Unlimited electrical journeyman with extensive experience at Chesapeake Energy Corporation, specializing in electrical installation and troubleshooting. Proven track record in enhancing team productivity and optimizing energy consumption. Skilled in wiring installation and electrical repairs, I excel in collaborative environments, ensuring efficient operations and safety compliance. Committed to delivering high-quality results in every project.
Overview
22
22
years of professional experience
Work History
Electrician/Operator
Scale Datacenters
04.2025 - 08.2025
Worked from ladders, scaffolds and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings, on roofs and on towers.
Installed and wired electrical transformers, service panels, and circuit breakers.
Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
Remodel of Data Center from 3 MW to 10 MW.
Assist with construction and overseeing Central Plant while work was be completed.
Electrical Technician II
Chesapeake/Expand Energy
01.2022 - 04.2025
Installed electrical conduit and wiring for power, controls, and lighting.
Performed emergency and operational procedures on generators and switchgears ,along with load banking generators.
Monitor plant and data raised floors on energy management system.
Assisted with emergency and scheduled shutdowns while performing regular electrical duties.
Used information in technical diagrams, schematics and manuals to understand operations and make successful repairs.
Troubleshoot and repair and/or replace VFDs.
Electrical Technician I
Chesapeake Energy Corporation
01.2016 - 01.2022
Replaced faulty wiring, switches and circuit breakers to reduce fire risks, boost service capacity and increase versatility.
Tested wiring and other system parts for electrical flow and function.
Disconnected and removed motors and pumps.
Tested, troubleshot, and calibrated equipment in shop and field.
Performed preventive maintenance tasks to verify proper working condition of electrical panels and conduits.
Installed, adjusted and calibrated electrical equipment and instrumentation to maintain proper performance.
Assisted in new equipment installations, guaranteeing proper setup and optimal performance.
Interpreted blueprints, schematics, drawings, and layouts to complete repairs.
Reduced downtime by troubleshooting and repairing faulty electrical components promptly.
Enhanced team productivity through training junior technicians on best practices and procedures.
Utilized advanced diagnostic tools such as multimeters and thermal imaging cameras to accurately diagnose electrical issues.
Remodels of office space and all other remodels.
Optimized energy consumption by retrofitting existing systems with energy-efficient solutions.
Maintenance Technician III/Sr Maintenance Tech
Chesapeake Energy Corporation
01.2011 - 01.2016
Operated varied hand and power tools to complete repairs.
Used problem-solving skills to alleviate issues efficiently with minimal supervision.
Troubleshot equipment breakdowns and performed preventive maintenance.
Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
Followed safety protocols to minimize workplace accidents.
Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
Contributed to a safer work environment, promptly addressing any identified hazards or concerns.
Performed electrical and mechanical repairs of production equipment to minimize downtime.
Monitored and documented work performance in maintenance logs in compliance with company guidelines.
Improved reliability of electrical systems by conducting thorough inspections and updates.
Maintenance Coordinator
Chesapeake Energy Corporation
01.2010 - 01.2010
Enhanced communication between departments, facilitating prompt responses to maintenance requests and reducing delays in repairs.
Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
Managed vendor relationships for timely delivery of parts and services, ensuring smooth operations within the facility.
Reviewed maintenance program for efficiency accuracy and timeliness, and provided feedback for improvement to company leadership.
Managed maintenance team of 6 employees and coordinated repair schedule according to priority level.
Maintenance Technician
Chesapeake Energy Corporation
01.2006 - 01.2010
Inspected and maintained equipment to keep items in top working condition.
Improved equipment functionality by conducting regular maintenance checks and repairs.
Collaborated with team members to complete larger repair projects efficiently.
Installed new locks, door handles, and door closers.
Performed preventive maintenance and repairs on various types of equipment.
Rewired and replaced faulty electrical components in equipment.
Electrical Apprentice
Ross Electric
01.2005 - 01.2006
commercial apprentence
Electrical Apprentice
Delaney Electric
03.2004 - 01.2006
residential apprentice
Electrical Apprentice
SMG
10.2003 - 04.2004
Commercial apprentice at Ford and Cox Center downtown OKC. Now the Paycom Center.