
Dependable Electrician skilled in performing preventive and regular maintenance work on electrical systems. Adapts to new technology and concepts. In-depth knowledge of generators, transformers and circuit breakers. Punctual and hardworking individual dedicated to cultivating excellent relationships with clients.
• Firewatch / hole watch / bottle watch
• Learn the rules and regulations on how to operate a fire exstinguisher
• Stay at job after 30 minutes of last spark
• Dock time for entering and exiting confined space areas
• Read gas detector
• Worked in a group, able to communicate well thoroughly
• Greet others that didn’t know what exactly they were supposed to install
• Climb scaffolds, worked in high areas, supply tools, able to measure pipe and insulation
• brush and roll , spray paint and abrasive blasting on pipes and vessels
• Equipped thinner, sand paper and used three composition paint coating
• Installed Insulation(calcium on pipes) , perlite , aerogel , foam glass
• Installed insulation on steam lines, put on 90 degree, wrap metal on insulation
• Installed banners, put on cocing so water doesn’t get inside the metal onto the insulation
• Brush and roll , spray paint and abrasive blasting on pipes and vessels
• Equipped thinner, sand paper and used three composition paint coating
Installed Insulation(calcium on pipes) , perlite , aerogel , foam glass
• Run conduit 1/2 - 3 , threading and reaming
1224, 535, greenlee, chicago bender, big shot
• RTD and power , pull wire , offsets , deducts, 120v/208v
• Install cable tray , install boxes , run wire to motors , audit control panels , install heat tracing
• bend conduit, EMT 1/2 , install flex , PVC ductbanks , use fish tape for cable wiring #10,#12
• install heat tracing
• bend stub 90s , 4 point saddle
• Aluminum , rigid
• mc cable
• ground wire #2,#4,#6,#8
• glanding crx cable single pair 2/c
• install holes 1/2-3 in. / knockout into j-boxes
• install cables, crx cable, marine cable
• glanding cables, install punch tray
• closing end caps and plugging end of tubing
• terminate single pair wire
• swag tubing .49, .65, .83
• install teflon on plugs
• install pvc and emt
• pulling cable 3 conductor , 2 conductor and single pair
• install cable in cable tray properly
Inspection and Repair
Active Listening
Good communication and reading skills
Installation and Maintenance
Attention to detail
Problem solving
Team work and collaboration
Positive attitude and work ethic
Safety and compliance awareness
OSHA 30
OSHA 10
TWIC