Results oriented engineer with 19 years of operations, quality and engineering management experience seeking a role as a Continuous Improvement Leader. Demonstrates the ability to enhance the management of internal and external engineering project milestones, as well as develop and implement continuous improvement solutions that ensure organizational growth and production. Exceptional skills in organizing, documentation, planning, and business support. Analyzes fiscal needs and goals, streamlines existing operations, identifies unprofitable systems, implements new concepts and follows through with development direction and execution.
Overview
19
19
years of professional experience
Work History
Senior Project Manager
Flowserve
Durham, North Carolina
02.2023 - Current
Conducted post-project evaluations in order to assess effectiveness of strategies employed.
Developed comprehensive project plans to be shared with stakeholders.
Managed project scope, timeline and budget in alignment with company objectives.
Completed thorough risk assessments and deployed management and response strategies to prevent roadblocks.
Implemented change management processes when issues arose to keep project moving forward and adjust to shifted priorities.
Ensured compliance with relevant regulations during all stages of a project's lifecycle.
Evaluated performance metrics for ongoing projects in order to assess progress towards goals.
Kept project teams on-task with proactive control of budgets, schedules and scopes.
Liaised between senior management, project team members and clients to ensure effective communication throughout the duration of the project.
Senior Industrial Engineer II
Gulfstream Aerospace
Tulsa, Oklahoma
01.2020 - 02.2023
Manage production tool calibration for Gulfstream G500/G600 production
Audit production assembly areas to ensure the correct tools are provided for the process
Create purchase requisitions to initiate the purchasing process for assembly and bond departments
Provide IE updates during daily production stand-ups that are associated with requests from the production floor
Maintain Industrial Engineering share point file to allow visibility of Gulfstream project/production requests.
Created and implemented cost-tracking, resulting in $75,000.00 annual savings.
Senior Manufacturing Engineer
Nortek Global HVAC
Oklahoma City, Oklahoma
01.2017 - 01.2020
Tool Control - Organized tooling for each machine asset based on OEM recommendations
Integrated visual management to know what tools were
Created tool inspection program to prevent scrap caused by defecting tooling
Total Productive Maintenance - Created a method to identify what preventative maintenance was needed on each machine, beyond what was recommended by OEM
Worked with Quality Management for verification and validation of tools to increase uptime and reduce downtime
Time Study for Material Saving - Used throughput for bagging process (faster) and wrapping process (slower)
Conducted a time study on physical units to identify best process for facility
Based off of time study, bagging process was found to be more efficient
Material cost was slightly higher, but less direct cost associated with process - less people associated with process
Wrapping process material was cheaper but took twice the amount of time and twice the amount of manpower
Developed and designed a pull system within the fabrication shop improving on time delivery by 40%
Designed capital equipment layout of new coil shop with the goal of improving delivery efficiency by 60% while focusing on mechanical, electrical layout, material movement, SOP’s, FPY and safety
Responsible for managing all CAPEX and Continuous Improvement projects within the plant with the focus of eliminating cost overrun and delivering under budget
Directed the integration of the new MRP/ERP system – (Syteline) aligning manufacturing, operations, engineering and external suppliers to improve facility throughput and efficiency
Facilitate and direct weekly plant performance metric reviews at the executive board level driving continuous improvement, safety, cost, quality, sales and engineering directives that affect the P&L
Point of contact for NPI utilizing DFMEA’s and PFMEA’s to ensure continuous improvement of (Man, Method, Material, Machine and Process)
Led maintenance MTS team to ensure preventative maintenance goals were met along with existing building structural/electrical standards.
Senior Design Project Manager
General Plastics & Composites
Houston, Texas
01.2015 - 01.2017
Functioned as lead designer to manage project design, (P&L), customer technical updates and project goal to completion evaluations with executive level management
Developed financial metrics to ensure department structure and deliverables aligned to all entities directly related to supplier, quality, delivery and customer value
Managed project improvement deliverables which provided internal and external lead-time transparency that improved manufacturing, design and inspection methods improving OTD from 75% to 95% YTD.
Senior Continuous Improvement Engineer
Technetics Group
Houston, Texas
01.2014 - 01.2015
Managed the restructure of the layout and continuous improvement implementation for the PTFE resin blending room improving OTD by 65% and reduced non-value-added factors within the process
Eliminated 15 days of non-value-added time from the CNC Horizontal Mill install tracking initial and post project forecasting saving $30,000 due to initial project cost overrun
Restructured the internal Quality Management System for facility to adhere to required ISO standards directly affecting engineering, quality and internal/external value stream stakeholders
Created a continuous preventative maintenance plans for the machine and mold shop including all assets improving uptime by 40% that directly improved on-time delivery by 60% from April 2014
Served as project manager for the Houston facility overseeing a seven-million-dollar budget engaging operating cost reduction, vendor/supplier selection, manufacturing process improvements and design/quality engineering accountability to align tasks ensuring successful goal completion
Designed resin and extrusion delivery system preventing internal shearing and contamination during wet and dry mixing of the PTFE product improving FPY by 40%.
