Overview
Work History
Education
Skills
Timeline

Ty Bevington

Valley Corporation
5
years of professional experience

Work History

General Laborer

4 Years 8 Months
Valley Corporation | 12.2021 - 08.2026

Responsibilities

Management of jobsite when Supervisors are gone. Plan reading and problem solving, operating heavy equipment, and general labor.

Notable Projects

192nd and W Center RD - Installation of sanitary and storm water pipe. On-site responsibilities included pipe rigging, passing down sanitary pipe, cutting, and spotting.

204th and Blue Sage - Construction of a large Arch Culvert. On-site responsibilities included installation and removal of doka forms while suspended in harness. Vibrating and pouring concrete, guiding and building arch culvert pieces.

Lake Manawa Levee Project - Flood risk management project utilizing dredged sand to stabilize the local levee system. On site responsibilities included operating of Excavators, Fendt tractors, bulldozers, and maintenance of heavy equipment.

Elkhorn Center Paving Project - SID paving project. On site responsibilities included construction of formwork, pouring and finishing concrete for handwork and paving, backing up concrete trucks, planning and grading access roads for concrete trucks. Maintenance on gomaco and wirtgen paver. Setting up GPS for trimming, paving, and subgrade work. Operating road graders, dozers, smooth drum and sheeps foot rollers, excavators, front end loaders, and skid loaders for subgrade work. Quantity take off and ordering of concrete and asphalt.

Education

Bachelor of Science - Construction Management

Colorado State University | Fort Collins, CO | 05-2028

High School Diploma

Douglas County West | Valley, NE | 05-2024

Skills

Heavy Equipment operating - I can confidently operate excavators
front end loaders
dozers
road graders
rollers
skid loaders
john deere
massey
and fendt tractors
side dump trailers
and scraper trailers.
Plan reading and QTO - Reading of plans to identify location of pipe
formwork
joint spacing
haul roads
quantities for asphalt and concrete.
Creative Problem Solving - When an issue arises I have developed the skills necessary to solve and innovate the jobsite. I can confidently set up an efficient plan for all paving operations whether it be subgrade
site access
formwork
paver maneuvers
GPS
and QTO for asphalt or concrete.
Leading - I have been left in charge of the jobsite numerous times and have experience in delegating work while focusing on my own tasks.

Timeline

General Laborer

Valley Corporation
12.2021 - 08.2026Read More

Colorado State University

Bachelor of Science from Construction Management
Read More

Douglas County West

High School Diploma
Read More
Ty Bevington