Summary
Overview
Work History
Education
Skills
informatic skills
References
Languages
Timeline
Generic
Wahid Rasooly

Wahid Rasooly

Arlington,Virginia

Summary

As s dedicated Civil Engineer with 3 years of experience in managing and executing diverse civil engineering projects. Skilled in project planning, design, and construction oversight, with a focus on delivering high-quality results within budget and schedule constraints.

My professional journey has equipped me with invaluable leadership and management skills, allowing me to adeptly navigate time constraints and job pressures. I engaged in rigorous lab programs and practical sessions at Ultra design company and Herat Municipality, honing my practical skills and industry acumen.

Moreover, I possess a proficient command of computer programs, notably the MS Office suite, alongside adeptness in utilizing various technical software tools.

I am committed to leveraging my expertise to drive organizational success while continually seeking opportunities for professional advancement."

Overview

2
2
years of professional experience

Work History

CIVIL ENGINEER

HERAT MUNICIPALITY
08.2015 - 05.2016
  • I Experienced as engineer with a proven track record of managing and delivering complex projects, eager to transition into professional levels
  • I have successfully led various infrastructure development initiatives, including road construction, utility upgrades, and environmental remediation projects
  • Manage and oversee construction projects from conception to completion
  • Prepare proposals and engineering designs, plans for the construction, service delivery and related projects
  • Analyzing plans, survey reports, maps, and other data to plan and design projects.
  • Consider construction costs, government regulations, potential environmental hazards, and other factors during the planning and risk-analysis stages of a project.
  • Ensuring the projects adheres to national and international engineering codes of conduct and regulations.
  • Oversee and analyze the results of soil testing to determine the adequacy and strength of foundations.

LABORATORY TECHNICIAN

ULTRA DESIGN AND RESEARCH COMPANY
04.2015 - 08.2015
  • QA/QC implementation as specified in the plans
  • Material tests on aggregates, soil, concrete, and asphalt
  • Responsible for the supervision of field quality control activities
  • Coordinated with the laboratory manager, in calibration equipment
  • Maintained and calibrated laboratory equipment to ensure accuracy and functionality in challenging environments.
  • Prepared materials, solutions, and samples, considering local constraints and availability.
  • Conducted experiments, collected data, and performed analysis using available resources.
  • Implemented quality control measures, adapting protocols to local conditions while ensuring reliability.
  • Prioritized safety, adhering to stringent protocols and adapting practices to local requirements.
  • Resolved technical issues and equipment malfunctions, leveraging available resources and ingenuity.
  • Documented procedures and results comprehensively, considering local communication norms and practices.
  • Facilitated collaboration within diverse teams, bridging language and cultural differences.
  • Managed resources effectively, optimizing utilization to meet project timelines and goals.
  • Contributed to continuous improvement efforts, incorporating local insights and feedback.

OPERATIONAL MANAGER

QUEST CONSTRACTION COMPANY
05.2016 - 06.2017
  • Estimation of cost parameters and purchase budgets
  • Maintenance of records of equipment purchases, prices, and supplies
  • Coordinated with clients, subcontractors, suppliers, and other stakeholders to ensure seamless project execution and customer satisfaction.
  • Supported financial operations by assisting with budget preparation, monitoring expenses, and analyzing variances.
  • Prepared financial reports, including balance sheets, income statements, and cash flow statements, to provide insights into the company's financial performance.
  • Assisted with accounts payable and receivable processes, including invoice processing, payment verification, and reconciliation.
  • Conducted financial analysis to identify trends, patterns, and areas for improvement, contributing to informed decision-making.
  • Assisted with the preparation of financial forecasts and projections to support strategic planning initiatives.

Education

Bachelor of Science - Civil Engineering

Herat University
Herat
02.2016

Skills

  • Leadership and Management
  • designed questionnaires, conducted baseline surveys
  • report writing Leaded and managed program activities
  • communicated and coordinated efforts in achieving objectives
  • Thinking critically, analyze meticulously
  • Problem-Solving
  • Technical Proficiency (CAD, Programming, etc)
  • Design and Creativity
  • Project Management
  • Communication
  • Continuous Learning
  • Ethical and Professional Responsibility

informatic skills

  • AutoCAD
  • Civil 3D
  • Primavera P6
  • MS Office

References

  • Jawad Noori, Director Monitoring and Evaluation at Partners Global, Jawadd.noori@gmail.com, 443 962 7597
  • Farzad Rahimi, Assistant Project Manager at CES, Farzad.rahimi@yahoo.com, 703-341-9507

Languages

English
Full Professional
Spanish
Professional Working
Persian
Native or Bilingual
Catalan
Elementary

Timeline

OPERATIONAL MANAGER

QUEST CONSTRACTION COMPANY
05.2016 - 06.2017

CIVIL ENGINEER

HERAT MUNICIPALITY
08.2015 - 05.2016

LABORATORY TECHNICIAN

ULTRA DESIGN AND RESEARCH COMPANY
04.2015 - 08.2015

Bachelor of Science - Civil Engineering

Herat University
Wahid Rasooly