grounded light poles, cable trays, and MCC buildings
  • Set and terminated lights and set up panels
  • Worked from ladders, scaffolds, and lifts to install, maintain, or repair electrical wiring, equipment, and lighting fixtures in ceilings, on roofs, and on towers
  • Worked with various types of cable trays, conduits, and other electrical raceways

Electrician

PTW
Greeley, CO
08.2018 - 12.2018
  • Electrical Safety and electrical code knowledgeable
  • Terminated a couple of VFD high voltage also terminated main control center for one for a compression station
  • Terminated PLC and VFD
  • Troubleshoot Hydraulics systems to lift barrels of chemicals

Electrician

PTW
Platte Ville, CO
11.2017 - 07.2018
  • Oil Compression station plant work, new construction, and renovations
  • Work on conveyors systems vfds and MCC, PLC lines 4160 volts
  • Turn over power of that compression station

Electrician

Premier Group
Denver, CO
06.2017 - 11.2017
  • Oil field work
  • Running PVC
  • Running rigid pipe 1"–3"
  • Pulling wire
  • Landing wires in boxes
  • Terminations low and high voltage
  • Pulling wire and running heat trace
  • Worked on VFDs on each pump
  • Connected for power
  • Terminate PLC once we bring one of the MCC
  • Troubleshoot each pump after termination of PLC

Skills

  • Terminating PLCs
  • Updating one-line Power
  • Upgraded ATS
  • Separate Power Source Alone or Isolated
  • Ran Conduit 3/4" to 4"
  • Solar installations
  • Underground Conduit
  • Panel Makeup and Termination
  • Install Transformers
  • Install 3 phase motors
  • Junction box Makeup
  • Install Fire Alarm System
  • Vesda Cabinet Makeup
  • Smoke damper Termination Makeup
  • Stress Cone Makeup
  • 90 degree bends
  • 3 point Saddle bends
  • 4 point Saddle bends
  • Shepards Hook bends
  • 30 degree offset bends
  • Box offset bends
  • Kick bends

Accomplishments

• VFD Installation Success, Led installation of VFDs, improving energy efficiency by 15% in workshop conveyors
• Downtime Reduction, Reduced electrical downtime by 30% through effective troubleshooting of PLC and VFD systems
• LED Lighting Conversion, Managed LED lighting conversion, enhancing energy efficiency across VA hospital by 40%
• High-Voltage Termination, Executed high-voltage terminations, ensuring 99.9% operational reliability of oil field pumps
• Medium voltage stress cone makeup and installation

Timeline

Electrician

Great Basin Industrial
06.2025 - Current

Electrician

MMR Constructors
05.2024 - 06.2025

Electrician

Duro Electric
01.2022 - 04.2024

Electrician

Dalkia Energy Solutions
02.2021 - 12.2021

Electrician

Westcon INC
01.2020 - 01.2021

Electrician

Saulsbury industries
01.2019 - 12.2019

Electrician

PTW
08.2018 - 12.2018

Electrician

PTW
11.2017 - 07.2018

Electrician

Premier Group
06.2017 - 11.2017