Summary
Overview
Work History
Education
Skills
Timeline
Generic

Tye Harrison

Shiprock,NM

Summary

Dynamic Lead Carpenter with a strong track record at Beard Inc, excelling in formwork construction and concrete finishing. Known for fostering teamwork and enhancing productivity through effective project management. Good in operating heavy machinery and committed to delivering high-quality workmanship with a strong attention to detail.

Overview

5
5
years of professional experience

Work History

Lead Carpenter

Sychar LLC
01.2024 - 05.2025
  • Maintained proper curing conditions after pour completion for optimal strength development within finished products.
  • Fostered positive working relationships with fellow carpenters through clear communication and teamwork in accomplishing shared goals.
  • Streamlined construction processes by utilizing appropriate tools and equipment for each task.
  • Assisted with overall site preparation before beginning the construction process.
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Assisted with installation of steel and anchor bolts to reinforce concrete.

Lead Carpenter

Beard Inc
01.2023 - 12.2023
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Led garages, residential homes, and addition projects to completion.
  • Conducted thorough final inspections of completed projects to assure adherence to specifications and industry standards.
  • Enhanced team productivity by implementing efficient project management strategies and prioritizing tasks.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Constructed high-quality formwork systems, contributing to successful concrete installations on various projects.
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Interpreted blueprints and diagrams to determine project dimensions and requirements.
  • Set wood and other forming materials to prepare for concrete pours.
  • Demolished and repaired old concrete surfaces.
  • Installed rebar and molded expansion joints and edges for concrete projects.

Carpenter Apprentice

TRC Construction
07.2021 - 01.2022
  • Kept job site cleaned up properly and all debris disposed of in respective containers.
  • Utilized hand tools such as hammers, chisels, levels, squares, and measuring tapes to complete tasks with precision and efficiency.
  • Collaborated with experienced carpenters to improve skillset through hands-on training and mentorship opportunities.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Prepared materials accurately using hand and power tools to make precise cuts.
  • Achieved accurate cuts using miter saws, table saws, circular saws, jigsaws, routers, planers while adhering to all safety protocols.
  • Enhanced job site safety through diligent adherence to OSHA regulations and maintaining a clean work environment.
  • Aided in the maintenance of power tools and equipment to ensure optimal performance and longevity on job sites.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Increased project durability through proper reinforcement installation and attention to detail during concrete pours.
  • Set wood and other forming materials to prepare for concrete pours.
  • Demolished and repaired old concrete surfaces.
  • Installed rebar and molded expansion joints and edges for concrete projects.

Laborer

Moltz
04.2020 - 06.2021
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Expanded skill set through continuous learning of new techniques, tools, and equipment related to laborer tasks.
  • Improved worksite efficiency by maintaining clean and organized work areas.
  • Performed general housekeeping and cleaning tasks.
  • Contributed to successful completion of projects by following instructions from supervisors and adapting to changing priorities.
  • Maintained high-quality workmanship through attention to detail and adherence to industry standards.
  • Mitigated potential hazards with thorough site cleanup efforts at the end of each workday.
  • Loaded and unloaded materials onto trucks and trailers.
  • Followed instructions and safety protocols to prevent accidents and injuries.

Education

Engineering

San Juan College
Farmington, NM

High School Diploma - Diploma

Shiprock High School
Shiprock, NM
05.2020

Skills

    *Build/Set forms, Build walls,columns,slabs

    *knowledge of form/rebar drawings

    *Set & shoot elevation grade

    *operate loader, excavator, skid steer, forklift, backhoe

    * Concrete finisher, flattop, curb-gutter

    *underground untilities

    *work great with others

    * strong pride in my work

Timeline

Lead Carpenter

Sychar LLC
01.2024 - 05.2025

Lead Carpenter

Beard Inc
01.2023 - 12.2023

Carpenter Apprentice

TRC Construction
07.2021 - 01.2022

Laborer

Moltz
04.2020 - 06.2021

Engineering

San Juan College

High School Diploma - Diploma

Shiprock High School
Tye Harrison