Summary
Overview
Work History
Education
Skills
Timeline
Generic

VICTOR SANCHEZ

San Carlos,CA

Summary

Quality-focused facility maintenance Carpenter committed to creating an upbeat work environment. Timely and efficient working style takes difficult jobs through to completion within budget. Experienced in both residential and commercial construction. Home construction, remodels and renovations. Successful at providing clients with both technical skill and creative options. I have learned to utilize advanced skills to perform complex preventive maintenance and corrective repair of buildings, industrial systems, vehicles, and equipment. Perform task, and work orders under limited supervision, Utilized several trades skills such as Carpentry, plumbing, electrical, painting, roofing, heating, cooling, and welding to complete daily task. Respond quickly to emergency situations.

Overview

19
19
years of professional experience
2
2
Language

Work History

Carpenter

Kaiser Foundation Hospital
Oakland, CA
11.2014 - 02.2024
  • Safely operated electric cordless, hammer drills, and shop tool
  • Valid CA driver's license
  • Work Crew Coordination
  • Fabricate, Install, and Assemble
  • Follow Direction and Instructions
  • Door and Hardware Installation
  • Reduced material waste by precisely measuring, cutting, and assembling lumber for various construction projects
  • Collaborated with other skilled tradespeople to ensure seamless integration for construction projects
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings
  • Assisted in training to demonstrate techniques, apply best practices and comply with protocols and regulations
  • Assisting Subs and Sub Supervision
  • HVAC Fabrication, and Installation
  • Operated forklifts and other heavy equipment
  • Planned projects by identifying necessary equipment, tools, and required assistance
  • Used critical thinking to break down problems, evaluate solutions and make decisions
  • Demonstrated strong organizational and time management skills
  • Exercised leadership capabilities by successfully motivating and inspiring others
  • Developed and maintained courteous and effective working relationships
  • Skilled at working independently and collaboratively in team environment
  • Demonstrated creativity and resourcefulness through development of innovative solutions
  • Worked well in team setting, providing support and guidance
  • Used strong analytical and problem-solving skills to develop effective solutions for challenging situations
  • Strengthened communication skills through regular interactions with others
  • Demonstrated respect, friendliness, and willingness to help wherever needed
  • Applied effective time management techniques to meet tight deadlines
  • Delivered exceptional customer service by addressing client concerns promptly and professionally while keeping them informed of project progress
  • Assisted team members to improve their technical skills and enhance overall team performance in completing various tasks
  • Completed installations of building structures, trim, flooring, and cabinetry
  • Managed inventory of tools, supplies, and equipment.

Foremen Engineer

Diaz HVAC And General
Santa Rosa, CA
04.2005 - 06.2014
  • Established positive working environment fostering teamwork and open communication among crew members
  • Sourced suppliers and purchased necessary materials for work
  • Prepared and submitted reports on job progress and safety conditions to upper management
  • Managed subcontractors effectively to ensure timely delivery of materials and services without compromising quality
  • Oversaw schedules and assignments for 6 personnel
  • Supervised Rip out, Fabrication, and installation of HVAC ducting
  • Components R valves air handlers louvers on Cost Guard Ships
  • Government Contracts
  • Inspected work performed by crews to check completion of job specifications
  • Assessed project size to prepare work and determine resources needed to complete jobs
  • Streamlined communication between architects, engineers, and construction teams for seamless project execution
  • Supported construction and extraction workers to facilitate timely completion of projects
  • Directed projects according to schedule and quality demands
  • Trained workers in proper methods, equipment operation, and safety procedures
  • Assisted in estimating project costs accurately
  • Inspected equipment and tools used for safe operation
  • Implemented safety protocols to reduce risks on construction sites
  • Monitored job progress and performance of employees or contractors to complete projects before deadlines
  • Completed projects on time and within budget through effective resources and scheduling
  • Observed all OSHA and corporate safety regulations and procedures to prevent mishaps and injuries on job sites
  • Increased project efficiency by delegating tasks and supervising
  • Maintained contact with lumber companies and hardware dealers for material pricing
  • Developed and maintained courteous and effective working relationships
  • Demonstrated leadership skills on all Projects
  • Paid attention to detail while completing assignments
  • Provided professional services and support in a dynamic work environment
  • Assisted with day-to-day operations, working efficiently and productively with all team members
  • Demonstrated strong organizational and time management skills
  • Proven ability to learn quickly and adapt to new situations
  • Proved successful time management working within tight deadlines.

Education

Continuation - Engineering (Pre-Engineering

Foothill College
05.2025

undefined

Cal Carpenters Training
02.2018

Skills

  • Insight Talented Carpenter offering 18 years of
  • Experience in general
  • Construction environments
  • Residential Plumbing and Electrical Experience
  • Well-organized planner with good multitasking and
  • Time management skills Knowledgeable about both
  • Rough and finish carpentry techniques Successful at
  • Managing supplies and site crews to lead safe and
  • Efficient projects Perform detail-oriented and precise
  • Carpentry work with every job Focused on
  • Outperforming customer expectations while
  • Accomplishing budget and timeline demands Direct
  • Work of assistants while teaching common and
  • Advanced carpentry abilities
  • Bilingual Carpenter focused on completing
  • Construction projects on time or ahead of schedule
  • Detail-oriented team player with strong organizational
  • Skills Ability to handle multiple projects
  • Simultaneously with a high degree of accuracy To seek
  • And maintain full-time position that offers professional
  • Challenges utilizing interpersonal skills, excellent time
  • Management and problem-solving skills
  • Blueprint Reading
  • Drywall hanging and repair
  • Facilities Maintenance
  • Power Tool Maintenance and Care
  • Safe Practices and
  • Pre-task planning
  • Rigging Equipment
  • Material Estimation
  • Metal Stud and Wood Framing
  • Commercial
  • Construction experience
  • Crew Management
  • Problem-Solving
  • Roofing experience
  • Scaffolding construction
  • Shop Tools Operation
  • Residential and
  • Commercial Renovations

Timeline

Carpenter

Kaiser Foundation Hospital
11.2014 - 02.2024

Foremen Engineer

Diaz HVAC And General
04.2005 - 06.2014

Continuation - Engineering (Pre-Engineering

Foothill College

undefined

Cal Carpenters Training
VICTOR SANCHEZ