Overview
Work History
Timeline
Education
Owner/manager

Wenceslao Garcia

Taqueria Las Tapatias
Pearland,TX
25
Years of experience

Work History

Combo Pipe Welder

1 Month
Turner Sws | 02.2021 - 03.2021
  • Interpreted blueprints and isometric drawings to fabricate precise pipe welds
  • Performed GTAW, SMAW, and FCAW welding on carbon and stainless steel piping
  • Inspected welds for code compliance, alignment, and defect-free fit-up
  • Fit up complex pipe assemblies using hand tools, torches, and measuring devices

Combo Pipe Welder

11 Months
WorleyParsons | 04.2020 - 03.2021
  • Maintained welding equipment, consumables, and work area for safe, efficient operation
  • Collaborated with pipefitters and supervisors to resolve installation and repair issues
  • Mentored junior welders on welding techniques, safety practices, and quality standards
  • Adapted welding methods to meet fabrication requirements and tight project tolerances

Owner/manager

5 Years 8 Months
Taqueria Las Tapatias | 03.2021 - Current
  • Directed daily restaurant operations, ensuring smooth service, food quality, and customer satisfaction.
  • Managed staffing, scheduling, and training to maintain consistent front- and back-of-house performance.
  • Oversaw inventory ordering, vendor coordination, and supply control to support kitchen readiness.
  • Implemented cost controls for labor, food, and operating expenses to improve profitability.

Combo Pipe Welder

1 Year 8 Months
Gulfspan Industrial | 06.2018 - 02.2020
  • Optimized material usage by accurately measuring, cutting, and fitting pipes according to project specifications.
  • Improved weld quality by consistently adhering to proper welding techniques and maintaining a high level of precision in pipe alignment.
  • Increased project efficiency with timely completion of complex welding tasks, contributing to overall project success.
  • Achieved consistent weld integrity through careful preparation of materials and adherence to industry standards.
  • Demonstrated versatility in welding techniques such as SMAW, GTAW, GMAW, and FCAW, adapting to various project requirements with ease.

Combo Fitter/welder

6 Years 2 Months
Malone Industrial Machine | 12.2012 - 02.2019
  • Interpreted blueprints and technical drawings to fit precision machine components accurately.
  • Assembled, aligned, and adjusted industrial machinery to meet tight tolerance requirements.
  • Inspected parts using calipers, micrometers, and gauges to verify dimensional accuracy.
  • Performed layout, marking, and fit-up work for fabrication and repair projects.
  • Troubleshot mechanical issues and corrected misalignment during equipment assembly.
  • Coordinated with welders and machinists to complete complex machine builds efficiently.
  • Laid out, positioned, aligned and secured parts for welding and bolt-up.
  • Measured, marked, cut, bored, fitted and installed various piping or structural components in accordance with blueprints and job specifications using hand and power tools.
  • Improved overall project completion time through proficient use of hand tools, power tools, and specialized machinery.
  • Maximized tool lifespan through proper care and maintenance procedures resulting in reduced replacement costs.
  • Coordinated movement of materials and equipment to job sites.
  • Fabricated and installed various types of supports for piping systems and implemented proper hanger spacing.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Fabricated pipe spools for butt weld, socket weld and threaded systems utilizing proper fit up techniques such as root openings on butt weld fittings and set back on socket weld fittings.

Production Manager

11 Years 3 Months
Fast fabrications | 05.2001 - 08.2012
  • Directed daily production schedules to align staffing, materials, and equipment availability.
  • Coordinated cross-functional teams to resolve workflow bottlenecks and maintain output consistency.
  • Implemented process improvements to reduce waste and strengthen production efficiency.
  • Monitored quality standards and corrected deviations to support compliant finished goods.
  • Resolved issues quickly to maintain productivity goals.
  • Reduced waste and material costs by optimizing resource allocation and inventory management.
  • Estimated labor requirements to support anticipated workload.
  • Monitored team budgets to keep projects on task and avoid waste.
  • Partnered with leadership on recruiting, hiring and coaching production personnel.

Timeline

Owner/manager

Taqueria Las Tapatias
03.2021 - CurrentRead More

Combo Pipe Welder

Turner Sws
02.2021 - 03.2021Read More

Combo Pipe Welder

WorleyParsons
04.2020 - 03.2021Read More

Combo Pipe Welder

Gulfspan Industrial
06.2018 - 02.2020Read More

Combo Fitter/welder

Malone Industrial Machine
12.2012 - 02.2019Read More

Production Manager

Fast fabrications
05.2001 - 08.2012Read More

James Madison High

High School Diploma
Read More

Education

High School Diploma

James Madison High | Houston, TX
Wenceslao Garcia