Summary
Overview
Work History
Education
Skills
Skills - Project Superintendent
Timeline
Generic
Troy M. Fisher

Troy M. Fisher

Orangevale,CA

Summary

Highly motivated senior project construction superintendent with a strong background in managing projects in challenging environments, such as ground-up industrial, commercial, and large multi-unit residential settings. Experienced in handling hazardous materials, modernizations, tenant improvements, seismic retrofits, medical facilities, box stores, and restaurants. Results-oriented and skilled in coordinating multiple projects and teams simultaneously. Proficient in computer use and adaptable to new technologies and applications. Exceptional communication and problem-solving skills. OSHA 30 certified and more. Seeking a position where management and supervisory skills, along with comprehensive knowledge of all levels of construction, can be maximized to benefit the company.

Overview

35
35
years of professional experience

Work History

Senior Project Construction Superintendent

RCP Construction LLC
02.2015 - Current

Projects

  • URC North Campus Expansion -Ground up -4 story senior living , Concrete footings, columns and shear walls at first floor , above floors and roof PT , Parking Garage and amenities deck above. Additionally four building that are duplex and single unit pt slabs with stick frame. Davis,CA (43 Mil)
  • Plumas Lake Shops building- Ground -Up Shell for sutter medical office. Plumas lake,CA (2.5 Mil)
  • RCP New Corporate Office and warehouse , help new young superintendent that started as laborer and then to carpenter learn how to do underground and get foundations started, scheduling, safety, RFI's , specifications, inspections and who to reach out to for public works , special inspections, etc. (he finished up and did a great job and got it done in 8 months on time) El Dorado Hills,CA (8Mil)
  • 20Th Street Apartments -Ground -Up 5 story 50 units & old warehouse parking garage conversion with heavy structural upgrades. Down Town Sacramento,CA (18 Mil)
  • URC Davis- TI new restaurant kitchen equipment upgrades including ,hoods, epoxy flooring,HVAC ,lighting - additionally added new buffet style line with all new hoods & equipment, HVAC, lighting ,wall's ,flooring , fire suppression , and finishes. Also new large scale dinning hall gut and remodel -high end finishes including walnut trim work with custom finishes Davis, CA (8.5 Mil)
  • Dignity Health Surgery Center - Ground -Up , structural steel building ,Offices , operation room's , pre-opp rooms, disinfection facilities rooms, etc. Citrus heights , CA (11 Mil)
  • Harvard Square Plaza - TI , New cafe/ restaurant indoor outdoor dining Sacramento, CA (1.9 Mil)
  • Conference Direct,Bidwell Offices, Hanson Mclain studios - (Slow construction window)TI's built at the same time and coordinated by me , we still built the small stuff when big things weren't there at times back then... Folsom Ca, (2.5 Mil)
  • Mother Teresa Religious Educational Center , Church addition stand alone building- Ground Up, wood frame building with commercial kitchen,extensive on and offsite improvements. Fremont ,CA (4.4 mil)
  • Party City -Ground Up shell and TI Roseville,CA (4.5

Mil)

  • Linda Mar Shopping center- Demo old restaurant and new ground up building pad. Pacifica , CA
  • Simultaneous TI's in the earley days when Company started and was young -Hanson Mclain Investment 2nd floor,Hurley way, Sacramento , CA - Barbizon Agency ,Sacramento,CA - Auto Fucus Group , Stockton ,CA

Senior Project Construction Superintendent

Key Way Construction Inc.
02.2014 - 02.2015

Project

  • "Almond Heights Senior living & Memory Care " (14Mil) 80 Units Ground-up Construction Orangevale,CA

Senior Project Construction Superintendent

AP Thomas Construction Inc.
02.2011 - 01.2014

Projects

  • "Eldorado Hills Professional Center" 3-Buildings Ground up,Eldorado Hills,CA
  • "Fish And Game TI" McClellan Park,CA
  • "US Forestry TI" McClellan Park,CA
  • "Nation Wide Insurance Trial Division TI" Sacramento,CA
  • "New Veterans Affairs Offices ,Building Hallway extension, Commercial rest room remodels , add new Commercial restrooms TI" McClellan Park,CA
  • "Global Electrical TI" McClellan Park,CA
  • California Family Fitness Corporate Office TI" Orangevale,CA
  • Davis Senior Housing and Fitness Center, Ground up, 4 story building ,New housing units with fitness center- including 3 pools over subterranean parking garage (13 M)" Davis, Ca

Senior Project Construction Superintendent

Reeve-Knight Construction, Inc.
01.2004 - 01.2010

Projects

  • "Vietnam Town phase 1" - Ground Up , 10 buildings 300,000 s/f Retail center,Combination Structural steel Moment frame and wood frame buildings ,extensive off site work on 22 acre site, San Jose, CA ($50M) Completed 2010


  • "Hong Kong Plaza" - 3 Tilt-Up buildings, 120,000 s/f mixed use, combination tilt-up ,structural steel, steel stud framing. Sacramento, CA $12M) Completed in 2008


