Summary
Overview
Work History
Education
Skills
Timeline
Generic

Vincent Castoreno

Pearland,TX

Summary

Project management professional with track record of delivering high-impact projects in diverse environments. Adept at driving project timelines and ensuring quality outcomes through strategic planning and execution. Highly collaborative, adaptable, and committed to team success and client satisfaction.


Reliable foreman with more than five years of experience leading manual work on construction sites. Superb project oversight, team management and blueprint interpretation skills. Bilingual and effective in meeting tight job deadlines.

Overview

20
20
years of professional experience

Work History

Project Manager & Estimator

Gurry Mechanical, L.P.
01.2022 - Current
  • Implement new estimating software within estimating department (Fast Duct/Fast Pipe).
  • Estimate HVAC Duct and Piping jobs according to plans and specifications.
  • Keep track of market pricing and adjust material costs accordingly.
  • Order mechanical equipment including AHUs, RTUs, MAUs, FPTUs, FCUs, Chillers, Boilers, Pumps, and all specialties pertaining to equipment.
  • Led cross-functional teams to execute project plans and achieve strategic objectives.
  • Developed and maintained project schedules using advanced project management software.
  • Facilitated meetings to align expectations and drive project progress.
  • Implemented risk management strategies to mitigate potential project delays effectively.

Steam/Insulation Foreman

SLIS - CCSI
06.2016 - 12.2021

Find steam leaks, damaged tubing, valves, piping, steam traps, steam manifolds.

Repair the leak, tubing, or valve, and

te-insulate the line. As a Foreman I am responsible for my crew. I fill pull permits daily for multiple jobs, fill out all necessary paperwork (JSA’s, STA’s, Elevated work, JLG and Scissor Lift safety checklist), and order material.

  • Complied with federal and company regulations to maintain high level of safety at all job sites.
  • Delegated duties to each employee based upon his or her skills set and monitored progress daily.
  • Reported to supervisors, planners, and plant operations each day with project updates and estimated completion dates, noting any delaying issues.
  • Maintained high standards of safety, productivity and quality for every job.
  • Supported budget and project goals by keeping balanced inventory.
  • Analyzed job sites daily to mitigate risks for workers and visitors.
  • Led worksite preparation and project planning for smoothly run jobs.
  • Implemented onsite safety protocols and procedures and properly trained all team members on prevention measures, effectively reducing injuries 100%.
  • Obtained specifications and directed work for multiple construction crews.

General Construction Worker/Machine Operator

TGCI
03.2011 - 05.2016

Excavation to find oil and water leaks.

Forming/Carpentry

Mix, pour, and finished concrete.

Fixed PVC leaks.

Spread dirt with backhoe and bobcat, also move dirt, and throw away contaminated dirt in shipping containers.

Spread asphalt, pack down with compactor, or roller.

  • Operated overhead lifts to move heavy and bulky work materials.
  • Used picks and shovels to dig, spread and level dirt and gravel.
  • Assisted project planning by using laser measuring equipment and marking paint for project element placement.
  • Reduced wasteful spending by accurately cutting materials according to specifications.
  • Prepared sites for concrete work by breaking up damaged concrete and leveling or contouring ground.
  • Coordinated communication between equipment operators via two-way radios and hand signals.
  • Maintained clean, safe working environment by removing waste from job site prior to shift completion.
  • Assisted electrical, plumbing and carpentry teams by completing basic and semi-skilled work.
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk.

Lifeguard

Bill Cole and Associates
06.2006 - 09.2010
  • Kept watch over swimmers to respond quickly to distress situations.
  • Performed basic life support, including CPR to stabilize individuals prior to ambulance arrival.
  • Monitored behaviors for safety violations and took steps to prevent further violations.
  • Alerted patrons of storm conditions and directed to exit water immediately during local severe weather situations.
  • Adhered strictly to emergency action plans.
  • Kept equipment in good working order with frequent inspections and minor repairs.
  • Observed all sections of assigned water zone of responsibility.
  • Informed patrons of unsafe or hazardous conditions and requested alternative activities.
  • Contacted emergency personnel and provided aid while waiting for further assistance.
  • Patrolled to identify anyone needing assistance and provided immediate care.
  • Updated logs detailing weather conditions, treatments provided and incident information to keep management informed of activities.

Education

Some College (No Degree) - Respiratory Therapy

San Jacinto College
Pasadena, Texas, TX

High School Diploma -

Dobie High School
Houston, TX
05.2010

Skills

  • Construction management
  • Job site management
  • Cost estimation for materials
  • Strategic job planning
  • Safety oversight
  • First Aid/CPR
  • Issue resolution
  • Computer skills
  • Active listening
  • Dependable and honest
  • Organizational skills
  • Critical thinking
  • Flexible

Timeline

Project Manager & Estimator

Gurry Mechanical, L.P.
01.2022 - Current

Steam/Insulation Foreman

SLIS - CCSI
06.2016 - 12.2021

General Construction Worker/Machine Operator

TGCI
03.2011 - 05.2016

Lifeguard

Bill Cole and Associates
06.2006 - 09.2010

High School Diploma -

Dobie High School

Some College (No Degree) - Respiratory Therapy

San Jacinto College
Vincent Castoreno