Summary
Overview
Work History
Education
Skills
Timeline
Generic

Tyler Swedberg

Kaukauna

Summary

Precise Estimator delivers consistently insightful cost projections for projects. Resourceful analyzer utilizes various estimation techniques to verify accuracy of relevant cost factors. Tactfully relays budget inputs to team for constructing cohesive cost blueprints.

Equipped with strong problem-solving abilities, willingness to learn, and excellent communication skills. Poised to contribute to team success and achieve positive results. Ready to tackle new challenges and advance organizational objectives with dedication and enthusiasm.

Overview

22
22
years of professional experience

Work History

Masonry Estimator

Miron Construction Co. Inc.
02.2023 - Current
  • Used specialized software to create estimates quickly and accurately and make estimates easily understandable and shareable.
  • Gathered cost and material data for accurate and up-to-date information on material and labor costs.
  • Calculated labor hours accurately based on trade-specific productivity rates, leading to more realistic project timelines and work plans.
  • Participated in pre-bid meetings and site visits to understand project scope and identify potential issues or challenges.
  • Continuously improved estimating procedures by staying updated on industry trends and attending relevant training courses.
  • Prepared material orders to complete projects on time and within budget.
  • Collaborated with project managers to ensure accurate scheduling and resource allocation, improving overall project efficiency.
  • Analyzed subcontractor bids for completeness and accuracy, ensuring alignment with project requirements and budgets.
  • Identified areas for cost saving to help increase profitability and lower client costs.
  • Analyzed buildings to prepare estimates for masonry work.
  • Developed strong relationships with suppliers, negotiating favorable prices and terms to lower material costs.

Hard Bid Estimator

Miron Construction Co. Inc.
08.2021 - 02.2023
  • Used specialized software to create estimates quickly and accurately and make estimates easily understandable and shareable.
  • Gathered cost and material data for accurate and up-to-date information on material and labor costs.
  • Calculated labor hours accurately based on trade-specific productivity rates, leading to more realistic project timelines and work plans.
  • Participated in pre-bid meetings and site visits to understand project scope and identify potential issues or challenges.
  • Evaluated subcontractor bids to obtain best value for projects.
  • Prepared estimates used by management for purposes such as planning, organizing, and scheduling work.
  • Attended project meetings to provide updates and insights on project costs.
  • Provided accurate estimates by defining scope, timelines, potential setbacks, and limitations.
  • Analyzed subcontractor bids for completeness and accuracy, ensuring alignment with project requirements and budgets.
  • Reviewed project plans and specifications to understand project requirements and accurately estimate cost and resources needed.
  • Increased project accuracy by diligently reviewing specifications, drawings, and other documentation.

Installation Technician

JWC Building Specialities
02.2016 - 08.2021
  • Used hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Preformed routine maintenance on Skyfold, Modernfold, Hufcor, Smoke Guard and Renlita products.
  • Preformed installation on Skyfold, Modernfold, Hufcor, Smoke Guard and Renlita products.
  • Tested systems, noting issues and completing preventive maintenance.
  • Conducted in-depth pre-installation site surveys to anticipate challenges and plan accordingly.
  • Assisted in training new technicians, sharing best practices for efficient installations and high-quality results.
  • Participated in numerous training classes for all products before installation.
  • Followed all company and OSHA guidelines regarding safety procedures when out in the field.
  • Routinely lifted and moved items weighing up to 1,000 pounds.

Flatwork Concrete Leadman

Keller Inc.
08.2003 - 02.2016
  • Set wood and other forming materials to prepare for concrete pours.
  • Participated in concrete pouring and finishing, expertly managing application of sealers and curing compounds.
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Utilized wheelbarrows, shovels and other tools to move, spread and level concrete.
  • Completed various concrete finishing tasks including screeding, edging, and floating for high-quality results.
  • Operated heavy machinery such as skid steers, laser screeds, troweling machines, and power tools to expedite the concrete pouring process.
  • Assisted with installation of steel and anchor bolts to reinforce concrete.
  • Safely operated concrete-cutting and finishing drills, power saws and trowels to complete assigned tasks.
  • Delivered high-quality concrete workmanship by consistently adhering to blueprints and specifications.
  • Ordered materials and scheduled cement trucks.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Inspected equipment and tools used for safe operation.

Education

High School Diploma -

Kaukauna High School
Kaukauna, WI
05-2003

Skills

  • Cost estimation
  • Material takeoffs
  • Estimating software
  • Project estimation and bidding
  • Bid preparation
  • Vendor relationships
  • Teamwork and collaboration
  • Time management
  • Problem-solving abilities
  • Multitasking
  • Reliability
  • Self motivation
  • Blueprint reading

Timeline

Masonry Estimator

Miron Construction Co. Inc.
02.2023 - Current

Hard Bid Estimator

Miron Construction Co. Inc.
08.2021 - 02.2023

Installation Technician

JWC Building Specialities
02.2016 - 08.2021

Flatwork Concrete Leadman

Keller Inc.
08.2003 - 02.2016

High School Diploma -

Kaukauna High School
Tyler Swedberg