  • "St Joseph's Catholic Church" Ground Up New sanctuary building and class rooms ,slump block , structural steel with heaver timber superstructure- Lincoln, CA ($10M) completed in 2007


  • "East Parkway Bible Church" Ground up ,wood frame ($4.2M) - Granite Bay, CA

Project Superintendent

Sundt Construction, Inc.
01.2003 - 01.2004

Projects

  • "Carlton Plaza Active & Assisted Living Retirement Community" - Sacramento, CA
  • "Beale AFB Dormitories, Dog Kennel and Administration Building" - Marysville, CA

Project Superintendent

Brown Construction, Inc.
01.1997 - 01.2003

Projects

  • "North Creek Manor" - 6 Buildings, 58 Unit Renovation, Sacramento, CA
  • "Oak Meadows" 4 Story , 80 units , wood frame, sent to take over the project at half way point because to many issues with previous Super,
  • "Harbor homes II" Ground UP , 8 buildings 2 & 3 Story high end condo's, 33 units , new street, slope remedial rebuild, Vallejo, CA
  • "Trenholm Office Complex" Ground -Up ,4 Buildings , block & wood frame combination, Elk Grove, CA
  • "Capitola Redwoods" Ground -up, low income Senior disability housing 2 story , 40 unit wood frame. Capitola,CA
  • "Lincoln Court"- Ground up ,4 Story 60 unit, wood frame Building , zero lot line construction, sent to take over the project at first floor because two previous supers had failed to get it on track and misplaced grade beam that had to be demoed , Santa Monica,CA
  • "SAC Vets" - Ground Up ,3 Buildings, Dorm Housing, Offices & School, Sacramento, CA

Project Superintendent

DMB Construction Corporation
01.1994 - 01.1997

Projects

  • "Villa Lorena Condo Complex" - 12 Buildings,Seismic Retrofit and upgrades after Northridge earthquake, 2-4 Stories, 225 Units, Tarzana, CA
  • "Town & Country Townhouses Seismic Retrofit and upgrades after Northridge earthquake," - 40 Units, Sherman Oaks, CA
  • "Riverside II Townhouses Seismic Retrofit and upgrades after Northridge earthquake," - 40 Units, Sherman Oaks, CA

Project Superintendent

Slater Construction
01.1993 - 01.1994

Project

  • "Northridge Meadows Seismic Retrofit and upgrades after Northridge earthquake," - 3 Buildings, 3 Stories, 175 Units, Northridge, CA

Project Superintendent

Clay Hash General Contracting
06.1993 - 12.1993
  • In charge of all aspects of manpower, materials and construction for numerous apartment and condominium remodels and upgrades after the Northridge earthquake.

Assistant Superintendent

Starbird Construction, Inc.
01.1990 - 06.1993
  • Multi-million dollar custom estates for Nintendo Corporation, Kailua-Kona, HI
  • Multi-million dollar custom estates for Charles Schwab Co., - Kailua-Kona, HI

Education

No Degree - American History

Lassen Community College Online Studies
Susanville, CA
03.2017

GED -

Centennial
Blaine, MN
05-1980

Skills

  • Project Coordination
  • Scheduling
  • OSHA regulations
  • Subcontractor coordination
  • Building codes and regulations
  • Project leadership
  • Effective communication
  • Attention to detail

Skills - Project Superintendent

  • Successfully managed the operations of commercial projects ranging from $2M to $50M, on-time and under budget.
  • Scheduled, directed, and motivated workers including, foreman, carpenters, laborers and subcontractors.
  • Generated accurate field notes and project status reports.
  • Tracked and reviewed progress of projects on a weekly basis.
  • Analyze Project security at all times.
  • Ensured strict adherence to all regulations, and enforced all safety protocols and procedures.
  • Meet with subcontractors, personnel, architects and owners on a weekly basis.
  • Developed and cultivated client relationships to ensure customer satisfaction and promote return business.
  • Project Safety environment and thinking.

Timeline

Senior Project Construction Superintendent

RCP Construction LLC
02.2015 - Current

Senior Project Construction Superintendent

Key Way Construction Inc.
02.2014 - 02.2015

Senior Project Construction Superintendent

AP Thomas Construction Inc.
02.2011 - 01.2014

Senior Project Construction Superintendent

Reeve-Knight Construction, Inc.
01.2004 - 01.2010

Project Superintendent

Sundt Construction, Inc.
01.2003 - 01.2004

Project Superintendent

Brown Construction, Inc.
01.1997 - 01.2003

Project Superintendent

DMB Construction Corporation
01.1994 - 01.1997

Project Superintendent

Clay Hash General Contracting
06.1993 - 12.1993

Project Superintendent

Slater Construction
01.1993 - 01.1994

Assistant Superintendent

Starbird Construction, Inc.
01.1990 - 06.1993

No Degree - American History

Lassen Community College Online Studies

GED -

Centennial
Troy M. Fisher