Summary
Overview
Work History
Education
Skills
Languages
Work Preference
Timeline
Generic

Walter Maldonado

construction and restoration superintendent
Raleigh,NC

Summary

Results-driven construction management professional with proven expertise in team leadership and collaboration. Focused on improving project efficiency through strategic planning and strict adherence to safety protocols. Demonstrated ability to deliver projects on time and within budget, ensuring high-quality outcomes.

Overview

31
31
years of professional experience

Work History

Project Superintendent

BCG concrete
Garner, North Carolina
07.2025 - 01.2026
  • Directed and trained workers to enhance team capabilities and skillsets.
  • Supervised on-site workers to maintain quality and safety standards.
  • Coordinated daily project activities for timely task completion.
  • Communicated with subcontractors to align goals and schedules.
  • Managed materials inventory to support ongoing construction needs.
  • Conducted site inspections ensuring compliance with regulations and plans.
  • Assisted in preparing project documentation and progress reports.
  • Implemented safety protocols, minimizing on-site risks and accidents.

Project Superintendent

donleys concrete group
Apex, North Carolina
07.2015 - 07.2025

Coordinated daily project activities to ensure timely completion of tasks.

  • Supervised on-site workers, enforcing quality and safety standards throughout projects.
  • Communicated with subcontractors to align project objectives and schedules.
  • Instructed workers on surveying equipment usage to enhance measurement accuracy.
  • Implemented process improvements to streamline workflow efficiency across projects.
  • Maintained detailed records of construction progress, reporting discrepancies to project manager.
  • Developed comprehensive project plans detailing scope, budget estimates, timelines, and milestones.
  • Conducted pre-job site visits to assess potential risks and hazards for each assignment.

Concrete/Restoration Superintendent

Blair Duron Restoration
Raleigh, North Carolina
02.2009 - 06.2015
  • Coordinated staff schedules and allocated resources effectively.
  • Oversaw maintenance of equipment and facilities to ensure optimal performance.
  • Collaborated with teams to enhance workflow and improve service delivery.
  • Developed standard operating procedures for improved efficiency across the site.
  • Maintained accurate project records including daily logs, time sheets, and inspection reports to support operational transparency.
  • Oversaw employee productivity to enforce efficient use of materials and equipment.
  • Supervised staff including subcontractors and laborers on assigned projects.
  • Planned, managed and coordinated construction activities to ensure timely completion of projects.
  • Managed projects by coordinating materials, inspections and contractor tasks.
  • Coordinated installation activities for projects to promote smooth workflow and achieve quality standards.
  • Adhered strictly to company policies and procedures while overseeing operations at the site.
  • Inspected construction sites regularly to detect potential safety hazards and ensure compliance with safety protocols.
  • Monitored work progress to ensure compliance with building codes, safety regulations and quality standards.
  • Established procedures for completing projects within specified budgets and timelines.
  • Enforced quality standards through daily construction site inspections to ensure compliance with project specifications.
  • Prepared and presented verbal and written reports to provide recommendations to project team.
  • Oversaw construction process to ensure adherence to quality standards and effective cost control throughout project lifecycle.
  • Oversaw daily work of team using knowledge of local and national building codes for construction areas.
  • Met and worked with internal teams to recognize and discuss current and future needs.

Concrete Manager/Construction Superintendent

Wm concrete LLC
Raleigh, North Carolina
02.2009 - 02.2013
  • Managed budgets and allocated resources for departmental projects.
  • Implemented procedures to streamline workflows and boost productivity.
  • Coordinated cross-departmental collaboration for alignment and resource sharing.
  • Facilitated team meetings to align on project updates and identify operational efficiencies.
  • Resolved conflicts among team members to foster a harmonious workplace culture.
  • Developed training programs to enhance employee skills and knowledge.
  • Trained employees on additional roles to ensure coverage and flexibility.
  • Enforced customer service standards while promptly resolving issues.

Concrete Superintendent

Blair Concrete Services
Raleigh, NC
01.2002 - 01.2009
  • Supervised concrete placement and finishing activities on multiple construction sites.
  • Coordinated project schedules with subcontractors and suppliers for timely material deliveries.
  • Monitored compliance with safety regulations and ensured proper equipment usage.
  • Conducted quality control inspections to uphold high standards in concrete work.
  • Trained and mentored crew members on best practices and safety protocols.
  • Managed inventory of materials, tools, and equipment for operational efficiency.
  • Communicated project progress and challenges effectively to project managers.
  • Implemented workflow improvements during concrete operations to enhance efficiency.

