
Dynamic Project Coordinator with a proven track record at POULOMI E STATES Pvt.Ltd, adept at creating 3D BIM models and enhancing team collaboration. Skilled in Autodesk Revit and strong communication, I successfully reduced rework by 10% through effective design reviews and documentation management.
Best Practices in CM | University of Houston, Houston, TX Aug 2025 - Dec 2025
Front-End Planning (FEP) Implementation – Offshore EPCC Project
• Designed and implemented a CII-aligned Front-End Planning (FEP) framework for a $750M offshore EPCC project,
improving scope clarity and execution readiness.
• Strengthened project cost control, achieving a 10–15% reduction in cost overruns through disciplined front-end planning
practices and enhanced cost predictability.
• Improved project schedule predictability by 15–20% by applying FEP principles, optimizing project timelines, and reducing
schedule delays.
BIM Applications for CM – Mixed Use Facility | Group Project, University of Houston, TX Jan 2025 - Apr 2025
BIM Phase 3 – UH Technology Annex Replacement
• Developed integrated 2D, 3D, and 4D BIM models using Autodesk Revit and Navisworks for a 149,500 sq. ft. mixed-use
facility, delivering clash detection reports.
• Leveraged time-linked construction sequencing with Primavera P6, using critical path simulations to optimize project
scheduling and achieve a 15% reduction in potential delays.
• Streamlined collaboration and centralized document management using Autodesk Construction Cloud, enabling virtual teams
and improving information access speed by 25%.
• Conducted clash detection and coordination reviews of structural and MEP systems using Navisworks, resolving 75 clashes to
enhance trade integration.
• Proposed design alternatives and value engineering suggestions, resulting in 8% cost savings while improving constructability
and enhancing building performance.