Committed and hardworking with strong background monitoring, operating and controlling equipment any setting. Highly skilled at using trade equipment as well as monitoring operations by reading charts, meters and gauges. Expert at identifying, analyzing and troubleshooting technical problems to resolve quickly.
Overview
11
11
years of professional experience
Work History
Asphalt Plant Operator
Harrison ConstructionAPAC-TN
04.2015 - Current
Enhanced asphalt production efficiency by streamlining plant operations and implementing effective maintenance procedures.
Reduced equipment downtime by conducting regular inspections and proactively addressing potential issues.
Improved safety standards by developing and enforcing strict protocols for all team members in the plant environment.
Optimized resource usage by consistently monitoring inventory levels and scheduling deliveries accordingly.
Collaborated with project managers to ensure timely delivery of high-quality asphalt mixtures for various construction projects.
i have closely working with dale lewis under mentorship for the past nine years learning to not only run the plant but how to take care of our customers and the plant
over the years i have had a hand in turning almost every bolt and fixing what needs to be fixed at the time or preventative maintenance when we see something that could cause a problem
dale has given me and shown me every way to be successful in this industry
Increased overall productivity with consistent training, coaching, and mentoring of new hires and existing employees on best practices in asphalt production processes.
Ensured compliance with environmental regulations, maintaining proper documentation for audits and inspections as required.
Contributed to cost-saving measures by closely tracking expenses and identifying areas for improvement within the plant operations.
Developed strong relationships with vendors, negotiating favorable contracts for raw materials and spare parts essential to plant operations.
Provided technical support to field teams during road construction projects, troubleshooting any issues related to asphalt mixture specifications or performance.
Maximized team effectiveness through clear communication of goals, expectations, and performance feedback for each employee under my supervision.
Assisted in quality control efforts by working closely with laboratory technicians to test samples regularly, ensuring adherence to established product specifications.
Contributed to a positive work environment by fostering collaboration, open communication, and mutual respect among team members.
Managed day-to-day administrative tasks such as scheduling, timekeeping, and reporting to ensure smooth overall operation of the asphalt plant facility.
Administered asphalt plant safely and managed schedules and daily duties for plant personnel.
Operated controls that admitted materials separately from storage hoppers or mixing bins.
Maintained and repaired plant equipment using cutting torch, welder, pneumatic drill and sledgehammer.
Placed orders for materials and equipment with vendors.
Suggested specific ideas for process, productivity and safety improvements.
Managed and monitored processes and machine systems by observing readings on control boards.
Analyzed and inspected operating units such as towers, storage tanks and other units to check operation and improve efficiency.
Observed indicator showing material levels and regulated controls for required asphalt materials mixture.
Lightning Protection and Grounding Installer
Alp Systems -lightning Protection & Power Quality Engineers
07.2013 - 03.2015
Improved safety standards by designing and implementing comprehensive lightning protection systems.
Enhanced grounding system efficiency by conducting thorough inspections and maintenance tasks.
Reduced risk of electrical hazards with meticulous installation of grounding equipment.
Optimized system performance, upgrading outdated lightning protection components as needed.
Collaborated with engineers to develop custom solutions for complex projects involving lightning protection and grounding systems.
Ensured compliance with industry regulations by strictly adhering to installation guidelines and best practices.
Education
High School Diploma -
Pisgah High School
Canton, NC
04.2013
Skills
Environmental Compliance
Heavy Equipment Operation
Equipment Troubleshooting
Quality Control Analysis
Time Management
Continuous Improvement
Adaptability
Team Coordination
Inventory Management
Multitasking
Decision Making
Maintenance and Repair
Material Handling
Customer Service
Plant Safety Protocols
Computer Literacy
Batching Process Knowledge
Attention to Detail
Project Management
Plant Operations
Parts Repair and Replacement
Plant Machinery and Equipment
Daily Outage Reports
Documentation and Reporting
Timeline
Asphalt Plant Operator
Harrison ConstructionAPAC-TN
04.2015 - Current
Lightning Protection and Grounding Installer
Alp Systems -lightning Protection & Power Quality Engineers
Curative Specialist at Liepold Harrison & Associates, Harrison McLaughlin & AssociatesCurative Specialist at Liepold Harrison & Associates, Harrison McLaughlin & Associates