Concrete Foreman

Southerland Industrial
Durham, North Carolina
01.2001 - 12.2001
  • Supervised concrete pouring and finishing operations across various construction projects.
  • Managed crew assignments while enforcing strict safety protocols.
  • Coordinated material deliveries and managed inventory of supplies and tools to prevent delays in project timelines.
  • Trained new workers on concrete mixing techniques and equipment operation, enhancing team skill levels and productivity.
  • Inspected work for quality assurance and compliance with project specifications.
  • Collaborated with project managers to schedule tasks and meet critical deadlines.
  • Implemented best practices for efficient concrete placement and curing processes.
  • Calculated required concrete quantities to ensure optimal resource allocation.

Carpenter /rebar/concrete installer

Duracon concrete inc
Durham, North Carolina
12.1999 - 12.2000
  • Constructed custom wooden frameworks, enhancing structural integrity for residential and commercial projects.
  • Operated hand and power tools to execute carpentry tasks efficiently.
  • Interpreted blueprints and technical drawings for precise measurements.
  • Maintained clean, safe work environment by adhering to safety protocols.
  • Trained junior carpenters in tool usage and carpentry best practices, fostering skill development and safety.
  • Adapted plans on-site to resolve issues, ensuring compliance with specifications and project timelines.
  • Installed drywall sheets onto walls or ceilings using nails or screws.
  • Measured, cut, and shaped wood materials using saws and chisels.

Rodbuster /concrete finisher/form installer

Citadel Contractor
Apex, North Carolina
05.1998 - 11.1999
  • Constructed and installed rebar frameworks for concrete structures.
  • Interpreted blueprints and specifications for accurate material placement.
  • Collaborated with team members to ensure project timelines were met.
  • Operated hand tools and machinery for cutting and bending rebar.
  • Inspected rebar for quality compliance before installation.
  • Maintained a safe work environment by following safety protocols.
  • Assisted in training new workers on rebar installation techniques.
  • Grind down rough edges of welds after assembly is complete using angle grinders or similar equipment.
  • Assemble cages made from reinforcing steel bars by welding them together at specified points.
  • Operate power tools such as hydraulic benders and hydraulic cutters to shape metal rods.
  • Assist in the installation of reinforcing steel bars into forms for concrete structures.
  • Secure rebar in place with tying wire or clamps for additional reinforcement.
  • Cut and bend rebar according to size specifications using hand tools such as hammers, wire cutters, and pliers.
  • Load and unload materials onto trucks at job sites using cranes or other lifting devices.
  • Organize materials on job sites so that they can be easily accessed by personnel working in the area.
  • Measure distances between anchor bolts using measuring tapes and rulers.
  • Communicate effectively with supervisors regarding progress of projects being worked on.
  • Train new employees in proper safety protocols when working with reinforced steel bars.
  • Conduct tests on concrete mixtures to ensure they meet structural strength requirements.
  • Follow standard operating procedures when setting up a job site prior to beginning any work activities.
  • Check alignment of rebar during installation processes with levels or transit instruments.
  • Apply protective coatings such as paint or epoxy to finished projects for added protection against corrosion.
  • Set up scaffolding around construction sites to provide safe access for workers while installing reinforcing steel bars.
  • Ensure that all safety precautions are taken when working with hazardous materials such as cement dust.
  • Signaled crane operators in safe and accurate lifting and placing of reinforcing iron members and moved rebars manually into specific positions.
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.
  • Managed materials and supplies for projects, expediting additional orders to prevent delays.
  • Led and mentored less-experienced ironworkers and assisted foremen in assigning work activities.
  • Prepared surfaces by removing debris and ensuring proper leveling.
  • Mixed concrete to achieve desired consistency and quality for projects.
  • Collaborated with team members to enhance workflow and meet project deadlines.
  • Followed safety protocols to ensure a safe working environment for all workers.
  • Applied finishing techniques using tools like trowels and floats for smooth surfaces.
  • Trained junior finishers on best practices and proper equipment usage.
  • Finished surfaces by hand-troweling or machine-troweling for a smooth finish.
  • Leveled and smoothed freshly placed concrete with a straight edge or float.
  • Used numerous types of power tools and other equipment daily.
  • Assisted in setting up formwork prior to pouring concrete.
  • Operated power vibrators to compact concrete into place.
  • Removed debris and waste to clean site after completing work.
  • Constructed forms to create various concrete structures.
  • Poured concrete into forms using pump hose and leveled.
  • Positioned wire mesh and rebar on work site to ensure proper reinforcement of concrete structures.
  • Dismantled forms using basic and advanced tools.
  • Inspected and maintained tools and equipment.
  • Measured and cut reinforcing steel bars in order to reinforce the structure.
  • Molded expansion joints and edges using edging tools, jointers, and straightedge.
  • Laid and repaired concrete to make level and long-lasting surfaces.
  • Ensured that proper grades were maintained throughout the project for drainage purposes.
  • Repaired damaged areas of existing concrete structures using appropriate materials.
  • Checked alignment of forms prior to pouring concrete ensuring accuracy of final product.
  • Placed steel pins using sledgehammer.
  • Installed expansion joints, sealants, and protective coatings on concrete surfaces to prevent damage and ensure longevity.
  • Upheld requirements for safe operations and reporting of incidents.
  • Used forklifts and other equipment to move materials and complete project work with construction team.
  • Calculated concrete quantities needed for jobs.
  • Sprayed curing compound uniformly on newly finished concrete surfaces to promote proper curing and strength.
  • Compacted grade using jumping jack or plate compactor equipment.
  • Provided assistance in completing projects within deadlines set by supervisor and client.
  • Assisted in loading and unloading supplies such as bags of cement onto trucks or wheelbarrows.
  • Troubleshot equipment issues and determined best courses of action for repairs.
  • Spread, leveled and smoothed concrete using rake or shovel.
  • Inspected completed projects for quality assurance purposes.
  • Produced rough concrete surface using brooms.
  • Set up scaffolding, braces, and other temporary structures to support crew during work.
  • Repaired unsafe curbs, gutters, sidewalks, driveways and roadways.
  • Protected surfaces from avoidable damages by using correct forming, bracing, preparation, and finishing techniques.
  • Installed anchor bolts, steel plates and other fixtures in freshly poured concrete.
  • Signaled truck driver to pour concrete and move chute, directing concrete on forms.
  • Set concrete forms to desired pitch and depth and aligned.
  • Reviewed project plans to identify materials and tools needed for each job.
  • Maintained inventory of supplies, materials and tools to complete work on job sites.
  • Inspected completed installations to ensure quality and compliance with regulations.
  • Directed concrete casting and supervised laborers, ensuring proper techniques were used for spreading.
  • Shaped rounded edges on corners with edger tool and created grooves to control cracking.
  • Trained new installers on proper installation techniques and safety protocols.
  • Removed systems and fixtures to prepare for replacements.
  • Utilized a variety of hand and power tools to cut, shape, and fit materials for installation.
  • Participated in ongoing training to stay updated on new installation techniques and product developments.

