Summary
Overview
Work History
Education
Skills
Timeline
Generic

Truman Blake

Page,AZ

Summary

Adept at rigging and crane operations with a proven track record of enhancing workplace safety and efficiency, as demonstrated at Brahma Group Inc. Excels in blueprint interpretation and welding, underpinned by strong leadership and attention to detail. Achieved significant project milestones through effective supervision and job planning, embodying reliability and trustworthiness.

Overview

1
1
year of professional experience

Work History

Ironworker/Rigger Foreman

Brahma Group Inc
06.2024 - 08.2024
  • Demo HG scrubber train 1 and train 2
  • Assigned task to crew members and monitored productivity, performance, and task completion
  • followed blueprints and instructions from supervisors to erect columns, braces, beams, platforms
  • followed Operational Safety and Health Administration (OSHA) regulations to promote safe equipment operation and work place safety
  • laid out, positioned, aligned, and secured columns, beams, platforms, and frames for supports
  • Heavy rigging and bull rigging ducts, pipes, equipment/materials in locations

Ironworker/Rigger Foreman

CORE Industries
04.2024 - 06.2024
  • Read and interpreted work order specification and information to plan, schedule and carry out jobs effectively
  • Used crane to lift and guide columns into positions, hang roof truss to tie in columns, installed rails for overhead crane, hung all girders and perlins
  • Used com-alongs, chokers, shackles and cables to rack and plumb structure
  • Motivated and encouraged team members to communicate more openly and constructively with each other
  • Reported project progress , site problems, and labor status to supervisors

Ironworker/Lead Rigger

Total Western
03.2024 - 03.2024
  • Skillfully operated hand tools such as spud wrenches or drift pins for aligning bolt holes in steel members during assembly processes.
  • Set all chainfalls in locations needed to install columns, beams, and fillers
  • Laid out locations for columns using tape measure, laser, chalk line
  • Followed blueprints and instructions from supervisor

Ironworker/Rigger Leadman

Red Cedar Steel
10.2023 - 03.2024
  • Provided reliable support during rigging operations to ensure the safe lifting of heavy steel beams or equipments into place.
  • Used blueprints to laid out locations for cut out at roof deck for pedistals
  • Coordinated with crane or signaled equipment operators to lift and position structural steel members or materials at roof using radios
  • Shaking out steel, stair stringers, handrails, and gratings at laydown yard
  • Set all screen walls, plumb, tacked, and secured
  • Went over work scope with the crew and assigned task for the day

Ironworker/Rigger Foreman

Parson Steel
10.2023 - 10.2023
  • Outage, Demo, Erect steel and platforms
  • Instructed all team members where to hang chainfalls and what rigging equipment is needed to safely pull out or reinstall materials
  • Demo outlet duct, louver damper, 2 expansion joints at TA duct, and recop duct
  • Heavy rigging, bull rigging, transferring loads using rigging equipment and crane
  • installed all new materials and welded chill rings at joints with SMAW and FCAW

Ironworker/Rigger Foreman

Brahma Group Inc
07.2023 - 09.2023
  • Complied with OSHA and company safety guidelines for height safety, lock out tag out, confined space, and hazardous material handling.
  • Project HG scrubber train 3
  • Demo duct from evase to collector
  • Installed all new ducts, primary demister, secondary demister, collector, recycle duct, platforms, and steel
  • Erect stair case from bottom to top of steel.
  • Shoot all elevations for columns using bench marks
  • Coordinated with crane or signaled forklift operator to lift and hoist beams, columns, materials
  • Laid out all new locations for holes to be drilled

Ironworker Leadman

Big-D Construction
06.2023 - 06.2023
  • Shoot elevations for columns
  • Used radio to communicate with crane operator to erect steel
  • Skillfully operated hand tools such as spud wrenches or drift pins for aligning bolt holes in steel members during assembly processes.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Reviewed work plans and blueprints to ascertain all requirements for project.
  • Followed blueprints and instructions from supervisor to assemble conveyor line.
  • Bolted on legs to frame, bolted on Idler and return rollers, installed tail and head pulley plus belts

Welder

Day & Zimmermann
05.2023 - 05.2023
  • Prepared welding equipment to perform advanced welding work.
  • Completed welding projects using gas metal arc, flux-cored arc, plasma arc, and shielded metal arc equipment.
  • Demo inside V bottom using plasma cutter and torch
  • Removed drag chain and replaced new
  • Installed new 8' x 12' AR plates inside bottom ash top and bottom for drag chain
  • Rigging plates, pipes, and materials needed in locations

Education

GED -

Clearfield High
Clearfield, UT
05.2002

Skills

  • Rigging and crane operations
  • Blueprints and specification
  • Welding and fabrication
  • OSHA Compliance
  • Job Planning
  • Supervision and leadership
  • Reliable and trustworthy
  • Strong leadership abilities
  • Heavy lifting
  • Maintenance and repair
  • Structure erection
  • Attention to Detail

Timeline

Ironworker/Rigger Foreman

Brahma Group Inc
06.2024 - 08.2024

Ironworker/Rigger Foreman

CORE Industries
04.2024 - 06.2024

Ironworker/Lead Rigger

Total Western
03.2024 - 03.2024

Ironworker/Rigger Leadman

Red Cedar Steel
10.2023 - 03.2024

Ironworker/Rigger Foreman

Parson Steel
10.2023 - 10.2023

Ironworker/Rigger Foreman

Brahma Group Inc
07.2023 - 09.2023

Ironworker Leadman

Big-D Construction
06.2023 - 06.2023

Welder

Day & Zimmermann
05.2023 - 05.2023

GED -

Clearfield High
Truman Blake