Summary
Overview
Work History
Education
Skills
Timeline
Generic

Troy Spafford

Paso Robles,CA

Summary

I am a hard worker, and self starter.20 years of construction experience in my field. 3 years experience as post machine operator building a solar plant. experience in HVAC installer in residential housing. Also, experience in underground with communication. have my 10 and 30-hour OSHA Cards, Along with cpr, first aid and boom lift cert. Smoothly direct employees carrying out operations to achieve demanding production goals, schedules and budget targets. Driven leader with excellent analytical, decision-making and project management abilities. Maintain employee focus and achieve quality targets with hands-on supervision.

Overview

21
21
years of professional experience

Work History

Superintendent

California Republic Drywall
02.2023 - 08.2024
  • Demonstrated proficiency in interpreting and analyzing blueprints for construction projects
  • Enhanced communication in RFI process by leveraging Procore blueprints.
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
  • Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Communicated effectively with clients throughout each stage of the project for transparency regarding progress updates as well as addressing any concerns raised promptly.
  • Managed multiple simultaneous projects while maintaining strict deadlines and adhering to budget constraints.

Supervisor/foreman

All Wall Systems Inc.
12.2020 - 09.2022


  • Executed effective interpretation and implementation of blueprints.
  • Effectively submitted R.F.I./Change orders for improved project execution
  • Utilized Procore to enhance time-to-completion metrics
  • Oversaw daily operations of the department, ensuring smooth workflow and timely completion of tasks.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Improved customer satisfaction with timely response to inquiries, addressing concerns, and finding effective solutions.
  • Increased team productivity by implementing efficient workflows and setting clear expectations for staff members.

steel stud framer

Permier drywall (union)
01.2019 - 12.2019
  • Participated in ongoing professional development opportunities to stay current with industry advancements and maintain expertise in steel stud framing techniques.
  • Collaborated with team members to ensure timely completion of construction projects within budget constraints.
  • Reduced material waste by accurately measuring, cutting, and assembling steel framing components.

Laborer Operator

MGE Underground
08.2018 - 01.2019
  • Performed underground maintenance, and installation of conduit, sub boxes for communication lines.
  • Contributed to timely project completions with effective collaboration among team members and efficient task execution.
  • Performed frequent heavy lifting up to [Number] pounds, climbing and working in confined spaces to achieve company goals.
  • Safeguarded company assets with strict adherence to security protocols while operating heavy machinery or handling sensitive materials.
  • Enhanced project efficiency by consistently completing tasks within established deadlines and meeting quality standards.
  • Operated industrial equipment and hand tools for company in [Type] industry.

Foreman

S C Dunn Drywall
01.2015 - 08.2018
  • Manage crews of employees on the commercial side of company
  • Steel stud framing/drywall/act
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Collaborated with project managers in planning stages, advising on schedule adjustments and potential obstacles.

H.V.A.C. Installation/ Repair

smart72
01.2017 - 01.2017
  • Installing heating and air conditioning systems on residential housing.
  • Addressed potential problems preemptively while conducting repairs, preventing future issues from arising.
  • Contributed to company growth, performing efficient installations of new systems and devices for clients.
  • Participated in continuous learning opportunities, staying updated on industry trends and advancements in technology.
  • Adhered to safety protocols, minimizing workplace accidents and creating a secure environment for all team members.
  • Used hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Installed and configured new equipment and systems according to company standards.

Equipment operator

CLP Resources
02.2011 - 05.2014
  • Post machine operator on the structural crew
  • Construction of the 550 megawatt solar plant topaz solar farm.
  • Operated range of heavy equipment on regular basis with advanced skill.
  • Maintained and cleaned equipment after each job and inspected.
  • Operated machining equipment safely with team of operators.
  • Ensured safe working environment through adherence to safety guidelines and protocols for equipment operation.
  • Completed minor repairs and replacements of equipment parts to restore functionality.
  • Assisted in training new operators, providing guidance on proper equipment usage and safety procedures.
  • Used forklifts, hand trucks, scissor lifts, and other equipment to move materials around work sites and organized according to need.
  • Maintained strict adherence to safety and quality standards while operating equipment in dynamic environmental conditions.
  • Enforced compliance with safety standards and regulations related to proper PPE, hand signals and equipment movements.

Steel stud framer

Rls drywall
  • Contributed to overall project success by consistently meeting deadlines and exceeding quality expectations.
  • Mastered the use of various tools and equipment for steel stud framing tasks, resulting in increased productivity on job sites.
  • Increased efficiency in steel stud framing projects by implementing effective time management and planning strategies.
  • Served as a mentor to junior framers, sharing knowledge and providing guidance for skill development within the team.
  • Demonstrated commitment to workplace safety by adhering to all applicable regulations, guidelines, and company policies while performing daily tasks and responsibilities.
  • Participated in ongoing professional development opportunities to stay current with industry advancements and maintain expertise in steel stud framing techniques.

Steel stud framer

All pro drywall
06.2003 - 05.2008
  • Installation of Steel stud framing / labor
  • Improved overall structural integrity of buildings by adhering to established industry standards and best practices for steel stud framing.
  • Streamlined the installation process for drywall and insulation materials by efficiently aligning studs and tracks.
  • Assisted in pre-construction activities such as site preparation, layout marking, material procurement, and planning to facilitate smooth project execution from start to finish.
  • Maintained excellent communication with supervisors, architects, and engineers to address any issues or concerns during the framing process.

Education

GED -

Paso Robles High School
Paso Robles, CA
01.2001

Skills

  • Type foreman
  • OSHA regulations
  • Commercial and residential maintenance
  • General construction
  • Competent with power tools
  • Apprenticeship through Carpenter Union
  • Machinery operation
  • Process implementation
  • Self-motivated
  • Strong verbal communication
  • Non-Load Bearing Wall Construction
  • Wall Framing
  • Safety measures
  • Safety regulations compliance
  • Acoustic Ceiling Installation
  • Layout planning
  • Material Estimation
  • Drywall Installation
  • Ceiling Framing
  • Steel Stud Fastening
  • Load-Bearing Wall Construction
  • Anchor Installation
  • Level and Plumb Checking
  • Measuring skills
  • Steel Stud Cutting
  • Punctuality
  • Problem-Solving
  • Blueprint Reading

Timeline

Superintendent

California Republic Drywall
02.2023 - 08.2024

Supervisor/foreman

All Wall Systems Inc.
12.2020 - 09.2022

steel stud framer

Permier drywall (union)
01.2019 - 12.2019

Laborer Operator

MGE Underground
08.2018 - 01.2019

H.V.A.C. Installation/ Repair

smart72
01.2017 - 01.2017

Foreman

S C Dunn Drywall
01.2015 - 08.2018

Equipment operator

CLP Resources
02.2011 - 05.2014

Steel stud framer

All pro drywall
06.2003 - 05.2008

Steel stud framer

Rls drywall

GED -

Paso Robles High School
Troy Spafford