Carpenter

Sage Group Construction
Durham, North Carolina
04.1997 - 04.1998
  • Constructed frameworks for residential and commercial projects using diverse materials.
  • Utilized power and hand tools safely, contributing to overall job site efficiency.
  • Interpreted blueprints and technical drawings for precise measurements.
  • Trained new carpenters on proper tool techniques and safety protocols.
  • Addressed on-site issues swiftly, preventing potential project delays.
  • Maintained clean job sites, disposing of debris after each shift.
  • Measured, cut, and shaped wood materials to specifications with various tools.
  • Organized carpentry tasks effectively, keeping projects on schedule and within budget.

Concrete Finisher

Blair Concrete services
Raleigh, North Carolina
03.1995 - 03.1997
  • Poured concrete into forms and leveled surfaces for precision using pump hose.
  • Operated finishing tools to create smooth surfaces that met quality standards.
  • Prepared and mixed concrete according to specified proportions for construction projects.
  • Inspected completed work for quality assurance, rectifying discrepancies to uphold standards.
  • Collaborated with team members to ensure efficient project completion within deadlines.
  • Assisted in training new workers on concrete finishing techniques and tool usage.
  • Maintained safety of work areas by adhering to strict regulations and protocols.
  • Troubleshot equipment issues and performed repairs to sustain workflow.

Education

GED -

Honduras
Honduras CA
11-1993

Skills

  • Safety compliance
  • Team leadership
  • Quality assurance
  • Construction scheduling
  • Resource management
  • Material inventory oversight
  • Blueprint interpretation
  • Commercial construction expertise
  • Change order management
  • Site inspections
  • Safety meeting facilitation
  • Project safety
  • Scope management
  • OSHA certified professional
  • Construction supervision

Languages

English
Professional
Spanish
Professional

Work Preference

Salary Range

$120000/yr - $200000/yr

Timeline

Project Superintendent

BCG concrete
07.2025 - 01.2026

Project Superintendent

donleys concrete group
07.2015 - 07.2025

Concrete/Restoration Superintendent

Blair Duron Restoration
02.2009 - 06.2015

Concrete Manager/Construction Superintendent

Wm concrete LLC
02.2009 - 02.2013

Concrete Superintendent

Blair Concrete Services
01.2002 - 01.2009

Concrete Foreman

Southerland Industrial
01.2001 - 12.2001

Carpenter /rebar/concrete installer

Duracon concrete inc
12.1999 - 12.2000

Rodbuster /concrete finisher/form installer

Citadel Contractor
05.1998 - 11.1999

Carpenter

Sage Group Construction
04.1997 - 04.1998

Concrete Finisher

Blair Concrete services
03.1995 - 03.1997

GED -

Honduras
Walter Maldonadoconstruction and restoration superintendent