Laborer Iron Range Heating And Plumbing
03.2019 - 08.2019
Measured dimensions of finished pieces for conformance to specifications.
Used measuring tools such as gauges and tape measure to identify conforming parts during production.
Measured, threaded and cut materials to correct angles.
Installed valves, hangers, supports and flanges inside piping systems.
Inspected sewers and piping systems to assess quality and condition.
Filled pipe systems with water and air to determine location of leaks.
Requisitioned tools and equipment to select type and size of pipes needed for projects.
Managed job site hazards by accurately locating biohazards and chemicals.
Complied with all state plumbing codes throughout duration of each project.
Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.
Inspected structures to avoid any obstruction and delays throughout project.
Repaired plumbing systems, components and equipment.
Implemented maintenance and repair for fixtures, water mains, fire systems, and backflow preventers.
Show Description