Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Vishal Kanojiya

Luton

Summary

Detail-oriented and results-driven Maintenance Engineer with 4+ years of experience in maintaining, troubleshooting, and repairing machinery and systems in the pharmaceutical industry. Skilled in preventive maintenance, root cause analysis, and system upgrades. Strong problem-solving skills and a deep understanding of GMP and pharmaceutical packaging processes. Adept at collaborating across cross-functional teams to ensure high-quality product delivery.

Overview

7
7
years of professional experience
6
6
years of post-secondary education

Work History

Maintenance Engineer

Bristol Laboratories Limited
Luton
11.2021 - Current
  • Oversee maintenance of 12+ pharmaceutical packaging production lines and 75+ equipment, ensured that products meet all regulatory and quality standards.
  • Carried out daily inspections, preventive maintenance, and breakdown maintenance to avoid production disruptions.
  • Performed root cause analysis and troubleshooting for process deviations and product quality issues, provided timely solutions to maintain production timelines.
  • Managed and oversee the installation, qualification, and commissioning of new equipment to ensure it meets all operational and regulatory requirements.
  • Assisted in creation and maintenance of SOPs, batch records, and qualification protocols, ensuring compliance with regulatory standards.
  • Monitored all maintenance activities comply with GMP and internal quality standards, maintained accurate maintenance records and documentation for regulatory audits.
  • Troubleshooted and resolved mechanical, basic electrical, hydraulic, and pneumatic issues, ensuring minimal production delays.
  • Provided training and guidance to junior maintenance staff on best practices, safety protocols, and equipment operations.
  • Managed spare part inventory and negotiation with vendors to reduce costs of parts.
  • Attended and monitored monthly Gemba walk, making sure Gemba walk is effective, and timely executed for continuous improvement.


Production Technician

LM Manufacturing Pharmaceutical
Northampton
02.2021 - 10.2025
  • Managed daily activities logbook and break down documentation.
  • Carried out complete tooling change over and set up of machines using continuous improvement approach.
  • Assisted in carrying out Calibration and Validation of equipment used in bottle filling machine.
  • Maintained and Monitored inventory of tooling change over parts.
  • Assisted and coordinated with Service Engineers and Contractors for machine installation and general building maintenance.
  • To adhere all activities considering health and safety measures.
  • Worked in various departments such as Dispensing, Manufacturing and Packaging departments to fulfil requirements of production needs.

Intern

Larsen & Toubro Power Training Institute
Vadodara, India
06.2018 - 08.2018
  • Inspected and monitored condition of bearings by using Ultrasound condition monitoring method.
  • Designed helical coil type heat exchanger in SolidWorks and performed simulation in ANSYS before manufacturing physical model.
  • Optimised shell and tube type heat exchanger by using Nano-fluid as working fluid and successfully reduced size of heat exchanger and increased thermal efficiency.
  • Assisted in implementing a predictive maintenance program using vibration analysis and infrared thermography, improving equipment reliability.

Education

Master of Science - Mechanical Engineering

University of Hertfordshire
Hatfield, United Kingdom
01.2020 - 09.2021

Bachelor of Technology - Mechanical Engineering

Charotar University of Science And Technology
Gujarat, India
04.2015 - 05.2019

Skills

  • Corrective and Preventive Action
  • LEAN manufacturing
  • Equipment Diagnostics and Troubleshooting
  • Root Cause Analysis
  • Maintenance Planning and Scheduling
  • Health & Safety Regulations
  • CMMS (Computerised Maintenance Management System)
  • Team Collaboration and Leadership
  • Equipment Installation
  • Qualification and Validation
  • GMP Regulatory Compliance
  • Solidworks
  • Ability to work under pressure
  • Critical thinking and problem solving
  • Interpersonal communication

Accomplishments

  • Captain of a Cricket Team playing in Division 4 county league in Cambridgeshire.
  • Outdoor exploration and passionate for Landscape Photography.

Timeline

Maintenance Engineer

Bristol Laboratories Limited
11.2021 - Current

Production Technician

LM Manufacturing Pharmaceutical
02.2021 - 10.2025

Master of Science - Mechanical Engineering

University of Hertfordshire
01.2020 - 09.2021

Intern

Larsen & Toubro Power Training Institute
06.2018 - 08.2018

Bachelor of Technology - Mechanical Engineering

Charotar University of Science And Technology
04.2015 - 05.2019
Vishal Kanojiya