Summary
Overview
Work History
Education
Skills
Timeline
Generic

WILNER BRIFIL

SEBRING

Summary

Experienced and motivated Electrical Technician with experience in power generation at coal, natural gas, and solar plants. Devoted to keeping up-to-date with technologies, standards, and trade skills. Documented results with project management,team leadership, and electrical installation/testing.

Overview

9
9
years of professional experience

Work History

Electrical Commissioning Foreman

Overland Contracting
10.2023 - Current

Hired to install a 74.5 megawatt solar plant for FPL

Delivered Results

  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Performed voltage of circuit test as well as performing string current test. I also assisted with energizing each inverter safely.

Electrical Foreman

Overland Contracting
06.2023 - 10.2023

Hired to install a 75.5 megawatt solar plant for FPL

Delivered Results

  • Streamlined operations by managing a team of electricians, assigning tasks, and ensuring timely completion of projects.
  • Ensured safety compliance by implementing and maintaining OSHA regulations throughout all work processes.
  • Reduced downtime with prompt troubleshooting and repair of electrical systems in critical situations.

Electrical General Foreman

Moss Solar
02.2023 - 05.2023

Hired to install a 74.5 megawatt solar plant for Duke Energy

Delivered Results

  • Installed AC/DC inverters
  • Tested dc feeders, ac feeders, and PV to PV module terminations
  • Commissioned tracker motors
  • Performed startup testing and troubleshooting for combiner box termination

Electrical Technician

Technical Diagnostic Services
10.2021 - 01.2023

I was part of a team that performed startup testing and commissioning in industrial power plants throughout Florida.

Delivered Results

● Commissioned system high/medium/low voltage transformers, switchgear, and motor control centers.

.● Installed and tested PLC, DCS, and other control systems for processes throughout the power plants.

● Performed startup and technical troubleshooting for motors, pumps, and other electrical-mechanical equipment.

● Installed, tested, and calibrated instrumentation critical to the power production process.

Electrical Technician

Diagnostic Services
01.2019 - 03.2021

I was part of a team that performed startup testing and commissioning in industrial power plants throughout Florida

Delivered Results

  • Commissioned system high/medium/low voltage transformers, switchgear, and motor control centers
  • Installed and tested PLC, DCS, and other control systems for processes throughout the power plants
  • Performed startup and technical troubleshooting for motors, pumps, and other electrical-mechanical equipment
  • Installed, tested, and calibrated instrumentation critical to the power production process.

Electrical General Foreman

Overland Contracting
06.2019 - 09.2019

Hired as an electrician journeyman to install a 45 megawatt solar plant for Duke Energy

I was promoted to Electrical General Foreman a few weeks after getting on the jobsite

Delivered Results

  • Installed AC/DC inverters
  • Tested dc feeders, ac feeders, and PV to PV module terminations
  • Commissioned tracker motors
  • Performed startup testing and troubleshooting for combiner box termination.

Electrician Journeyman

Zachry Industrial
01.2018 - 01.2019

Hired to work on a 1800 megawatt power plant for FPL

(3 on 1 combined cycle)

Delivered Results

  • Installed isophase for all three units and the steam turbine
  • Installed lights around the plant
  • Assisted start up and commissioning on testing all transformers

Electrical Journeyman

Overland Contracting
05.2017 - 01.2018

Hired as an electrician journeyman to install 75 megawatt solar plant for FPL.

Delivered Results

● Commissioned all inverters

● Installed dc feeders, ac feeders, and PV to PV module terminations

● Performed startup testing and technical trouble shooting for combiner boxes and inline fuse PV terms

● Energized combiner boxes and assisted with energizing inverters

Instrument Fitter

CCC Group
01.2017 - 05.2017

Hired as Instrument Fitter to install a 52 megawatt wood chip burner

Delivered Results

  • Checked instruments for accuracy and calibrated to specifications.
  • Connected pipes through caulking, gluing and welding.
  • Thoroughly read and comprehended blueprints in order to understand how installation was to be performed.
  • Dismantled and reassembled delicate mechanisms.

Electrician Journeyman

Overland Contracting
01.2016 - 01.2017

Hired as an electrician journeyman to install 75 megawatt solar plant for FPL

Delivered Results

  • Commissioned all inverters
  • Installed dc feeders, ac feeders, and PV to PV module terminations
  • Performed startup testing and technical trouble shooting for combiner boxes and inline fuse PV terms
  • Energized combiner boxes and assisted with energizing inverters

Electrical Journeyman

Robins And Morton's
07.2015 - 01.2016

Hired as an electrical journeyman to install a 1140 megawatt power plant for Tampa Electric

Delivered Results

  • Installed temporary power
  • Installed lights around plant
  • Installed grounding
  • Connected wires to circuit breakers, transformers or other components.
  • Installed ground leads and connected power cables to equipment.

Education

High School Diploma -

Okeechobee High School
Okeechobee, FL
05.2005

Skills

  • Trouble shooting
  • Commissioning
  • leadership
  • Solar plant Technologies
  • Document management
  • safety
  • Control systems
  • instrumentation

Timeline

Electrical Commissioning Foreman

Overland Contracting
10.2023 - Current

Electrical Foreman

Overland Contracting
06.2023 - 10.2023

Electrical General Foreman

Moss Solar
02.2023 - 05.2023

Electrical Technician

Technical Diagnostic Services
10.2021 - 01.2023

Electrical General Foreman

Overland Contracting
06.2019 - 09.2019

Electrical Technician

Diagnostic Services
01.2019 - 03.2021

Electrician Journeyman

Zachry Industrial
01.2018 - 01.2019

Electrical Journeyman

Overland Contracting
05.2017 - 01.2018

Instrument Fitter

CCC Group
01.2017 - 05.2017

Electrician Journeyman

Overland Contracting
01.2016 - 01.2017

Electrical Journeyman

Robins And Morton's
07.2015 - 01.2016

High School Diploma -

Okeechobee High School
WILNER BRIFIL