Laborer
Iron Range Heating And Plumbing
03.2019 - 08.2019
- Measured dimensions of finished pieces for conformance to specifications.
- Used measuring tools such as gauges and tape measure to identify conforming parts during production.
- Measured, threaded and cut materials to correct angles.
- Installed valves, hangers, supports and flanges inside piping systems.
- Inspected sewers and piping systems to assess quality and condition.
- Filled pipe systems with water and air to determine location of leaks.
- Requisitioned tools and equipment to select type and size of pipes needed for projects.
- Managed job site hazards by accurately locating biohazards and chemicals.
- Complied with all state plumbing codes throughout duration of each project.
- Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.
- Inspected structures to avoid any obstruction and delays throughout project.
- Repaired plumbing systems, components and equipment.
- Implemented maintenance and repair for fixtures, water mains, fire systems, and backflow preventers.