Multifaceted, methodical, and solution-oriented professional; equipped with strong analytical and technical expertise, honed from an extensive military background. Equipped with in-depth knowledge concerning quality control analysis to ensure seamless operations and achievement of organization-set goals and objectives. A product driven, strategic planner; effective at ensuring personnel and equipment safety, driving continuous process improvement, and the desired end-state.
Projects:
- Plumber's Union Parking Garage
1371 W. Randolph, Chicago, IL 60607
General Contractor: W.E. O'Neil
Subcontractor: Hill Fire
Project Type: Design-Build
Role: Lead Designer
- Multi-Story Family Towers
150 N. Ashland Ave., Chicago, IL 60607
General Contractor: Power Construction
Subcontractor: Hill Fire
Project Type: Design-Build
Role: Design
- BMO Tower
320 S. Canal St., Chicago, IL 60606
General Contractor: Pepper Construction
Subcontractor: Hill Fire
Project Type: 7-Story Renovation
Role: Design
- Delta Chicago Sky Club, Terminal 5 (T-5)
10000 W. Balmoral Ave., Chicago, IL 60666
General Contractor: Holder Construction
Subcontractor: Hill Fire
Project Type: Full-Renovation
Role: Design
- Beacon Health Memorial Hospital
615 N. Michigan St., South Bend, 46601
General Contractor: The Walsh Group
Project Type: Renovation / New Bed Tower/ 10-Story Addition
Role: Project Estimating (Div. 9-14)
- CTA: Red-Purple Line Modernization (Heavy-Civil/Transportation)
LBMM, Chicago, IL
General Contractor: Walsh-Fluor Design Build Team
Project Type: Design-Build
Role: MEP Engineer (Stations)