Summary
Overview
Work History
Education
Skills
Timeline
AdministrativeAssistant

Van Autrey

Aurora,CO

Summary

Adept at swiftly adapting to varied skilled labor tasks, I enhanced job efficiency and safety at Hydro Dynamic Systems. My expertise in trench safety and proactive communication with inspectors significantly contributed to project success. Skilled in both power tool operation and team coordination, I consistently ensured timely project completions without compromising on quality.

Overview

3
3
years of professional experience

Work History

Skilled Laborer

Hydro Dynamic Systems
09.2024 - Current
  • Demonstrated versatility in adapting quickly between different types of skilled labor tasks depending on project requirements.
  • Operated power equipment to move materials and promote job efficiency.
  • Used problem-solving skills to troubleshoot unexpected issues during construction projects while minimizing delays or additional costs involved in resolving them.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Installation of rebar for forming concrete
  • Wood forms
  • Plumbing installation for pumps

Pipe Layer

T. Lowell Construction
01.2022 - 04.2024
  • Assembled and installed underground pipe, fittings, and valves of various sizes.
  • Used hand signals to direct equipment operators and alert to hazards.
  • Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.
  • Skidsteer operator
  • Front end loader operator
  • Manhole installation

Education

Air Academy Highschool
Colorado Springs, CO

Skills

  • Worksite preparation
  • Trench safety
  • Power and hand tools
  • Traffic control
  • Communicating with inspectors and site supervisors for timely completion
  • Coordinating with other trade companies to ensure smoother operations to meet deadlines

Timeline

Skilled Laborer

Hydro Dynamic Systems
09.2024 - Current

Pipe Layer

T. Lowell Construction
01.2022 - 04.2024

Air Academy Highschool
Van Autrey