Manufacturing Operations / Supplier Quality
Ingersoll Rand
Southern Pines, North Carolina
01.2012 - 01.2014
Developed and managed all quality solutions via the implementation of supplier and customer driven metrics for the machining area that resulted in a 40% reduction in cost of inadequate quality
Supported the restructure of the current ISO policies and procedures in a leadership role that resulted in the growth for the assembly and testing area meeting all requirements of the audit
Drove internal and external machining/processes-(CNC milling, drilling, turning and precision grinding) improvement projects to develop suppliers and direct quality technician reports while reducing non-value-added inspection/machining steps that provided a 65% reduction in overall lead time and led to capturing $25,000 in savings that have a direct effect on the delivery schedule committed to the customer
Functioned as Lead Engineer for all castings, plating and heat-treatment of internal and external machined product concerning the development of machining capability, schedule realignment and design for all US and international suppliers that produced a 50% reduction in process defects, improved machine uptime and restructure of daily planning/process alignment to exceed customer focused MRP requirements.
Senior Quality Assurance Engineer
Rockwell Collins
Cedar Rapids, Iowa
01.2010 - 01.2012
Implemented PFMEA’s, DMAIC, control plans and focused on root cause analysis to reduce cost of poor quality for GS programs by 35% (JSF, MIDS-J and TacNet)
Led intuitive process improvement teams at internal and external suppliers to increase first pass yield by 45% (JSF, MIDS-J)
Provided leadership for quality improvements through the usage of Red bins to eliminate process variation and reduced IPT DPMO by 20%
Facilitated engineering reviews for process and performance trials prior to releasing to production
Reduced process lead times by 1 week saving 30k in labor overhead through the usage of customer focused value-added optimization
Performed monthly product process capability audits for DCMA to ensure customer satisfaction.
Senior Manufacturing Engineer
Pratt & Whitney
East Hartford, Connecticut
01.2005 - 01.2008
Utilized Process certification to validate program capability for the F117 1st stage Commercial Vane
Investigated all associated effects of airflow for the 1st stage vane
Drove continuous improvement initiatives in the liner cell to reducing cycle time and takt time while improving upstream manufacturing issues that reduced bottlenecks in the process
Reduced supplier quality issues and improved cell output by identifying root causes and implementing corrective actions that reduced scrap within the cell
Identified critical internal and external machine interface issues along with correcting the design of components on the stud welder that increased valued added production time by 80%
Assisted with the redesign of the CD Hinge welding fixture to reduce and eventually eliminate scrap material and operator ergonomic related injuries
Served as a lead engineer for the 2D marking machine to program
Ensured tooling adequacy and created an efficient training program for the liner cell
Led Kaizen event in the commercial blades area to implement standard work, update specific features on blueprints and introduced new ergonomic features on tools to reduce ergonomic related injuries by 90%
Performed as lead laser drill manufacturing engineer for the F100 Military blades business unit
Developed process flow maps for all operations that affected final airflow
Conducted weekly FMEA meetings to gain a better understanding of all operations that will eventually affect the control plans
Facilitated and evaluated Gage R&R studies that created a better understanding of operator variation during in-process and final airflow tests
Prepared Cpk’s for all air flow readings to ensure that they meet the standard of 1.33 Cpk
Conducted airflow tests for in-process and final airflow to reduce the chance of parts that are being scraped which will eventually reduce all costs that are associated with the airflow process
Implemented process control plans to ensure that all processes within the cell were controlled to maintain consistency, functionality and quality
Created systematic inspection programs for military and commercial
(Blades & Vanes)
Worked as Project leader for the development and acquisition of capital equipment by managing costs and associated inventory control variables for the blade area
Maintained official work instructions that worked as an integral link between the operators and engineers
Created CNC programming for the coating area to ensure parts were coated to correlate with blueprint requirements
Reinforced the initiative for the self-assessment EH&S team for the coating area
Served in a leadership capacity for identifying and developing coater suppliers with the potential to outsource if required.
Education
MBA - Finance
Southeastern Oklahoma State University
06.2023
Bachelor of Science - Manufacturing Systems Engineering
North Carolina A & T State University
05.2005
Lean Manufacturing Certification Program -
University of Michigan
Skills
Certified Six Sigma Black Belt
Continuous Improvement Implementation
Lean Methodologies DMAIC
Project Management
Kaizen Events
Line Balancing
Plant Optimization
ASQ-Quality Assurance Certificate
ASME Y145 Geometric Dimensioning & Tolerancing
Kennametal Applications Engineering
Machine Tool Familiarization
PW4000, PW2000, F117, F135 Engine Familiarization Training
ACE LEAN 201
P&W Process Certification 201 (UTC Six Sigma Methodology Training)
Materials Management Training-Engine Center
MRP Planning
Rockwell Collins-Lean Electronics Certification
Lead Auditor (ISO 9001, AS9100, TS16949 Certification)
Project Development Management
SHIFT Management Training Certification
Benedict Negotiating Seminars Certificate
FEED (Front End Engineering Design) (FATs) Factory Acceptance Test
Welding Inspection
Change Control Management
Project Risk & Scope
System Solution Architectures
Process & Product Design
NPI (New Product Introduction)
Cost Control
Client Liaison
Timeline
Senior Project Manager
Flowserve
02.2023 - Current
Senior Industrial Engineer II
Gulfstream Aerospace
01.2020 - 02.2023
Senior Manufacturing Engineer
Nortek Global HVAC
01.2017 - 01.2020
Senior Design Project Manager
General Plastics & Composites
01.2015 - 01.2017
Senior Continuous Improvement Engineer
Technetics Group
01.2014 - 01.2015
Manufacturing Operations / Supplier Quality
Ingersoll Rand
01.2012 - 01.2014
Senior Quality Assurance Engineer
Rockwell Collins
01.2010 - 01.2012
Senior Manufacturing Engineer
Pratt & Whitney
01.2005 - 01.2008
MBA - Finance
Southeastern Oklahoma State University
Bachelor of Science - Manufacturing Systems Engineering