Seasoned Electrician with a proven track record in commercial construction and industrial projects, notably with The Premier Group. Excelled in critical thinking and problem-solving, achieving the "Movers of Mountains" award at RK for continuous improvement and leadership. Expert in field installation and known for uplifting team morale through positive engagement.
Worked on a hotel in steamboat Co for CE electric. Ran romex neatly and labeled our wires. Read prints and excecuted according to plans. Ran MC. Used my laser to mount supports in order. Next I went to Idaho and worked on an industrial plant for Mears. Ran ridgid conduit and used the triple nickel. Used flux on the threads of conduit. Used the threader properly and used plenty of oil to preserve sharpness on the tool. Organized wire in trays separating low volt from high volt to avoid running them in parallel or at least separating them 8 inches apart or simply crossed them at 90 degrees. Installed heat sensors. Next I went to Nebraska and worked on an industrial methane plant for Mears. I bent ridgid and made sure I had drains at my lowest section of my runs. Installed Cable tray. Pulled huge wire and kept my head on straight and focused to work as a well oiled machine and help those in need. Provided many of my tools to those who didn't have what they needed for I come to excell and produce.
Worked on a Waste Management Plant for CR Electric. Pre-planned conduit runs and installed pipe firmly and in a neat fashion. Ran flex to motors and terminated. Always kept area clean and safe. Also stayed busy in free time and made our conex look beautiful and organized. At the end of the project my Boss gave me a 500$ milwaukee packout as a gift and thanked me for my hard work.
Installed lights.
Installed Conduit and Electrical Boxes.
Pulled and labeled wire.
Operated Scissor lifts and boom lifts.
Worked in logistics
Organized Material.
Operated Forklift.
Wore a smile and uplifted the crew with a positive attitude.
Installed Conduit and Electrical Boxes.
Pulled and labeled wire.
Responsible for making electrical rooms conduit runs look pristine and sharp.
Pulled and installed Mc.
Installed aircraft warning lights in very dangerous situations.
Unbury collapsed PVC in concrete.
Inspected electrical systems, equipment and components to identify hazards, defects, and repair requirements.
Demonstrated expertise in use of cable reels, stripping tools, voltage detectors, and wire and cable cutters to complete fast-paced work.
Used multimeters to test continuity.
Troubleshot and repaired malfunctioning systems and components.
Interpreted Prints.
Spliced, joined and connected wire to fixtures and other electrical components.
Followed state and local building regulations based on National Electrical Code.
Studied building schematics to determine location of wiring and equipment.
Repaired or replaced wiring, equipment and fixtures using hand tools and power tools.
Examined electrical units for loose connections and broken insulation.
Built Data Centers.
Installed and terminated switch gear.
Terminated Panels neatly.
Ran and encouraged my own crew.
Movers of Mountains award: "Consistent; containers are always finished early and correctly-opens entire team up to help elsewhere." "Consistent refinement; regularly implementing new install strategies-continuous improvement to task"
Attentive; keeps damage to container at minimum when most liable to-minimizes work down the line" "Adaptive; containers are always finished regardless of manpower- prevents lines from ever unbalancing"
"Thoughtful; always asks questions and offers solutions during lead meetings-Exemplifies care for the team" "Pleasant; kind and visible happy mood any day of the week- projects on team and keeps morale high"
Commercial construction experience
Commercial and industrial electrician
Problem-solving
Critical thinking
Field installation