I have 2 1/2 years of experience in the electrical trade as a Construction Wireman 2. I worked for B & B Electric for the IBEW Local 158 from August of 2019 thru November of 2021. I traveled for them to Vancouver WA October and Nov of 2021.
Overview
5
5
Industrial Spray Painter
3
3
Construction Wireman 2
7
7
Customer Service
Work History
Industrial Spray Painter
Elite Coatings
Howard, WI
08.2022 - Current
Painted surfaces using brushes, spray guns and paint rollers.
Prepared surfaces and surrounding areas for painting using sandpaper, tape and other materials.
Operated power sprayers and hand tools to prepare and paint large areas.
Climbed scaffolding, staging, ladders and planks to reach work area surfaces and observed safety protocols to prevent falls.
Prepared trim, walls and ceilings for painting by cleaning, smoothing and priming.
Protected surfaces from damage and spills by using drop cloths prior to and during painting.
Applied putty, wood filler, spackling and caulks to prep uneven surfaces and fill in holes.
Applied primer, paints, varnishes and lacquers to walls and surfaces using traditional and sprayer methods.
Repaired wall holes and scrapes.
Painted indoor areas such as hallways, bathrooms and lobbies.
Worked holidays and weekends depending on shifting needs of project.
Mixed and matched paints according to customer specifications.
Selected proper amount and type of thinners and accelerant to be used for specific jobs.
Held or positioned spray guns to direct spray onto articles.
Optimized paint adhesion with proper primer application.
Industrial Spray Painter
Tradesman International - Pierce Manufacturing
Appleton, WI
03.2022 - 08.2022
Painted surfaces using brushes, spray guns and paint rollers.
Prepared surfaces and surrounding areas for painting using sandpaper, tape and other materials.
Operated power sprayers and hand tools to prepare and paint large areas.
Climbed scaffolding, staging, ladders and planks to reach work area surfaces and observed safety protocols to prevent falls.
Prepared trim, walls and ceilings for painting by cleaning, smoothing and priming.
Protected surfaces from damage and spills by using drop cloths prior to and during painting.
Applied putty, wood filler, spackling and caulks to prep uneven surfaces and fill in holes.
Applied primer, paints, varnishes and lacquers to walls and surfaces using traditional and sprayer methods.
Repaired wall holes and scrapes.
Painted indoor areas such as hallways, bathrooms and lobbies.
Worked holidays and weekends depending on shifting needs of project.
Mixed and matched paints according to customer specifications.
Selected proper amount and type of thinners and accelerant to be used for specific jobs.
Moved painted items to drying racks and finished coated surfaces by baking painted items in oven.
Organized safe and compliant disposal of hazardous materials to protect team members and local environment from damage.
Removed surface imperfections, applied special undercoats and sealed seams to ready surfaces for paint application.