Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Tyler Greenwell

Elk River,MN

Summary

Effective at operating and setting up injection molding and thermoset machines in high-volume manufacturing settings. Dependable and industrious with an adaptable approach and good physical fitness. Proficient in documentation, equipment maintenance and quality assurance guidelines.

Overview

8
8
years of professional experience
1
1
Certification

Work History

Set-up Technician

Action Plastics inc
Rogers, MN
05.2024 - Current
  • Set up and take molds out of injection molding machines
  • Start up and shut down injection molding machines and other related equipment
  • Cleaned and maintained operation of injection molding machines
  • Trouble shoot process to make good and acceptable parts
  • Use forklift to put molds into and take out of injection molding machines
  • issue materials and clean related equipment

Set-up Technician

Solidify Manufacturing
Rogers, MN
03.2023 - 05.2024
  • Set up and take molds out of injection molding and thermoset machines
  • Start up and shut down injection molding and thermoset machines and other related equipment
  • Cleaned and maintained operation of injection molding and thermoset machines
  • Trouble shoot process to make good and acceptable parts
  • Use overhead crane, calipers and other devices to quickly and effectively perform job duties
  • Issue all materials

Injection Molding Setup Technician

Graco
Rogers, MN
11.2021 - 02.2023
  • Set up and take molds out of injection molding machines
  • Start up and shut down injection molding machines and other related equipment
  • Cleaned and maintained operation of injection molding machines
  • Trouble shoot process to make good and acceptable parts
  • Use overhead crane, calipers and other devices to quickly and effectively perform job duties.

Extrusion Machine Operator

Medical Extrusion Technologies
Elk River, MN
06.2020 - 10.2021
  • Set up machinery and ran extrusion lines producing products such as plastic tubes.
  • Read and followed production schematics to produce products in line with design and manufacturing standards.
  • Achieved production targets by maximizing changeover efficiency and setting up extruder equipment.
  • Measured and tested products against specification requirements and communicated issues immediately to manager for remediation.
  • Set dials and controls on machine to create products of correct size, shape and thickness.

Insulator

Crystal Distribution Inc
Elk River, MN
11.2017 - 08.2020
  • Install insulation materials into metal curbs and finish curbs with the use of foil tape, lifting lugs , CDI labels, as well as pneumatic nail guns, tape measure and impact driver

Assembler

Graco Inc.
Rogers, MN
05.2019 - 08.2019
  • Inserted and positioned materials and clamped, spliced and fitted parts using hand and power tools
  • Operated greasing equipment to grease components, sub-assemblies or assemblies
  • Positioned and aligned components to complete accurate assembly work
  • Formed assemblies and subassemblies using hand and power tools
  • Checked parts against stock lists, and materials specifications to verify compliance with standards

Parks Maintenance

City of Robbinsdale
Robbinsdale, MN
06.2017 - 08.2018
  •  Maintained collection of 14 city parks landscaping.
  •  Included lawn maintenance, trash removal and scheduled park upgrades.

Education

METS - Hennepin Tech, Plastics AAS

Hennepin Technical College
Brooklyn Park, MN
2023

Diploma - Plastics

Hennepin Technical College
Brooklyn Park, MN
2020

HS Diploma -

Elk River Senior High School
Elk River, MN
2017

Skills

  • Mold handling
  • Material handling
  • Machine operator
  • Assembly
  • Landscaping
  • Crew trainer
  • Customer service
  • Insulating
  • Sale

Certification

Forklift/fork truck gas and electric certified by Hennepin Tech.

Extrusion molding certificate certified by Hennepin Tech.

Injection molding certificate certified by Hennepin Tech

Paulson Plastic Academy ProMolder 2

CPR AED and First Aid

Timeline

Set-up Technician

Action Plastics inc
05.2024 - Current

Set-up Technician

Solidify Manufacturing
03.2023 - 05.2024

Injection Molding Setup Technician

Graco
11.2021 - 02.2023

Extrusion Machine Operator

Medical Extrusion Technologies
06.2020 - 10.2021

Assembler

Graco Inc.
05.2019 - 08.2019

Insulator

Crystal Distribution Inc
11.2017 - 08.2020

Parks Maintenance

City of Robbinsdale
06.2017 - 08.2018

METS - Hennepin Tech, Plastics AAS

Hennepin Technical College

Diploma - Plastics

Hennepin Technical College

HS Diploma -

Elk River Senior High School