Professional automation specialist with substantial experience in designing, programming, and maintaining PLC systems. Strong focus on team collaboration and delivering high-quality results. Reliable and adaptable with expertise in troubleshooting, system integration, and process optimization. Known for analytical thinking, problem-solving skills, and ability to meet dynamic project requirements.
Work History
Mechanic
1 Month
Atlas Energy Solutions | 10.2026 - Current
Replaced faulty parts using hand tools, diagnostic equipment, and shop repair procedures
Inspected conveyor systems, identifying worn components, misalignment, and safety hazards before failures occurred.
Repaired motors, belts, rollers, bearings, and gearboxes to restore reliable material flow.
Adjusted tracking, tension, and alignment settings to prevent jams and reduce downtime.
Manufacturing Technician III
5 Months
Fox Packaging | 05.2026 - 10.2026
Troubleshot equipment issues, minimizing downtime and keeping production on track to meet deadlines.
Increased overall productivity by training new technicians and providing ongoing support to team members.
Coordinated with engineering teams to test prototype models, ensuring specifications were met with precision.
Optimized existing automation frameworks for better test coverage and reduced maintenance time.
Contributed to sustainability goals by implementing energy-efficient automation technologies.
PLC Programmer and Maintenance Lead.
2 Years 2 Months
REGAL REXNORD | 03.2024 - 05.2026
Managed resources for effective development and implementation of projects that addressed critical issues.
Designed and implemented security systems to enhance safety for associates.
Programmed PLC logic for automated equipment using ladder logic and structured troubleshooting methods.
Diagnosed control system faults on production machinery, restoring uptime and operational consistency.
Developed HMI screens and machine interfaces to improve operator visibility and control.
Maintenance And Warehouse Supervisor.
9 Months
VITAL WATER SYSTEMS | 06.2023 - 03.2024
Supervised and scheduled maintenance for associate's machines to ensure operational readiness.
Analyzed sales data to create maintenance and installation plans, coordinating scheduling and purchasing of spare parts from foreign suppliers.
Supervised daily warehouse operations to maintain safe, organized workflow.
Coordinated receiving, storage, and outbound shipment activities.
Trained team members on inventory procedures and equipment use.
I&E Technician.
1 Year 5 Months
BARTLETT GROUP | 09.2021 - 02.2023
Evaluated, upgraded, and repaired control systems for monitoring gases and hydrocarbons, enhancing safety and compliance in oil industry operations.
Diagnosed instrumentation and electrical faults to restore equipment reliability and minimize downtime.
Calibrated transmitters, pressure gauges, and control devices to maintain accurate process readings.
Performed preventive maintenance on motors, panels, wiring, and field instruments.
NPI Engineer.
2 Years 5 Months
COMMSCOPE | 03.2019 - 08.2021
Development and programming of verification systems, introduction and transfer of new products. Cost reductions and variances.
Leader in the implementation of projects from the test equipment department. Conducted PFMEA and DFMEA analysis to identify potential failure modes and assess risks in product designs.
Coordinated new product introduction activities across engineering, manufacturing, quality, and supply chain teams.
Reviewed BOMs, routings, and process documentation to support accurate launch readiness.
Validated pilot builds and resolved production issues before full-scale release.
Process Technician III.
3 Years 1 Month
CORNING | 02.2016 - 03.2019
Improved first pass yield by implementing quality control measures. Lay out changes, distribution and balancing of production lines. Pseudo & Bom improvement.
Monitored production equipment and adjusted process parameters to maintain product quality. 2. Performed routine inspections and documented results in manufacturing records. 3. Troubleshot process deviations and supported corrective actions with engineering teams. 4. Followed standard operating procedures to ensure safety and regulatory compliance. 5. Prepared materials, tools, and workstations for efficient shift handoffs. 6. Assisted with preventive maintenance tasks to reduce equipment downtime. 7. Verified product specifications using measurement tools and quality checks. 8. Recorded process data accurately to support continuous improvement efforts.
Trained new technicians in proper usage of equipment, safety protocols, and company procedures, ensuring a high level of competence across the team.
Supported an environment of safety through thorough knowledge of regulations, best practices, and consistent communication with team members regarding safe work habits.
Education
Bachelor’s degree - Mechatronics Engineer
Universidad Tecnológica De Tamaulipas Norte | Tamps., Mx. | 01-2021
Associate’s degree - Mechatronics Technician
Universidad Tecnológica De Tamaulipas Norte | Tamps., Mx. | 01-2016
Skills
PLC programming
PLC hardware selection
CAD Software Operation
Critical thinking
Electrical design documentation
Electrical system diagnostics
CAD software utilization
Accomplishments
Development of maintenance plans for industrial water purification equipment. (RGV) VITAL WATER SYSTEMS 2024
Reduced 8% of scrap per visual stations. COMMSCOPE 2020.
Reductions of manufacturing variances. 120K per year. CORNING 2018.
Certification
Project Managment. Colorado University B Expected Completion: December 2026