Summary
Overview
Work History
Education
Skills
Timeline
Generic

Troy Holland

Layton,UT

Summary

Dynamic construction professional with extensive experience at General Construction and TOP TIER CONCRETE. Proven problem-solver skilled in concrete finishing and carpentry, consistently delivering high-quality results. Recognized for mentoring junior crew members and enhancing project efficiency, while maintaining a strong focus on safety and attention to detail.

Overview

37
37
years of professional experience

Work History

Construction Worker

General Construction
01.1988 - 01.2025
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Assisted with basic carpentry work such as installing wooden floors and crown molding.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Collaborated with architects and engineers to resolve unforeseen issues, maintaining project momentum.
  • Coordinated with subcontractors to ensure quality standards, achieving high levels of client satisfaction.
  • Oversaw daily site operations, ensuring all tasks were completed according to plan.
  • Used variety of hand and power tools to complete tasks.
  • Loaded and unloaded materials onto trucks and trailers.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Worked on sites, installing roofs and other exterior components.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Helped with erecting scaffolding and ladders.
  • Operated forklifts and boom lifts to complete various tasks.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Adapted to rapidly changing weather conditions and schedules, ensuring project continuity and efficiency.
  • Consistently met or exceeded building codes and regulations, resulting in successful inspections upon project completion.
  • Improved client satisfaction by delivering high-quality workmanship consistently, following up on feedback, and addressing concerns promptly.
  • Operated heavy machinery efficiently, ensuring timely progress on construction projects while minimizing risk of accidents or damage.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
  • Enhanced project efficiency by coordinating with team members and managing resources effectively.

Concrete Foreman

TOP TIER CONCRETE
04.2018 - 12.2024
  • Met with engineers to plan layouts and timeframes for jobs.
  • Poured and laid concrete for [Number] projects.
  • Created specific finishes on poured concrete.
  • Adapted concrete pouring and mixing plans to daily weather and climate.
  • Mentored junior crew members, providing hands-on guidance in various concrete techniques and reinforcing their knowledge of industry standards.
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Set wood and other forming materials to prepare for concrete pours.
  • Inspected equipment and tools used for safe operation.
  • Developed and maintained positive relationships with clients and other stakeholders.

Carpenter

Top Tier Concrete
04.2018 - 12.2024
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
  • Specialized in specific carpentry tasks such as framing, finish work, or restoration projects to provide clients with tailored services and high-quality results.
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Repaired existing structures such as staircases, decks, or door frames with precision to extend their lifespan without compromising structural integrity or aesthetics.

Education

General Construction - Construction

Bridgerland Applied Technology Center
Logan, UT

Contractor's License R100 - Residential/Small Commercial Contractor

Contractor's School of Utah
Salt Lake City, UT

AGC Contractors Pre-Licensure Education Course -

Associated General Contractors of Utah
04-2021

Skills

  • Problem-solving
  • Manual handling expertise
  • Construction
  • Attention to detail
  • Concrete finishing
  • Carpentry
  • Concrete laying

Timeline

Concrete Foreman

TOP TIER CONCRETE
04.2018 - 12.2024

Carpenter

Top Tier Concrete
04.2018 - 12.2024

Construction Worker

General Construction
01.1988 - 01.2025

General Construction - Construction

Bridgerland Applied Technology Center

Contractor's License R100 - Residential/Small Commercial Contractor

Contractor's School of Utah

AGC Contractors Pre-Licensure Education Course -

Associated General Contractors of Utah