Professional Summary
Overview
Work History
Education
Skills
Additional Experience
Timeline

Tyler Humphries

Hydro Extrusions
Collinston,USA
10
years of professional experience

Experienced industrial PLC technician and electrician with a strong track record improving uptime, product quality, and safety in manufacturing environments. Skilled in Allen-Bradley PLC platforms, drives, machine logic optimization, and cross-functional leadership. Comfortable leading production, delegating maintenance, and training teams to troubleshoot safely and efficiently.

Work History

PLC Technician

3 Months
Hydro Extrusions | 03.2026 - Current
  • Refined PLC programming to improve production, while ensuring high-quality output while reducing equipment downtime.
  • Diagnosed and resolved PLC malfunctions to ensure uninterrupted production processes.
  • Configured and programmed VFDs to improve acceleration profiles, effectively reducing wear on mechanical components.
  • Resolved logic-related faults, enhancing operational efficiency through timely corrective updates. Executed component replacements, minimizing downtime for motors, starters, controllers, and rectifiers. Achieved successful PLC rack and rectifier replacements, ensuring seamless system integration.
  • Analyzed and corrected PLC malfunctions, ensuring consistent production flow and operational efficiency.
  • Developed and implemented preventative maintenance schedules to enhance system reliability.
  • Collaborated with engineering teams to optimize PLC programming for efficiency improvements.
  • Trained junior technicians on PLC troubleshooting techniques and safety protocols.
  • Streamlined communication between departments to facilitate timely issue resolution and workflow coordination.

Electrician/Mechanic

4 Years
Berry Global Inc. | 03.2022 - 03.2026
  • Assisted with new automation equipment setup. Supported maintenance of Micrologix PLCs and Yaskawa drives for reliable performance.
  • Assisted in mechanical rebuilds of bearings, sprockets, drive shafts, nip rollers, motors, gearboxes, and water pumps. Rebuilt cylinders to restore functionality.
  • Developed and delivered comprehensive training programs for new maintenance staff to ensure adherence to safety and efficiency standards.
  • Oversaw programming and operation of PLC-5, SLC 500, and ControlLogix systems utilizing Studio 5000. Managed troubleshooting efforts for DeviceNet and ControlNet systems, enhancing performance of Allen-Bradley and Mitsubishi drives and various starters.
  • Oversaw support for limited 4-20 mA instrumentation related to actuators and valves. Coached electricians and operators on safe troubleshooting practices and operational procedures.

Lead Electrician / Lead Production

2 Years 5 Months
West Fraser Sawmill | 10.2019 - 03.2022
  • Oversaw production initiatives while managing electrical system operations. Coordinated electrical service calls and promoted safe maintenance practices during operational downtimes.
  • Supervised electrical installations and repairs across sawmill operations.
  • Developed and implemented preventive maintenance schedules for electrical systems.
  • Mentored junior electricians, enhancing team skills and productivity.
  • Led initiatives to enhance performance in Allen-Bradley and Mitsubishi drives by overseeing programming and operations of PLC-5, SLC 500, and ControlLogix systems with Studio 5000. Drove improvements in system functionality by effectively troubleshooting DeviceNet and ControlNet systems, enhancing performance of multiple starters.
  • Managed support for 4-20 ma instrumentation associated with actuators and valves. Mentored electricians and operators in safe troubleshooting methods and operational standards.

CW (Construction Wireman)

1 Year 5 Months
Copeland Electric | 05.2018 - 10.2019
  • Oversaw installation of rigid EMT and PVC conduit in commercial and industrial facilities. Coordinated the pulling of various MC cables to support electrical systems.
  • Collaborated with lineman crew to facilitate pole installation and enhance power distribution infrastructure.
  • Collaborated with project managers to ensure timely completion of electrical installations.
  • Installed electrical wiring systems in residential and commercial buildings.

Welder / Fabricator

1 Year
Mueller Inc. | 05.2017 - 05.2018
  • Oversaw transition to full-time role following successful temporary assignment. Specialized in MIG stick and flux-cored welding techniques. Led initiatives in industrial iron fabrication processes.
  • Oversaw forklift operations to optimize material logistics. Facilitated training sessions for new welders on industry-standard procedures and safety protocols.
  • Operated MIG and TIG welding equipment to fabricate high-quality metal components.
  • Interpreted blueprints and technical drawings to ensure precise welding specifications.

Laborer

4 Months
Industrial Roofing | 01.2017 - 05.2017
  • Executed industrial roof installation and removal tasks, prioritizing safety protocols and quality assurance measures.
  • Operated heavy machinery for roofing installation, ensuring safety and efficiency in all tasks.
  • Assisted in material handling, maintaining organized workspaces to enhance workflow productivity.

CSA / Team Lead (Lumber)

1 Year
Lowe’s Home Improvement | 01.2016 - 01.2017
  • Oversaw lumber department operations in absence of manager. Executed forklift operations for efficient material handling. Advised customers on optimal material choices and loading procedures.
  • Assisted customers with product inquiries and selections, enhancing overall shopping experience.
  • Managed inventory levels, ensuring product availability and proper stock organization.

Education

High School Diploma

Ouachita Parish High School | Monroe, LA | 01-2015

Skills

PLCs and Controls: Allen-Bradley PLC-5
SLC 500
MicroLogix
ControlLogix/Studio 5000; DeviceNet
ControlNet; basic 4-20 mA instrumentation.
Drives and Motion: Allen-Bradley and Mitsubishi VFDs; Yaskawa drives; drive installation
programming
and tuning.
Industrial Electrical/Mechanical: Motors
gearboxes
starters
controllers
rectifiers; bearings
sprockets
shafts
nip rollers
pumps; hydraulic/pneumatic valves and cylinders.
Maintenance & Production: Root-cause troubleshooting
logic updates
uptime improvement
planned shutdowns
work delegation
safety compliance.
Fabrication & Construction: MIG
stick
flux-cored welding; conduit (rigid
EMT
PVC)
cable tray; blueprint/schematic reading; forklifts
SkyTrak
manlift.
Team Leadership: Training new electricians and operators
clear communication across departments
leading production shifts.

Additional Experience

  • Reading electrical schematics and blueprints; wiring motors, start/stop circuits, breaker panels.
  • Conduit bending, cable tray installation; operation of forklifts, SkyTrak, and manlifts.

Timeline

PLC Technician

Hydro Extrusions
03.2026 - CurrentRead More

Electrician/Mechanic

Berry Global Inc.
03.2022 - 03.2026Read More

Lead Electrician / Lead Production

West Fraser Sawmill
10.2019 - 03.2022Read More

CW (Construction Wireman)

Copeland Electric
05.2018 - 10.2019Read More

Welder / Fabricator

Mueller Inc.
05.2017 - 05.2018Read More

Laborer

Industrial Roofing
01.2017 - 05.2017Read More

CSA / Team Lead (Lumber)

Lowe’s Home Improvement
01.2016 - 01.2017Read More

Ouachita Parish High School

High School Diploma
Read More
Tyler Humphries