Assistant Painter
F&V paint
Stoughton , Massachusetts
09.2020 - Current
- Prepared surfaces for painting by washing, scraping, sanding and patching holes or cracks.
- Applied primers, sealers and other preparatory coatings on walls, ceilings, doors and trim.
- Applied paint with brushes, rollers or spray guns in a neat manner while following safety protocols.
- Cleaned up job site after each day of work including disposing of unused materials properly.
- Protected furniture, floors and carpets from spills using drop cloths during the painting process.