Summary
Overview
Work History
Education
Skills
Timeline
Generic

Troy Sowder

Lake Crystal,MN

Summary

Dynamic Commercial HVAC Installer Foreman with proven expertise at Schwickert’s Tecta in system installation and ductwork design. Recognized for enhancing HVAC performance and fostering team collaboration, I consistently deliver high-quality results while maintaining OSHA compliance and a safe work environment. Committed to optimizing processes and exceeding client expectations.

Overview

32
32
years of professional experience

Work History

Commercial HVAC Installer Foreman

Schwickert’s Tecta
06.2011 - 11.2024
  • Assembled air ducts, pipes, discharge valves and flues to central heating and cooling equipment.
  • Removed old equipment from customers' businesses and cleaned up areas to prepare for new installations.
  • Maintained a clean, organized workspace during installations and repairs, demonstrating respect for clients'' properties and minimizing disruptions.
  • Located and marked pipe positions, hole passages and duct connections in walls and floors.
  • Installed components to improve HVAC system performance.
  • Collaborated effectively with architects, engineers, electricians, and other construction professionals during large-scale projects, ensuring smooth coordination and successful outcomes.

Shop Foreman

Javens Mechanical Contracting
06.1992 - 04.2011
  • Used hand and power tools, equipment, and instruments accurately.
  • Oversaw maintenance and repair of shop equipment.
  • Trained and coached employees to improve performance and skills.
  • Verified safe and proper operation of wide range of power tools, equipment and instruments.
  • Directed daily operations of team of [Number] technicians and shop professionals.
  • Conducted thorough inspections of completed work, ensuring all projects met or exceeded company and client expectations before final delivery.
  • Managed materials inside shop and at job locations.
  • Coordinated with other departments to ensure timely completion of projects and smooth communication between teams.
  • Maintained open lines of communication with upper management regarding shop updates, challenges faced, and potential opportunities for growth or improvement.
  • Reduced machine downtime by performing regular maintenance checks and addressing issues promptly.
  • Addressed customer concerns in a timely manner, upholding the company''s reputation for excellent customer service.
  • Provided training, coaching and support of staff members, resulting in elevated individual performance to boosted service standards.
  • Safeguarded workplace safety through strict adherence to safety protocols and conducting regular training sessions for staff.
  • Optimized scheduling practices to maximize productivity while minimizing labor costs without sacrificing quality or safety standards.
  • Managed a team of skilled technicians, fostering a positive work environment that encouraged professional growth and development.
  • Fostered a strong team dynamic by promoting trust, open communication, and collaborative problem solving among team members.
  • Streamlined workflow processes by identifying bottlenecks in production and implementing appropriate solutions to alleviate them.
  • Managed resources, materials, systems maintenance, regulatory compliance, schematics implementation and proper documentation of orders, operations, schedules and evaluations.

Education

Buffalo Lake High School
Buffalo Lake, MN

Skills

  • System installation
  • Ductwork installation
  • Sheet metal fabrication
  • OSHA compliance
  • HVAC controls
  • Duct sizing and design
  • Equipment installation
  • Adaptable
  • Soldering
  • Quality-focused
  • Welding techniques
  • Troubleshooting expertise
  • Team collaboration
  • Issue troubleshooting
  • Commercial installation

Timeline

Commercial HVAC Installer Foreman

Schwickert’s Tecta
06.2011 - 11.2024

Shop Foreman

Javens Mechanical Contracting
06.1992 - 04.2011

Buffalo Lake High School
Troy Sowder